N0025322R00280004.pdf
PDF 835 KB Posted
- Solicitation number
- N00253-22-R-0028
About this file
This solicitation requests proposals for alkaline battery inserts to support the Naval Undersea Warfare Center's Underwater Tracking Range Equipment pingers program. Offerors must provide battery inserts in accordance with provided engineering drawings, with an initial base order of 2,000 units and two option quantities of 2,000 each. Proposals are due by June 1st, 2022. The award will be made as a lowest price technically acceptable contract to a small business. Batteries must meet a two-year shelf life and be delivered quarterly to four Navy locations. Offerors must have a NIST SP 800-171 assessment of basic confidence level at the time of proposal submission.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N0025322R00280003.pdf | ||
| N0025322R00280002.pdf | ||
| N0025322R00280001.pdf | ||
| Exhibit A01 CDRL-A001_N0025322R0028.pdf | ||
| N0025322R0028.pdf | ||
| Att 3_Section B Pricing_N0025322R0028.xlsx | XLSX spreadsheet | |
| Att 4_Past Performance References_N0025322R0028.docx | DOCX document | |
| Exhibit B01 CDRL-B001_N0025322R0028.pdf | ||
| Attachment 2 Government Furnished Information.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1300968244
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to 1) Respond to industry questions; 2) Add draw ings 5992750_A and 5992800 to Attachment (1)and corresponding CLINs; 3) Amend the SOW in Section C as contained herein. 4) Extend the closing date as show n herein.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 8
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 10-May-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N0025322R0028
X 9B. DATED (SEE ITEM 11)
09-May-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
31-Mar-2022
CODE
NAVAL UNDERSEA WARFARE CENTER
MICHAEL.LABERGE@NAVY.MIL
ATTN: MICHAEL LABERGE
610 DOWELL STREET BLDG 206
KEYPORT WA 98345
N00253 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N0025322R0028
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
QUESTIONS & ANSWERS (1-8)
Question 1: Please provide NAVSEA Drawing 5992800. This is the vibration test fixture reference in the Battery Insert Test Procedure, Document 7608507.
Answer 1: Drawing provided in Amendment 4.
Question 2: Please provide NAVSEA Drawing 5992750_A, Battery Package Assembly. This is also referred to in The Battery Insert Test Procedure Document 7608507.
Answer 2: Drawing provided in amendment 4.
Question 3: In Figure 4B of Battery Dry, Drawing 5992780, reference is made to top and bottom insulation, which we believe is “cardboard”. Please clarify.
Answer 3: Drawing 7609150 5.6 references the material used as insulation. Sections 3.4.4 and 6.1.1 reference the requirements for the insulation as 0.030” thick. The requirement is that the insulation material selected will allow the package to meet all dimensional tolerance requirement.
Question 4: Again in Figure 4B, is the insulation used on the pack sides also cardboard? This is not clear from the drawing package.
Answer 4: Sections 3.4.4 and 6.1.1 reference the requirements for the insulation as 0.030” thick. The requirement is that the insulation material selected will allow the package to meet all dimensional tolerance requirement.
Question 5: Also in Figure 4B, the shrink wrap is mentioned and it also states that there should be overlap. How much overlap is required?
Answer 5: The amount of overlap has been left to contractor discretion as long as the battery passes all requirements (dimensions, insulation, weight, etc).
Question 6: Also in Figure 4B, please provide more clarity on the “Battery Common Strap”.
Answer 6: The Battery Common Strap is the same material as the weldment tabs. Reference step 6.1.1 in drawing 5992780 suggests the use of nickel tabs.
Question 7: In Drawing 5992780 Para 3.5.4, the requirement is for the battery to survive and “operate” during the vibration environment. Does this mean we have to draw a load on the battery and monitor the voltage during the vibration? If so, how much of a load?
Answer 7: Yes, a load draw is required during vibration testing. The testing requirement in drawing 5992780 Para 3.5.4 is intended to demonstrate the mechanical and electrical integrity of the battery during operation.
