This solicitation is for 15-foot oil-filled pressure switches to be manufactured and delivered according to Navy specifications and drawings. The base requirement is for 20 first article switches to be delivered 180 days after contract award, along with 500 production switches including 8 sample switches. There are also four one-year options for additional lots of 250 switches each. The switches will be used in exercise torpedoes and must withstand full ocean depths and pressures. The Navy will provide required test equipment as government furnished property. The solicitation number will be N0025321R0010 and the contract will be firm-fixed-price. The response due date will be posted on betaSAM along with restricted technical drawings.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 12:00 PM local time 04 Feb 2021

X

A X B X C X D

EX

X

G F 79 - 85

86 - 96 X H 97 - 104

NISHANTH.SUKASI@NAVY.MIL

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

DO-C9 1 104

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

N00253 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

NISHANTH SUKASI 360-396-2168

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 17

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

18 - 26 27 - 29

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

30 - 34 35 - 38

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 39 - 48 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 49 - 50 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

51 - 77

PART II - CONTRACT CLAUSES

NAVAL UNDERSEA WARFARE CENTER

ATTN: NISHANTH SUKASI

NISHANTH.SUKASI@NAVY.MIL

610 DOWELL ST BLDG 206

KEYPORT WA 98345-7610

360-396-2168

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

05 Jan 2021

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

N0025321R0010

Section B - Supplies or Services and Prices

FOREIGN MILITARY SALES

Portions of f this requirement may support Foreign Military Sales (FMS). Contract Line Item Numbers (CLINS) may be subdivided into priced Sub-line Items Numbers (SLINs) at award or option exercise for funding purposes only. Item quantities will not change.

Unites States (U.S.) and FMS countries will be clearly identified at the CLIN or SLIN level, as required, and FMS case numbers will be provided.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 20 Each First Article- Pressure Switches

FFP

Oil Filled Pressure Switch, manufactured in accordance with drawing 6277300 Rev J + Notice of Revision (NOR) 54/NUWC-K/19041-NOR 003, Weapon Specification (WS) 22017 Rev H, the Statement of Work (SOW), and all associated drawings and specifications.

UMM 000000001017274878

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FOB: Destination

NET AMT

0002 4 Each Pressure Switches- Production Lot Sample

FFP

Oil Filled Pressure Switch, manufactured in accordance with drawing 6277300J + NOR 54/NUWC-K/19041-003, WS22017H, the SOW, and all associated drawings and specifications.

In accordance with WS22017H, the sample lot consists of four (4) switches randomly selected from the production of each 250 switches. The remaining 246 switches are to be delivered simultaneously with the sample lot.

UMM 000000001017274878

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD

0003 246 Each Production Units- Pressure Switches

FFP

Oil Filled Pressure Switch, manufactured in accordance with drawing 6277300J + NOR 54/NUWC-K/19041-003, WS22017H, the SOW, and all associated drawings and specifications.

The remaining 246 switches are to be delivered simultaneously with the sample lot.

UMM 000000001017274878

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD

0004 1

CDRL

FFP

CDRLs, DD1423, A001, A002, and A003. Lot reports are to be delivered with each delivered lot, A002.

Contract Data Requirement List (CDRL) in accordance with the Statement of Work (SOW). THIS CLIN IS NOT SEPARATELY PRICED.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD

0005 4 Each Pressure Switches- Production Lot Sample

FFP

Oil Filled Pressure Switch, manufactured in accordance with drawing 6277300J + NOR 54/NUWC-K/19041-003, WS22017H, the SOW, and all associated drawings and specifications.

In accordance with WS22017H, the sample lot consists of four (4) switches randomly selected from the production of each 250 switches. The remaining 246 switches are to be delivered simultaneously with the sample lot.

UMM 000000001017274878

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD

0006 246 Each Production Units- Pressure Switches

FFP

Oil Filled Pressure Switch, manufactured in accordance with drawing 6277300J + NOR 54/NUWC-K/19041-003, WS22017H, the SOW, and all associated drawings and specifications.

The remaining 246 switches are to be delivered simultaneously with the sample lot.

UMM 000000001017274878

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD

0007 1

CDRL

FFP

CDRLs, DD1423, A001, A002, and A003. Lot reports are to be delivered with each delivered lot, A002.

Contract Data Requirement List (CDRL) in accordance with the Statement of Work (SOW). THIS CLIN IS NOT SEPARATELY PRICED.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD

1002 4 Each OPTION Pressure Switches- Production Lot Sample

FFP

Oil Filled Pressure Switch, manufactured in accordance with drawing 6277300J + NOR 54/NUWC-K/19041-003, WS22017H, the SOW, and all associated drawings and specifications.

In accordance with WS22017H, the sample lot consists of four (4) switches randomly selected from the production of each 250 switches. The remaining 246 switches are to be delivered simultaneously with the sample lot.

