Statement of Work
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N00259-15-T-0161_Responses_to_Questions.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
ROBERT E. BUSH NAVAL HOSPITAL (NHTP)
MARINE AIR GROUND TASK FORCE TRAINING CENTER
MARINE CORPS AIR GROUND COMBAT CENTER
TWENTYNINE PALMS, CALIFORNIA 92278
GENERAL REQUIREMENTS: The effort required here under shall be performed in accordance with this Statement of Work and with all other terms and conditions set forth herein.
1. SCOPE. This Statement of Work (SOW) covers systems engineering, technical, and management support services to Robert E. Bush Naval Hospital’s Information Management Department. This service encompasses upgrading and installing REES Scientific software and hardware.
1.1 Background.
1.1.1 The general intent of this Scope of Work is to obtain installation and validation of REES Scientific Enterprise Centron-SW 3.0 software, Network Dialer, and sensor hardware.
2. LOCATION.
2.1 Information Management Department, Building 1145, Robert E. Bush Naval Hospital Twentynine Palms, Marine Air Ground Task Force Training Center, Marine Corps Air Ground Combat Center, Twentynine Palms, CA 92278.
3. REQUIREMENTS.
3.1 Enterprise Centron Upgrade and Equipment
| 3.1.1 | The contractor shall upgrade the REES Scientific Centron 2.0 to Enterprise Centron-SW environmental monitor featuring New Presidio Version 3.0 software (Part C.CEN-ENT-S3.0). |
| 3.1.2 | The contractor shall provide (QTY 1) Network Dialer (Part C. VOIP-DIALER-1) for use with the Virtualized Enterprise Centron installations. |
| 3.1.3 | The contractor shall provide (QTY 3) V2-NET (Part V2-NET) device that will connect transmitters at remote sites back to a central node over the network. |
| 3.1.4 | The contractor shall provide (QTY 11) REES Scientific transmitter for 1 input (Part V2-U-1). |
| 3.1.5 | The contractor shall provide (QTY 3) REES Scientific V2 Direct Sequence Spread Spectrum Universal wireless transmitter for 12 inputs (Part V2-U-2). |
| 3.1.6 | The contractor shall provide (QTY 12) Temperature Probes- Type 2 -15 to +60 Degrees C (Part TPT2). |
| 3.1.7 | The contractor shall provide (QTY 3) Temperature Probes- Type 3 -50 to +30 Degrees C (Part TPT3). |
| 3.1.8 | The contractor shall provide (QTY 2) Temperature Probes- Type 4 -90 to 10+ Degrees C (Part TPT4). |
| 3.1.9 | The contractor shall provide (QTY 2) REES Scientific Direct Sequence Spread Spectrum wireless temperature and humidity transmitter (Part V2-T/H). |
| 3.1.10 | The contractor shall provide (QTY 1) Validation Kit of Centron with Centron Presidio Software (PAR VAL-KIT-PRES). |
| 3.1.11 | The contractor shall provide (QTY 4) 3.6 volt lithium battery for V2 wireless transmitters (Part V2-BATT). |
| 3.1.12 | The contractor shall provide (QTY 4) 110 volt input, 6 volt DC output, 300 MA wall transformer for V2 wireless transmitter (Part V2-TRANS). |
| 3.1.13 | The contractor shall provide (1) Single Phase Installation that includes one (1) site visit to wire, install, program, configure, validate, and train users on system. Includes regulatory an IQ/OQ of System with full documentation provided to satisfy authorities. Comprehensive system test verifies, calibrates and documents all system functions including readings, databases, alarms, dial-outs, outputs, reports, and user programming. Includes approximately 100 page GMP/GLP IQ/OQ validation report, 1000 page software validation test report, calibration of temperature and humidity with traceable equipment and on-site training. |
3.2 Site Requirements
3.2.1 The contractor shall notify the Naval Hospital Information Management Department, twenty-four (24) hours prior to initiating any work i.e., training, maintenance, and/or other professional services stated in the contract.
3.2.2 The contractor may use Government utilities, (e.g., electrical power, compressed air, and water) that are available and required for any service performed under this contract. The building engineer, to ensure compatibility with the Naval Hospital electrical wiring and equipment, must approve contractor electrical equipment.
3.2.3 Contractor is required to be on-site will be required to contact the Information Management Department representative to submit the required information to complete the Security Pass Form by 1400 the day prior to the scheduled visit. In the case of emergent repairs/service, the contractor will wait at the main gate for an escort from Naval Hospital personnel.
3.2.4 Contractor is required to report to the Security Department staff, Robert E. Bush Naval Hospital Twentynine Palms, for Visitor Badges during the hours of 0800-1600, Monday through Friday, prior to and upon completion of any service/repair performed on-site.
3.2.5 The contractor shall perform all services necessary to complete the contract in a satisfactory and acceptable manner in full compliance with specifications and terms of the contract and adhere to all applicable Federal, State, and local regulations, including all environmental regulations. If additional services are required other than what is listed on scope of work, the Contractor shall notify Naval Medical Center San Diego of additional services changes required.
3.2.6 The contractor shall adhere to submitted contract; any and all changes by the Contractor must be approved by the Customer.