The voltage and current be measured across a 100 ohm, 20W fixed load for each of the three strings.
Question 8: Will the vibration test fixture referenced in NAVSEA drawing 5992800 be provided as Government Furnished Equipment?
Answer 8: No Government Furnished Equipment is currently called out in the solicitation, however, the vibration test fixture referenced in NAVSEA drawing 5992800 can be provided as Government Furnished Equipment after award, if necessary.
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 03-May-2022 11:00 AM to 01-Jun-2022 11:00 AM.
The solicitation issue date has changed from 31-Mar-2022 to 09-May-2022.
The following have been deleted:
SOLICITATION/CONTRACT FORM
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN extended description has changed from:
In accordance with (IAW) NAVSEA Drawing 5992780, Rev L; associated drawings DL5992780_E, 53711- 5992751_NR, 5992782_NR, 5992783_NR, 7608507_B, 7608631_A, 7609150_A, 7609151_NRFirst Articles are required to verify that the vendor’s choice of construction and manufacturing methods result in a product that meets or exceeds the Government’s performance and other requirements IAW Section 2 of the Statement of Work (SOW).
Production quantities are contingent upon successful performance of First Article units.The Contractor shall provide test results for first articles.(CDRL A001, DI-NDTI-80809B)The Contractor shall provide a Failure Analysis and Corrective Action Report if there is a failure during testing of first article.(CDRL B001, DI-SESS-81927)First Articles may be waived for vendors that have already demonstrated that their construction and manufacturing provides the required results, per clause C-209-H003.
To:
In accordance with (IAW) NAVSEA Drawing 5992780, Rev L; associated drawings DL5992780_E, 53711- 5992751_NR, 5992782_NR, 5992783_NR, 7608507_B, 7608631_A, 7609150_A, 7609151_NR, 5992750_A, 5992800First Articles are required to verify that the vendor’s choice of construction and manufacturing methods result in a product that meets or exceeds the Government’s performance and other requirements IAW Section 2 of the Statement of Work (SOW). Production quantities are contingent upon successful performance of First Article units.The Contractor shall provide test results for first articles.(CDRL A001, DI-NDTI-80809B)The Contractor shall provide a Failure Analysis and Corrective Action Report if there is a failure during testing of first article.(CDRL B001, DI-SESS-81927)First Articles may be waived for vendors that have already demonstrated that their construction and manufacturing provides the required results, per clause C-209-H003.
CLIN 0002
5992751_NR, 5992782_NR, 5992783_NR, 7608507_B, 7608631_A, 7609150_A, 7609151_NR. Production units are to be produced in manufacturing lots delivered quarterly, (IAW) Section 7 of the Statement of Work (SOW).
Each production lot must have a shelf life and an expiration date that is valid two (2) years from date delivery, (IAW) Section 4 of the SOW.Production lots will be delivered quarterly to four (4) different locations IAW the Section's 7 and 8 of the SOW.The Contractor shall provide test results for production and option lots.(CDRL A001, DI-NDTI-80809B)The Contractor shall provide a Failure Analysis and Corrective Action Report if there is a failure during testing production and option lots.(CDRL B001, DI-SESS-81927)
5992751_NR, 5992782_NR, 5992783_NR, 7608507_B, 7608631_A, 7609150_A, 7609151_NR, 5992750_A, 5992800 . Production units are to be produced in manufacturing lots delivered quarterly, (IAW) Section 7 of the Statement of Work (SOW). Each production lot must have a shelf life and an expiration date that is valid two (2) years from date delivery, (IAW) Section 4 of the SOW.Production lots will be delivered quarterly to four (4) different locations IAW the Section's 7 and 8 of the SOW.The Contractor shall provide test results for production and option lots.(CDRL A001, DI-NDTI-80809B)The Contractor shall provide a Failure Analysis and Corrective Action Report if there is a failure during testing production and option lots.(CDRL B001, DI-SESS-81927)
CLIN 1002