UMM 000000001017274878

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD

1003 246 Each OPTION Production Units- Pressure Switches

FFP

Oil Filled Pressure Switch, manufactured in accordance with drawing 6277300J + NOR 54/NUWC-K/19041-003, WS22017H, the SOW, and all associated drawings and specifications.

The remaining 246 switches are to be delivered simultaneously with the sample lot.

UMM 000000001017274878

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD

1004 1

OPTION CDRL

FFP

CDRLs, DD1423, A001, A002, and A003. Lot reports are to be delivered with each delivered lot, A002.

Contract Data Requirement List (CDRL) in accordance with the Statement of Work (SOW). THIS CLIN IS NOT SEPARATELY PRICED.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD

1005 4 Each OPTION Pressure Switches- Production Lot Sample

FFP

Oil Filled Pressure Switch, manufactured in accordance with drawing 6277300J + NOR 54/NUWC-K/19041-003, WS22017H, the SOW, and all associated drawings and specifications.

In accordance with WS22017H, the sample lot consists of four (4) switches randomly selected from the production of each 250 switches. The remaining 246 switches are to be delivered simultaneously with the sample lot.

UMM 000000001017274878

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD

1006 246 Each OPTION Production Units- Pressure Switches

FFP

Oil Filled Pressure Switch, manufactured in accordance with drawing 6277300J + NOR 54/NUWC-K/19041-003, WS22017H, the SOW, and all associated drawings and specifications.

The remaining 246 switches are to be delivered simultaneously with the sample lot.

UMM 000000001017274878

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD

1007 1

OPTION CDRL

FFP

CDRLs, DD1423, A001, A002, and A003. Lot reports are to be delivered with each delivered lot, A002.

Contract Data Requirement List (CDRL) in accordance with the Statement of Work (SOW). THIS CLIN IS NOT SEPARATELY PRICED.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD

2002 4 Each OPTION Pressure Switches- Production Lot Sample

FFP

Oil Filled Pressure Switch, manufactured in accordance with drawing 6277300J + NOR 54/NUWC-K/19041-003, WS22017H, the SOW, and all associated drawings and specifications.

In accordance with WS22017H, the sample lot consists of four (4) switches randomly selected from the production of each 250 switches. The remaining 246 switches are to be delivered simultaneously with the sample lot.

UMM 000000001017274878

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD

2003 246 Each OPTION Production Units- Pressure Switches

FFP

Oil Filled Pressure Switch, manufactured in accordance with drawing 6277300J + NOR 54/NUWC-K/19041-003, WS22017H, the SOW, and all associated drawings and specifications.

The remaining 246 switches are to be delivered simultaneously with the sample lot.

UMM 000000001017274878

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD

2004 1

OPTION CDRL

FFP

CDRLs, DD1423, A001, A002, and A003. Lot reports are to be delivered with each delivered lot, A002.

Contract Data Requirement List (CDRL) in accordance with the Statement of Work (SOW). THIS CLIN IS NOT SEPARATELY PRICED.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD

2005 4 Each OPTION Pressure Switches- Production Lot Sample

FFP

Oil Filled Pressure Switch, manufactured in accordance with drawing 6277300J + NOR 54/NUWC-K/19041-003, WS22017H, the SOW, and all associated drawings and specifications.

In accordance with WS22017H, the sample lot consists of four (4) switches randomly selected from the production of each 250 switches. The remaining 246 switches are to be delivered simultaneously with the sample lot.

UMM 000000001017274878

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD

2006 246 Each OPTION Production Units- Pressure Switches

FFP

Oil Filled Pressure Switch, manufactured in accordance with drawing 6277300J + NOR 54/NUWC-K/19041-003, WS22017H, the SOW, and all associated drawings and specifications.

The remaining 246 switches are to be delivered simultaneously with the sample lot.

UMM 000000001017274878

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD

2007 1

OPTION CDRL

FFP

CDRLs, DD1423, A001, A002, and A003. Lot reports are to be delivered with each delivered lot, A002.

Contract Data Requirement List (CDRL) in accordance with the Statement of Work (SOW). THIS CLIN IS NOT SEPARATELY PRICED.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD

3002 4 Each OPTION Pressure Switches- Production Lot Sample

FFP

Oil Filled Pressure Switch, manufactured in accordance with drawing 6277300J + NOR 54/NUWC-K/19041-003, WS22017H, the SOW, and all associated drawings and specifications.

In accordance with WS22017H, the sample lot consists of four (4) switches randomly selected from the production of each 250 switches. The remaining 246 switches are to be delivered simultaneously with the sample lot.

