About this file
This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for Naval Undersea Warfare Center's Building 514 Epoxy Floor Coatings project. The amendment incorporates Wage Determination WA20250109 Mod 3 and provides detailed Pre-Proposal Inquiry Answers clarifying project specifications. Key details include confirmation that multiple rooms can be worked on simultaneously, with room 127A being the most critical, and requirements for liquid monopropellant OTTO fuel compatible epoxy per MIL-0-82672A, with Sherwin Williams RESUFLOR cited as a compatible product. The solicitation covers approximately 2,400 square feet of flooring, with contractors responsible for field verifying all site conditions prior to work commencement.
The amendment provides specific clarifications about project requirements, including electrical configurations (480V 3-phase panels available), working hours (8.5 hours between 0700-1600, Monday-Friday), safety markings, and floor preparation expectations. Contractors are advised that not all existing coating needs full removal, moisture testing is not required in all areas, and equipment removal will be handled by the government. The solicitation is set aside for small businesses with a government estimate ranging from $75,000 to $175,000, targeting a July 14, 2025 award date at the Naval Undersea Warfare Center in Keyport, Washington.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C26_WA20250109_20250606_Mod3.pdf | ||
| C12_Att_11_OSHA_Calculating_Injury_and_Illness_Incident_Rate.pdf | ||
| C12_Att_08_Bid_Form.xlsx | XLSX spreadsheet | |
| C12_Att_06_Schedule_of_Values.xlsx | XLSX spreadsheet | |
| C11d_Att_07_Past_Performance_References.docx | DOCX document | |
| C11b_Att_02_WA20250109_03072025.pdf | ||
| C12_Att_05_OPSEC_Guide_for_Defense_Contractors.pdf | ||
| C12_Att_03_Safety_Requirements_for_Contractors_and_Subcontractors.pdf | ||
| C12_Att_10_Safety_Data_Sheet.docx | DOCX document | |
| C12_Att_01_Material_Equipment_In_Place_List.xlsx | XLSX spreadsheet | |
| C12_Att_09_PPI_Form.docx | DOCX document | |
| C11_N0025325Q0010.pdf | ||
| C12_Att_04_Kpt_EV_Guide_for_Contractors_Jan_2025.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provi ded herei n, all t erms and condit ions of t he document refere nced in Item 9A or 10A, as heretofore change d, remai ns unchanged and in ful l force and effect .
15A. NAME AND TIT LE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
ST ANDARD FORM 30 (Rev. 10-83) Prescr ibed by GSA
FAR (48 CFR) 53.243
This amendment is issued to incorporate Wage Determination WA20250109 Mod 3 dated 06 June 2025 and Pre-Proposa Inquiry Answers.
The point of contact for this amendment is Michelle Farrales at michelle.a.f arrales.civ@us.navy.mil and James Wasson at james.k.wasson.civ@us.navy.mil.
1. CO NTRACT ID CODE P AGE OF P AGES
J 1 5
16A. NAME AND T ITLE OF CONTRACTING OFFICER (Type or print)
16C. DAT E SIGNED
BY 11-Jun-2025
16B. UNITED ST AT ES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contract ing Officer )(Signature of person authorized t o sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, Count y, Stat e and Zip Code) X N0025325Q0010
X 9B. DAT ED (SEE IT EM 11)
20-May-2025
10B. DAT ED (SEE IT EM 13)
9A. AMENDMENT OF SOLICITAT ION NO.
11. THIS IT EM ONLY APPLIES T O AMENDMENT S OF SOLICITATIONS
X The above numbered soli cit ati on i s amended as set forth in It em 14. The hour and date specified for rece ipt of Offer is ext ended, X is not extended.
Offer must acknowl edge rece ipt of t his amendment pri or to the hour and date specified in the sol ici tat ion or as amended by one of t he fol lowing methods:
(a) By compl eti ng Items 8 and 15, and returning 1 copi es of the amendment ; (b) By acknowledgi ng recei pt of thi s a mendment on each copy of t he offer submit ted;
or (c) By s epara te let ter or t elegram whi ch i ncludes a refe rence t o t he s olic ita tion and amendment numbers . FA ILURE OF YOU R A CKNOWLEDGMENT TO BE RECEIVED AT TH E P LACE D ESIGNATED FOR TH E RECEIPT OF OFFERS P RIO R TO THE HOUR AN D DATE SP ECIFIED MA Y RESULT IN
REJECTIO N OF YOUR OFFER. If by vir tue of thi s amendment you desire t o change an offer already submit ted, s uch c hange ma y be made by t ele gram or let ter, provided each t elegram or l ett er makes reference to the sol ici tat ion and this amendment , and is re ceived prior to the openi ng hour and dat e speci fi ed.
12. ACCOUNTING AND APPROPRIATION DAT A (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORT H IN ITEM 14 ARE MADE IN THE
CONT RACT ORDER NO. IN ITEM 10A.
B. T HE ABOVE NUMBERED CONT RACT /ORDER IS MODIFIED T O REFLECT THE ADMINIST RATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORT H IN ITEM 14, PURSUANT TO T HE AUTHORITY OF FAR 43.103(B).
C. T HIS SUPPLEMENT AL AGREEMENT IS ENT ERED INTO PURSUANT TO AUTHORITY OF:
D. OT HER (Specify type of modification and authorit y)
E. IMPORTANT: Contract or is not, is required to sign this document and return copies t o the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/cont ract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/ MODIFICATION NO. 5. P ROJECT NO .(If appli cable)
6. ISSUED BY
3. EFFECTIVE DATE
11-Jun-2025
CODE
NAVAL UNDERSEA WARFARE CENTER
ATTN: MICHELLE FARRALES
MICHELLE.A.FARRALES.CIV@US.NAVY.M IL
610 DOWELL STREET, BLDG 206
KEYPORT WA 98345
N00253 7. AD MINISTERED BY (If other t han item 6)
4. REQUISITION/PU RCHASE REQ. NO.
CODE
See I tem 6
FACILITY CODECODE
EMAIL:TEL:
N0025325Q0010
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been added by full text:
PPI ANSWERS
1) Please confirm escorts will be provided at no cost.