In accordance with (IAW) NAVSEA Drawing 5992780, Rev L; associated drawings DL5992780_E, 53711- 5992751_NR, 5992782_NR, 5992783_NR, 7608507_B, 7608631_A, 7609150_A, 7609151_NR. Production units are to be produced in manufacturing lots delivered quarterly, in accordance with (IAW) Section 7 of the Statement of Work (SOW). Each production lot must have a shelf life and an expiration date that is valid two (2) years from date delivery, (IAW) Section 4 of the SOW.Production lots will be delivered quarterly to four (4) different locations IAW the Section's 7 and 8 of the SOW.The Contractor shall provide test results for production and option lots.(CDRL A001, DI-NDTI-80809B)The Contractor shall provide a Failure Analysis and Corrective Action Report if there is a failure during testing production and option lots.(CDRL B001, DI-SESS-81927)
5992751_NR, 5992782_NR, 5992783_NR, 7608507_B, 7608631_A, 7609150_A, 7609151_NR, 5992750_A, 5992800. Production units are to be produced in manufacturing lots delivered quarterly, in accordance with (IAW) Section 7 of the Statement of Work (SOW). Each production lot must have a shelf life and an expiration date that is valid two (2) years from date delivery, (IAW) Section 4 of the SOW.Production lots will be delivered quarterly to four (4) different locations IAW the Section's 7 and 8 of the SOW.The Contractor shall provide test results for production and option lots.(CDRL A001, DI-NDTI-80809B)The Contractor shall provide a Failure Analysis and Corrective Action Report if there is a failure during testing production and option lots.(CDRL B001, DI-SESS- 81927)
CLIN 2002
5992751_NR, 5992782_NR, 5992783_NR, 7608507_B, 7608631_A, 7609150_A, 7609151_NR. Production units are to be produced in manufacturing lots delivered quarterly, in accordance with (IAW) Section 7 of the Statement of Work (SOW). Each production lot must have a shelf life and an expiration date that is valid two (2) years from date delivery, (IAW) Section 4 of the SOW.Production lots will be delivered quarterly to four (4) different locations IAW the Section's 7 and 8 of the SOW.The Contractor shall provide test results for production and option lots.(CDRL A001, DI-NDTI-80809B)The Contractor shall provide a Failure Analysis and Corrective Action Report if there is a failure during testing production and option lots.(CDRL B001, DI-SESS-81927)
5992751_NR, 5992782_NR, 5992783_NR, 7608507_B, 7608631_A, 7609150_A, 7609151_NR, 5992750_A, 5992800. Production units are to be produced in manufacturing lots delivered quarterly, in accordance with (IAW) Section 7 of the Statement of Work (SOW). Each production lot must have a shelf life and an expiration date that is valid two (2) years from date delivery, (IAW) Section 4 of the SOW.Production lots will be delivered quarterly to four (4) different locations IAW the Section's 7 and 8 of the SOW.The Contractor shall provide test results for production and option lots.(CDRL A001, DI-NDTI-80809B)The Contractor shall provide a Failure Analysis and Corrective Action Report if there is a failure during testing production and option lots.(CDRL B001, DI-SESS- 81927)
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
STATEMENT OF WORK
Statement of Work:
1. Scope:
The contract requirement is for the manufacturing of Alkaline Battery Inserts for one base quantity and two option quantities. The base requirement shall include First Article units (unless waived), periodic units, and production units. Each option quantity shall have periodic units and production units. Delivery will be quarterly and issued to four separate locations as stated in sections 7 and 8.
2. First Article:
Successful performance is considered meeting or exceeding the requirements set forth in NAVSEA Drawings 5992780_L, DL5992780_E, 5992751_NR, 5992782_NR, 5992783_NR, 7608507_B, 7608631_A, 7609150_A, 7609151_NR, 5992750_A, 5992800
First Articles shall consist of three (3) units. First Articles are required to verify that the vendor’s choice of construction and manufacturing methods result in a product that meets or exceeds the government’s performance and other requirements. First Articles may be waived for vendors that have already demonstrated that their construction and manufacturing provides the required results, per clause C-209- H003. First Articles shall be sent to NUWC Keyport for testing and inspection.