UMM 000000001017274878

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD

3003 246 Each OPTION Production Units- Pressure Switches

FFP

Oil Filled Pressure Switch, manufactured in accordance with drawing 6277300J + NOR 54/NUWC-K/19041-003, WS22017H, the SOW, and all associated drawings and specifications.

The remaining 246 switches are to be delivered simultaneously with the sample lot.

UMM 000000001017274878

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD

3004 1

OPTION CDRL

FFP

CDRLs, DD1423, A001, A002, and A003. Lot reports are to be delivered with each delivered lot, A002.

Contract Data Requirement List (CDRL) in accordance with the Statement of Work (SOW). THIS CLIN IS NOT SEPARATELY PRICED.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD

3005 4 Each OPTION Pressure Switches- Production Lot Sample

FFP

Oil Filled Pressure Switch, manufactured in accordance with drawing 6277300J + NOR 54/NUWC-K/19041-003, WS22017H, the SOW, and all associated drawings and specifications.

In accordance with WS22017H, the sample lot consists of four (4) switches randomly selected from the production of each 250 switches. The remaining 246 switches are to be delivered simultaneously with the sample lot.

UMM 000000001017274878

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD

3006 246 Each OPTION Production Units- Pressure Switches

FFP

Oil Filled Pressure Switch, manufactured in accordance with drawing 6277300J + NOR 54/NUWC-K/19041-003, WS22017H, the SOW, and all associated drawings and specifications.

The remaining 246 switches are to be delivered simultaneously with the sample lot.

UMM 000000001017274878

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD

3007 1

OPTION CDRL

FFP

CDRLs, DD1423, A001, A002, and A003. Lot reports are to be delivered with each delivered lot, A002.

Contract Data Requirement List (CDRL) in accordance with the Statement of Work (SOW). THIS CLIN IS NOT SEPARATELY PRICED.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD

4002 4 Each OPTION Pressure Switches- Production Lot Sample

FFP

Oil Filled Pressure Switch, manufactured in accordance with drawing 6277300J + NOR 54/NUWC-K/19041-003, WS22017H, the SOW, and all associated drawings and specifications.

In accordance with WS22017H, the sample lot consists of four (4) switches randomly selected from the production of each 250 switches. The remaining 246 switches are to be delivered simultaneously with the sample lot.

UMM 000000001017274878

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD

4003 246 Each OPTION Production Units- Pressure Switches

FFP

Oil Filled Pressure Switch, manufactured in accordance with drawing 6277300J + NOR 54/NUWC-K/19041-003, WS22017H, the SOW, and all associated drawings and specifications.

The remaining 246 switches are to be delivered simultaneously with the sample lot.

UMM 000000001017274878

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD

4004 1

OPTION CDRL

FFP

CDRLs, DD1423, A001, A002, and A003. Lot reports are to be delivered with each delivered lot, A002.

Contract Data Requirement List (CDRL) in accordance with the Statement of Work (SOW). THIS CLIN IS NOT SEPARATELY PRICED.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD

4005 4 Each OPTION Pressure Switches- Production Lot Sample

FFP

Oil Filled Pressure Switch, manufactured in accordance with drawing 6277300J + NOR 54/NUWC-K/19041-003, WS22017H, the SOW, and all associated drawings and specifications.

In accordance with WS22017H, the sample lot consists of four (4) switches randomly selected from the production of each 250 switches. The remaining 246 switches are to be delivered simultaneously with the sample lot.

UMM 000000001017274878

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD

4006 246 Each OPTION Production Units- Pressure Switches

FFP

Oil Filled Pressure Switch, manufactured in accordance with drawing 6277300J + NOR 54/NUWC-K/19041-003, WS22017H, the SOW, and all associated drawings and specifications.

The remaining 246 switches are to be delivered simultaneously with the sample lot.

UMM 000000001017274878

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD

4007 1

OPTION CDRL

FFP

CDRLs, DD1423, A001, A002, and A003. Lot reports are to be delivered with each delivered lot, A002.

Contract Data Requirement List (CDRL) in accordance with the Statement of Work (SOW). THIS CLIN IS NOT SEPARATELY PRICED.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD

Section C - Descriptions and Specifications

STATEMENT OF WORK (SOW)

See Attachment 1, SOW

CLAUSES INCORPORATED BY FULL TEXT

C-202-H001 ADDITIONAL DEFINITIONS–BASIC (NAVSEA) (OCT 2018)

(a) Department - means the Department of the Navy.

(b) Commander, Naval Sea Systems Command - means the Commander of the Naval Sea Systems Command of the Department of the Navy or his duly appointed successor.

(c) References to The Federal Acquisition Regulation (FAR) - All references to the FAR in this contract shall be deemed to also reference the appropriate sections of the Defense FAR Supplement (DFARS), unless clearly indicated otherwise.