Confirmed.
2) Please confirm if only one room can be worked on and completed before moving on to the next.
More than one room can be worked at a time before moving to the next. Most critical room is room 127A. This shall be complete before proceeding.
3) Please confirm if a Is there a concrete surface prep (CSP) requirement?
Follow all Manufacturer’s Instructions and SOW IX. Work Description # 2, 4, 5
& 8.
4) Confirm moister tests will be required for rm 128 before epoxy installation.
Moisture not necessary.
5) Can you confirm if full removal of the entire coating is necessary?
Full removal is not necessary.
6) Please confirm if - 3-Phase, 480V,30-amp min 50amp, is readily available.
There are 480V 3-phase panels and bus ducts present in the building. Contractor will be responsible for supplying their own connections.
7) Confirm if we need to supply our own power for commercial grinders and industrial vacuum.
Standard 120V single-phase 20A receptacles are located throughout the building.
Other electrical configurations will be considered case-by-case.
8) Confirm all equipment and belongings will be removed by others in all spaces that require work.
Anything not Secured to the floor and can be moved will be removed by the
Government.
9) Confirm normal working hours for all processes.
Confirmed. The Government's regular working hours is an eight and one half (8.5) hour period between the hours of 0700 and 1600 five days per week, Monday through Friday, except observed Federal holidays. Arrangements may be made to start at 0600.
10) Confirm eye wash station will require 36”x36” identification markings on the floor in rm
127.
This is not required.
11) Confirm safety yellow markings will be required on the raised step to exit also in rm 127.
Confirmed.
12) Confirm All floors will be smooth and without waves or imperfections.
Existing floors are generally flat, smooth, and level. New flooring coatings shall be smooth and without waves or imperfections.
13) Confirm if all outside edges need to be prepped for integrated cove up the walls, for a seamless and easy to clean space with minimal inside corners.
This is not necessary. Coat and seal as previously applied.
14) I actually want to know the square footage area. Is there any information on the square footage for my estimate?
Square footage is approximately 2400 sq. ft.; however, the solicitation encourages all perspective offerors to: IX. Work Description, all dimensions provided by the Government are only approximations; the Contractor is responsible for field verifying all existing site conditions, dimensions, elevations, clearances, egresses and finishes at jobsite prior to commencement of any work.
15) I am interested in bidding this project for Epoxy replacement in building 514. I am not seeing any blueprints or schematics outlining building 514. If there is not a mandatory project walk through can I obtain photos and measurements from you in order to bid this.
Drawings and photos must be authorized for release. Drawing release cannot be obtained prior to solicitation end.
16) Are there any manufacturer or details required of the flooring you need? etc, thickness, color, abilities, and manufacturer or product name?
Provide liquid monopropellant OTTO fuel compatible Epoxy per MIL-0-82672A also covered under UFGS 09 67 23.14. Install Epoxy per manufacturer requirements and specifications. Sherwin Williams RESUFLOR is a known compatible product.
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 C12_Att_01_Material_Eq uipment_In_Place_List
20-MAY-2025
Attachment 10 C12_Att_10_Safety_Data _Sheet
20-MAY-2025
Attachment 11 C12_Att_11_OSHA_Calc ulating_Injury_and_Illnes s_Incident_Rat
20-MAY-2025
Attachment 2 C11b_Att_02_WA202501 09_03072025
20-MAY-2025
Attachment 3 C12_Att_03_Safety_Requ irements_for_Contractors _and_Subco
20-MAY-2025
Attachment 4 C12_Att_04_Kpt_EV_Gu ide_for_Contractors_Jan_
25-MAY-2025
Attachment 5 C12_Att_05_OPSEC_Gui de_for_Defense_Contract ors
20-MAY-2025
Attachment 6 C12_Att_06_Schedule_of _Values
20-MAY-2025
Attachment 7 C11d_Att_07_Past_Perfor mance_References
20-MAY-2025
Attachment 8 C12_Att_08_Bid_Form 20-MAY-2025 Attachment 9 C12_Att_09_PPI_Form 20-MAY-2025 to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 C12_Att_01_Material_Eq uipment_In_Place_List
20-MAY-2025
Attachment 10 C12_Att_10_Safety_Data _Sheet
20-MAY-2025
Attachment 11 C12_Att_11_OSHA_Calc ulating_Injury_and_Illnes s_Incident_Rat
20-MAY-2025
Attachment 2 C26_WA20250109_2025 0606_Mod3
Attachment 3 C12_Att_03_Safety_Requ irements_for_Contractors _and_Subco
20-MAY-2025
Attachment 4 C12_Att_04_Kpt_EV_Gu ide_for_Contractors_Jan_
25-MAY-2025
Attachment 5 C12_Att_05_OPSEC_Gui de_for_Defense_Contract ors
20-MAY-2025
Attachment 6 C12_Att_06_Schedule_of _Values
20-MAY-2025
Attachment 7 C11d_Att_07_Past_Perfor mance_References
20-MAY-2025
Attachment 8 C12_Att_08_Bid_Form 20-MAY-2025 Attachment 9 C12_Att_09_PPI_Form 20-MAY-2025
(End of Summary of Changes)