At this time, no Government Furnished Material (GFM) or Government Furnished Equipment (GFE) has been identified for transfer to the Contractor. If it is determined that GFM/GFE is required, a contract modification will be issued with an attachment identifying the GFM/GFE. GFP is furnished in an “as-is” condition and the Contractor shall comply with physical inspection requirements in accordance with established procedures.
Production quantities are contingent upon successful performance of First Article units.
The government reserves the right to perform any testing necessary to make this determination.
The Contractor shall provide test results for first articles.
(CDRL A001, DI-NDTI-80809B)
The Contractor shall provide a Failure Analysis and Corrective Action Report if there is a failure during testing of first article.
(CDRL B001, DI-SESS-81927)
3. Periodic Production Units:
Successful performance is considered meeting or exceeding the requirement set forth in NAVSEA Drawings 5992780_L, DL5992780_E, 5992751_NR, 5992782_NR, 5992783_NR, 7608507_B, 7608631_A, 7609150_A, 7609151_NR, 5992750_A, 5992800. The government reserves the right to perform any testing necessary to make this determination.
Periodic lot samples will be 20 units randomly selected from the quarterly production lot. Periodic units shall be delivered to NUWC Division Keyport, Keyport WA for inspection and acceptance.
Periodic units and production lots will be delivered at the same time.
4. Production Units:
Successful performance is considered meeting or exceeding the requirements set forth in NAVSEA Drawings 5992780_L, DL5992780_E, 5992751_NR, 5992782_NR, 5992783_NR, 7608507_B, 7608631_A, 7609150_A, 7609151_NR, 5992750_A, 5992800 . The government reserves the right to perform any testing necessary to make this determination.
Production units are to be produced in manufacturing lots delivered quarterly. Each production lot must have a shelf life and an expiration date that is valid two (2) years from date delivered.
Production lots will be delivered quarterly to four (4) different locations identified in section 7 and 8
The Contractor shall provide test results for production and option lots.
(CDRL A001, DI-NDTI-80809B)
The Contractor shall provide a Failure Analysis and Corrective Action Report if there is a failure during testing production and option lots.
(CDRL B001, DI-SESS-81927)
5. Constructive Acceptance:
Constructive acceptance for first articles and periodic units shall be 45 days after receipt.
6. Additional Design Requirement:
Any shrink wrap or other material used to cover-wrap the assembly must be transparent.
7. Production Lot Delivery Schedule: (Applicable to CLIN’s 0002, 1002 and 2002)
Delivery Schedule:
NUWC
Keyport
NUWC DET
Pacific, Pearl
Harbor HI NUWC DET AUTEC NUWC DET San
Diego Total:
31 January 170 100 160 80 510 30 April 180 80 170 80 510 31 July 180 100 170 70 520
31 October 160 80 140 80 460
8. FOB Destinations:
NUWC Keyport:
Supply Officer Naval Undersea Warfare Center, Division Keyport
ATTN: TBD
610 Dowell Street
BLDG 40
Keyport WA 98345-7610
NUWC DET Pacific, Pearl Harbor, HI:
Officer-In-Charge
NAVUNSEAWARCEN DET PACIFIC
ATTN:
1894 Wasp Blvd.
BLDG 459
JBPHH, HI 96860-5809
NUWC DET AUTEC, West Palm Beach, FL:
Officer-In-Charge Naval Undersea Warfare Center Detachment AUTEC:
ATTN:
801 Clematis Street Suite 1 West palm Beach, FL 33401-5116
NUWCKPT, San Diego CA Officer-In-Charge NUWC, NAS North Island
ATTN:
BLDG 1293
San Diego, CA 92123-1591
9. Drawing Package:
5992780_L
DL5992780_E
5992751_NR
5992782_NR
5992783_NR
7608507_B 7608631_A 7609150_A
7609151_NR
5992750_A 5992800
(End of Summary of Changes)
File details come from the government source that posted it. Updated .