(d) National Stock Numbers - Whenever the term Federal Item Identification Number and its acronym FIIN or the term Federal Stock Number and its acronym FSN appear in the contract, order or their cited specifications and standards, the terms and acronyms shall be interpreted as National Item Identification Number (NIIN) and National Stock Number (NSN) respectively which shall be defined as follows:

(1) National Item Identification Number (NIIN). The number assigned to each approved Item Identification under the Federal Cataloging Program. It consists of nine numeric characters, the first two of which are the National Codification Bureau (NCB) Code. The remaining positions consist of a seven digit non-significant number.

(2) National Stock Number (NSN). The National Stock Number (NSN) for an item of supply consists of the applicable four-position Federal Supply Class (FSC) plus the applicable nine-position NIIN assigned to the item of supply.

(End of text)

C-204-H001 USE OF NAVY SUPPORT CONTRACTORS FOR OFFICIAL CONTRACT FILES (NAVSEA)

(OCT 2018)

(a) NAVSEA may use a file room management support contractor, hereinafter referred to as "the support contractor", to manage its file room, in which all official contract files, including the official file supporting this procurement, are retained. These official files may contain information that is considered a trade secret, proprietary, business sensitive or otherwise protected pursuant to law or regulation, hereinafter referred to as “protected information”. File room management services consist of any of the following: secretarial or clerical support; data entry; document reproduction, scanning, imaging, or destruction; operation, management, or maintenance of paper-based or electronic mail rooms, file rooms, or libraries; and supervision in connection with functions listed herein.

(b) The cognizant Contracting Officer will ensure that any NAVSEA contract under which these file room management services are acquired will contain a requirement that:

(1) The support contractor not disclose any information;

(2) Individual employees are to be instructed by the support contractor regarding the sensitivity of the official contract files;

(3) The support contractor performing these services be barred from providing any other supplies and/or services, or competing to do so, to NAVSEA for the period of performance of its contract and for an additional three years thereafter unless otherwise provided by law or regulation; and,

(4) In addition to any other rights the contractor may have, it is a third party beneficiary who has the right of direct action against the support contractor, or any person to whom the support contractor has released or disclosed protected information, for the unauthorized duplication, release, or disclosure of such protected information.

(c) Execution of this contract by the contractor is considered consent to NAVSEA's permitting access to any information, irrespective of restrictive markings or the nature of the information submitted, by its file room management support contractor for the limited purpose of executing its file room support contract responsibilities.

(d) NAVSEA may, without further notice, enter into contracts with other contractors for these services. Contractors should enter into separate non-disclosure agreements with the file room contractor. Contact the Procuring Contracting Officer for contractor specifics. However, any such agreement will not be considered a prerequisite before information submitted is stored in the file room or otherwise encumber the government.

C-209-H001 FIRST ARTICLE (CONTRACTOR TESTING) (NAVSEA) (OCT 2018)

(a) The First Article shall conform in every respect to the requirements of this contract. The First Article shall be manufactured with tools, materials, and methods which are the same as the tools, material and methods which will be used to manufacture the production units. All items delivered under the contract shall be manufactured under the same conditions and quality established by the First Article. Any changes to tools, material, or methods after the first article approval shall be documented by the contractor and approved by the Contracting Officer before they are used.

(b) The Contractor shall make a record of all data obtained during such tests in a form similar to the guidance provided in MIL-HDBK-831A.

(c) Pursuant to paragraph (e) of the clause entitled "First Article Approval--Contractor Testing" (FAR 52.209-3), the First Article shall not be delivered as part of the production quantity.

C-209-H003 WAIVER OF FIRST ARTICLE REQUIREMENTS (NAVSEA) (OCT 2018)

If the First Article is waived by the Government, the Contractor shall deliver supplies that are identical or substantially identical to those previously accepted by the Government under the following contract(s):

(Offeror to fill in contract number(s), as applicable. See Section M)

(End of Text)

C-211-H016 SPECIFICATIONS AND STANDARDS (NAVSEA) (OCT 2018)

(a) Definitions.

(i) A "zero-tier reference" is a specification, standard, or drawing that is cited in the contract (including its attachments).

(ii) A "first-tier reference" is either: (1) a specification, standard, or drawing cited in a zero-tier reference, or (2) a specification cited in a first-tier drawing.

(b) Requirements. All zero-tier and first-tier references, as defined above, are mandatory for use. All lower tier references shall be used for guidance only unless specifically identified below.

None

C-211-H017 UPDATING SPECIFICATIONS AND STANDARDS (NAVSEA) (DEC 2018)

The contractor may request that this contract be updated to include the current version of the applicable specification or standard if the update does not affect the form, fit or function of any deliverable item or increase the cost/price of the item to the Government. The contractor should submit update requests to the Procuring Contracting Officer with copies to the Administrative Contracting Officer and cognizant program office representative for approval. The contractor shall perform the contract in accordance with the existing specifications and standards until notified of approval/disapproval of its request to update by the Procuring Contracting Officer. Any approved alternate specifications or standards will be incorporated into the contract.

C-211-H018 APPROVAL BY THE GOVERNMENT (NAVSEA) (JAN 2019)

Approval by the Government as required under this contract and applicable specifications shall not relieve the Contractor of its obligation to comply with the specifications and with all other requirements of the contract, nor shall it impose upon the Government any liability it would not have had in the absence of such approval.

C-215-H002 CONTRACTOR PROPOSAL (NAVSEA) (OCT 2018)

(a) Performance of this contract by the Contractor shall be conducted and performed in accordance with the detailed obligations to which the Contractor committed itself in Proposal TBD dated TBD in response to Solicitation No.

N0025321R0010.

(b) The technical volume(s) of the Contractor's proposal is(are) hereby incorporated by reference and made subject to the "Order of Precedence" (FAR 52.215-8) clause of this contract. Under the "Order of Precedence" clause, the technical volume(s) of the Contractor's proposal referenced herein is (are) hereby designated as item (f) of the clause, following "the specifications" in the order of precedence.

C-227-H006 DATA REQUIREMENTS (NAVSEA) (OCT 2018)

The data to be furnished hereunder shall be prepared in accordance with the Contract Data Requirements List, DD Form 1423, Exhibit(s) A and B, attached hereto.

C-233-H001 DOCUMENTATION OF REQUESTS FOR EQUITABLE ADJUSTMENT--BASIC (NAVSEA) (OCT 2018)

(a) For the purposes of this special contract requirement, the term "change" includes not only a change that is made pursuant to a written order designated as a "change order" but also (1) an engineering change proposed by the Government or by the Contractor and (2) any act or omission to act on the part of the Government in respect of which a request is made for equitable adjustment.

(b) Whenever the Contractor requests or proposes an equitable adjustment of $100,000 or more per vessel in respect to a change made pursuant to a written order designated as a "change order" or in respect to a proposed engineering change and whenever the Contractor requests an equitable adjustment in any amount in respect to any other act or omission to act on the part of the Government, the proposal supporting such request shall contain the following information for each individual item or element of the request:

(1) A description (i) of the work required by the contract before the change, which has been deleted by the change, and (ii) of the work deleted by the change which already has been completed. The description is to include a list of components, equipment, and other identifiable property involved. Also, the status of manufacture, procurement, or installation of such property is to be indicated. Separate description is to be furnished for design and production work.

Items of raw material, purchased parts, components and other identifiable hardware, which are made excess by the change and which are not to be retained by the Contractor, are to be listed for later disposition;

(2) Description of work necessary to undo work already completed which has been deleted by the change;

(3) Description of work not required by the terms hereof before the change, which is substituted or added by the change. A list of components and equipment (not bulk materials or items) involved should be included. Separate descriptions are to be furnished for design work and production work;

(4) Description of interference and inefficiencies in performing the change;

(5) Description of each element of disruption and exactly how work has been, or will be disrupted:

(i) The calendar period of time during which disruption occurred, or will occur;

(ii) Area(s) aboard the vessel where disruption occurred, or will occur;

(iii) Trade(s) disrupted, with a breakdown of manhours for each trade;

(iv) Scheduling of trades before, during, and after period of disruption;

(v) Description of measures taken to lessen the disruptive effect of the change;

(6) Delay in delivery attributable solely to the change;

(7) Other work attributable to the change;

(8) Supplementing the foregoing, a narrative statement of the direct "causal" relationship between any alleged Government act or omission and the claimed consequences therefor, cross-referenced to the detailed information provided as required above; and

(9) A statement setting forth a comparative enumeration of the amounts "budgeted" for the cost elements, including the material costs, labor hours and pertinent indirect costs, estimated by the Contractor in preparing its initial and ultimate proposal(s) for this contract, and the amounts claimed to have been incurred and/or projected to be incurred corresponding to each such "budgeted cost" elements.

(c) Each proposal in excess of $100,000 submitted in support of a claim for equitable adjustment under any requirement of this contract shall, in addition to the information required by paragraph (b) hereof, contain such information as the Contracting Officer may require with respect to each individual claim item.

(d) It is recognized that individual claims for equitable adjustment may not include all of the factors listed in paragraph

(b) above. Accordingly, the Contractor is required to set forth in its proposal information only with respect to those factors which are comprehended in the individual claim for equitable adjustment. In any event, the information furnished hereunder shall be in sufficient detail to permit the Contracting Officer to cross-reference the claimed increased costs, or delay in delivery, or both, as appropriate, submitted pursuant to paragraph (c) of this requirement, with the information submitted pursuant to paragraph (b) hereof.

C-242-H001 EXPEDITING CONTRACT CLOSEOUT (NAVSEA) (OCT 2018)

(a) As part of the negotiated fixed price or total estimated amount of this contract, both the Government and the Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $1,000 or less at the time of final contract closeout. The term "residual dollar amount" shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party may be considered to the extent permitted by law.

(b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered.

C-242-H002 POST AWARD MEETNG (NAVSEA) (OCT 2018)

(a) A post-award meeting with the successful offeror will be conducted within [ * ] days after award of the [contract / task order]. The meeting will be held at the address below:

Location/Address: [ * ]

(b) The contractor will be given [ * ] working days notice prior to the date of the meeting by the Contracting Officer.

(c) The requirement for a post-award meeting shall in no event constitute grounds for excusable delay by the contractor in performance of any provisions in the [contract / task order].

(d) The post-award meeting will include, but is not limited to, the establishment of work level points of contact, determining the administration strategy, roles and responsibilities, and ensure prompt payment and close out.

Specific topics shall be mutually agreed to prior to the meeting.

[ * ] To be specified at [contract / task order] award.

C-243-H003 CONFIGURATION MANAGEMENT (NAVSEA) (JAN 2019)

(a) Baseline Definition - All contractual documentation in effect at the time of contract award shall constitute the Contract Baseline, which shall be considered incorporated in the baseline documentation.

(b) General Requirement - (1) The Contractor shall maintain a Configuration Control Program to assure that all detail level work being performed under this contract is in compliance with appropriate baseline documentation.

The Contractor shall prepare a Configuration Management Plan in accordance with the requirements of the contract.

If required, the Contractor’s Configuration Management Plan shall be submitted through the appropriate Contract Data Requirements List (CDRL) for approval by the Government.

(2) Whenever a situation arises wherein the Contractor cannot comply with a baseline document, or whenever intent of such documentation is significantly changed by detail level documentation, the Contractor shall submit change documents to modify the baseline to resolve the conflict or to allow non-compliance. Whenever the cost of implementing a proposed change is less than the threshold requiring certified cost or pricing data, the Contractor shall provide such detail of related costs as to allow the Government to determine an equitable adjustment for the change document submission. Whenever the contract cost changes by an amount greater than the threshold requiring certified cost or pricing data, the Contractor shall complete such cost and pricing data as the Contracting Officer shall require detailing all related costs, and attach it to the change document. Requirements for cost and pricing data shall be determined by the gross amount of the change unless otherwise directed by the Contracting Officer. Change documentation shall be submitted to the Contracting Officer in accordance with the appropriate CDRL, and as described in paragraphs (c) through (f) below.

(c) Engineering Change Proposals (ECPs) - ECPs shall be prepared in accordance with the approved configuration management plan and the requirements of the contract. DI-SESS-80639D approved 7 April 2015, EIA-649-1 of Nov 2014 and MIL-HDBK-61A of 7 Feb 2001 apply. An ECP shall be submitted whenever the detail level physical configuration, material quality, operational or functional performance of equipment or installed systems will not be in compliance with baseline design-related documents (Specifications, Contract Drawings, etc.), and a change to the baseline document is considered an appropriate means of resolving a design-related issue. The contractor shall develop documentation in sufficient detail to enable Government review and evaluation of the merits of the proposed change, including cost and scheduling impact, ship class impact if applicable, and consequences if disapproved. List all existing drawings and technical manuals impacted by the change, including a brief narrative explanation of needed changes to incorporate the ECP if approved. Provide weight and moment data incidental to the change, if applicable. The Contractor shall also prepare applicable baseline document insert sheets, with specific word changes or proposed re-write, to facilitate baseline documentation changes.

(d) Non-Engineering Change Proposals (NECPs) – An NECP shall be submitted whenever necessary to document administrative, procedural, scheduling, or documentation changes that do not directly impact the physical configuration of the equipment. The NECP shall explain the nature of the problem, identify the applicable baseline document (i.e., Contract Data Requirement List (CDRL), Contract Clause, etc.) and provide a detailed explanation justifying the proposed course of action desired to resolve the problem. Insert sheets for applicable documents shall also be attached to facilitate change action in the event the NECP is approved.

(e) Deviations/Waivers - In the event that a baseline design-related document requirement cannot be met, and a change to the baseline document is considered inappropriate, the Contractor shall submit a Request for Variance.

The explanation of "Need for Deviation/Waiver" in the DD1694 shall provide detailed justification and consequences of approval, to include technical details explaining the degree of non-compliance and the effect on ship equipment or system operation.

(f) Equitable Adjustments for Change Documentation Preparations - For its effort expended in preparing ECPs, NECPs, and Deviations/Waivers, the Contractor shall receive equitable adjustment under the following circumstances:

(1) In the event the Contractor, on its own initiative, and without written request from the Contracting Officer, develops a change document that is later disapproved by the Government, the Contractor shall bear the cost of this effort.

(2) To avoid such loss, and at its option, the Contractor may submit a "preliminary" document that outlines intent, but without detailed supporting documentation and request the Contracting Officer's approval for expenditure of effort to complete the detailed supporting documentation. In the event the Contracting Officer denies this request, the Contractor will bear the cost of development of the "preliminary" document, and shall make no further effort to complete detailed supporting documentation.

(3) In the event the Contracting Officer approves the Contractor's request to develop supporting documentation, the Contractor shall be equitably compensated for its effort for both the "preliminary" and "final" documentation, regardless of whether or not the change document is later approved.

(4) In the event the Contracting Officer requests in writing that the Contractor develop change documentation, the effort expended by the Contractor in developing such documentation shall be subject to equitable adjustment, regardless of whether or not the change document is later approved.

(5) In the event the Contractor, on its own initiative, and without written request from the Government, develops a change document that is later approved by the Contracting Officer, the cost of developing such documentation shall be subject to equitable adjustment.

(6) Failure to agree to such equitable adjustment in contract price shall constitute a dispute, and shall be adjudicated in accordance with the requirements of the clause entitled "Disputes" (FAR 52.233-1).

(g) Any cost reduction proposal submitted pursuant to the clause entitled "Value Engineering" (FAR 52.248-1) shall be submitted as a Value Engineering Change Proposal (VECP). The Contractor shall follow the VECP preparation requirements of FAR 52.248-1(c) and any additional guidance provided by the Contracting Officer.

C-245-H005 INFORMATION AND DATA FURNISHED BY THE GOVERNMENT--ALTERNATE I

(NAVSEA) (MAY 2019)

(a) Contract Specifications, Drawings and Data. The Government will furnish, if not included as an attachment to the contract, any unique contract specifications or other design or alteration data cited or referenced in Section C.

(b) Government Furnished Information (GFI). GFI is defined as that information essential for the installation, test, operation, and interface support of all Government Furnished Material identified in an attachment in Section J. The Government shall furnish only the GFI identified in an attachment in Section J. The GFI furnished to the contractor need not be in any particular format. Further, the Government reserves the right to revise the listing of GFI as follows:

(1) The Contracting Officer may at any time by written order:

(i) delete, supersede, or revise, in whole or in part, data identified in an attachment in Section J; or

(ii) add items of data or information to the attachment identified in Section J; or

(iii) establish or revise due dates for items of data or information in the attachment identified in Section J.

(2) If any action taken by the Contracting Officer pursuant to subparagraph (1) immediately above causes an increase or decrease in the costs of, or the time required for, performance of any part of the work under this contract, the contractor may be entitled to an equitable adjustment in the contract amount and delivery schedule in accordance with the procedures provided for in the "CHANGES" clause of this contract.

(c) Except for the Government information and data specified by paragraphs (a) and (b) above, the Government will not be obligated to furnish the Contractor any specification, standard, drawing, technical documentation, or other publication, notwithstanding anything to the contrary in the contract specifications, the GFI identified in an attachment in Section J, the clause of this contract entitled "Government Property" (FAR 52.245-1) or "Government Property Installation Operation Services" (FAR 52.245-2), as applicable, or any other term or condition of this contract. Such referenced documentation may be obtained:

(1) From the ASSIST database via the internet at https://assist.dla.mil/online/start/; or

(2) By submitting a request to the

Department of Defense Single Stock Point (DoDSSP)

Building 4, Section D

700 Robbins Avenue Philadelphia, Pennsylvania 19111-5094 Telephone (215) 697-6396 Facsimile (215) 697-9398.

Commercial specifications and standards, which may be referenced in the contract specification or any sub-tier specification or standard, are not available from Government sources and should be obtained from the publishers.

C-246-H002 GOVERNMENT USE OF CONTRACTOR’S INSPECTION EQUIPMENT (NAVSEA) (OCT 2018)

The contractor's gages, measuring, and testing devices shall be made available to the Government when required to determine contractor conformance with contract requirements. If conditions warrant, the contractor’s personnel shall be made available for operation of such devices and for verification of their accuracy and condition.

C-247-H001 PERMITS AND RESPONSIBILITIES (NAVSEA) (DEC 2018)

The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits for complying with any applicable Federal, State, and Municipal laws, codes, and regulations for shipping and transportation including, but not limited to, any movement over public highways of overweight/over dimensional materials.

Section D - Packaging and Marking

D-211-H001 PACKAGING OF DATA (NAVSEA) (OCT 2018)

Data to be delivered by Integrated Digital Environment (IDE) or other electronic media shall be as specified in the contract.

All unclassified data to be shipped shall be prepared for shipment in accordance with best commercial practice.

Classified reports, data, and documentation shall be prepared for shipment in accordance with National Industrial Security Program Operating Manual (NISPOM), DOD 5220.22-M dated 28 February 2006 incorporating Change 2 dated 18 May 2016.

D-211-H002 MARKING OF REPORTS (NAVSEA) (OCT 2018)

All reports delivered by the Contractor to the Government under this contract shall prominently show on the cover of the report:

(1) name and business address of the Contractor

(2) contract number

(3) sponsor: TBD (Name of Individual Sponsor)

NUWC KEYPORT

(Name of Requiring Activity)

KEYPORT, WA

(City and State)

D-211-H005 IDENTIFICATION MARKING OF PARTS – ALTERNATE I (NAVSEA) (OCT 2018)

(a) For all parts not subject to the marking requirements in DFARS 252.211-7003 – Item Unique Identification and Valuation, marking shall be accomplished in accordance with the following:

(1) Parts not manufactured to Government specifications shall be marked in accordance with generally accepted commercial practice.

(2) Parts manufactured to Government specifications shall be marked as follows:

(i) Electrical Parts - that is, all parts in electrical equipment and electrical parts when used in equipment which are not electrical in nature (e.g., electric controls and motors in a hydraulic system) - shall be identified and marked in accordance with MIL-STD-1285D(2) dated 22 June 2018, or, where MIL-STD-1285D(2) does not cover such a part, in accordance with MIL-STD-130N(1) dated 16 November 2012. Requirements of MIL-STD-1686C dated 25 October 1995 for Electrostatic Discharge Control shall be addressed.

(ii) Electronic Parts - that is, all parts in electronic equipment and electronic parts when used in equipment which are not electronic in nature (e.g., electronic fuel controls in some engines) - shall be identified and marked in accordance with Requirement 67 of MIL-HDBK-454B dated 15 April 2007 with Notice 1 dated 12 December 2012. Requirements of MIL-STD-1686C for Electrostatic Discharge Control shall be addressed.

(iii) Parts other than electrical or electronic parts (as described above) shall be identified and marked in accordance with MIL-STD-130N(1).

(b) In cases where parts are so small as not to permit identification marking as provided above, such parts shall be appropriately coded so as to permit ready identification.

D-247-H001 ADDITIONAL MARKING REQUIREMENTS FOR FMS ITEMS (NAVSEA) (OCT 2018)

(a) The following identifying marks shall appear on the outside of each box, parcel and/or crate and all shipping papers included in each shipment:

NAVY

FMS CASE ________TBD at Award_________________________________________________ REQUISITION NO. _TBD at Award__________________________________________________ ITEM DESCRIPTION _TBD at Award____________________________________________

If a consolidated shipment of several items in one container is forwarded, add to the above information

"CONSOLIDATED SHIPMENT, CONTAINS ____ ITEMS".

(b) The inscription "UNITED STATES OF AMERICA" shall be affixed in a suitable size indelible stencil, label or printed form on all external shipping containers or the exterior surface of uncrated items.

(c) All invoices, correspondence, reports and other documents shall be identified with the appropriate FMS case designator, requisition number(s), and item description(s).

D-247-H005 MARKING AND PACKING LIST(S) – ALTERNATE I (NAVSEA) (OCT 2018)

(a) Marking. Shipments, shipping containers and palletized unit loads shall be marked in accordance with MIL- STD-129R with Change 1 dated 24 May 2018.

(b) Packing List(s). A packing list (DD Form 250 Material Inspection and Receiving Report may be used) identifying the contents of each shipment, shipping container or palletized unit load shall be provided by the Contractor with each shipment in accordance with the above cited MIL-STD. When a contract line item identified under a single stock number includes an assortment of related items such as kit or set components, detached parts or accessories, installation hardware or material, the packing list(s) shall identify the assorted items.

Where DD Form 1348-1 or DD Form 1348-1A is applicable and an assortment of related items is included in the shipping container, a packing list identifying the contents shall be furnished.

(c) Master Packing List. In addition to the requirements in paragraph (b) above, a master packing list shall be prepared where more than one shipment, shipping container or palletized unit load comprise the contract line item being shipped. The master packing list shall be attached to the number one container and so identified.

(d) Part Identification. All items within the kit, set, installation hardware or material shall be suitably segregated and identified within the unit pack(s) or shipping container by part number and/or national stock number. Refer to the above cited MIL-STD for marking of assorted (related-unrelated) items.

D-247-W001 PROHIBITED PACKING MATERIALS (NAVSEA) (OCT 2018)

The use of asbestos, excelsior, newspaper or shredded paper (all types including waxed paper, computer paper and similar hygroscopic or non-neutral material) is prohibited.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .