Statement_of_Work.docx
DOCX document 12 KB Posted
- Attached to
- Wire Coil Cover Assembly
- Solicitation number
- N0025319R0007
About this file
This sources sought notice requests capability information for the manufacture of wire coil assemblies. The Naval Undersea Warfare Center Division Keyport is conducting market research to identify suppliers capable of manufacturing wire coil cover assemblies in accordance with the attached statement of work. The statement of work outlines requirements for the production of wire coil cover assemblies under National Item Identification Number items 0001 and 0002, including quantities of 232 and 172 assemblies respectively over five years. Suppliers must be able to deliver first article samples within 280 days of contract award and production quantities within 280 days of first article acceptance, with 90 days allowed for inspection and acceptance. The applicable NAICS code is 332993 and size standard is 1,500 employees. Responses to this sources sought notice are due by the date and time specified and shall not include any classified or export-controlled information.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sources_Sought_Questionnaire-_N0025319R0007.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
MK48 HWT Torpedo Cover Assembly, Wire Coil
Item 0001
Cover Assembly, Wire Coil Manufacture in accordance with (IAW)Drawing 5893815 REV K Less coil support 5893868
Quantity:
First Article Testing (FAT) = 2 each Production = 48 each 4 Option Years = 10 each per option year
Delivery:
FAT = 280 days after contract award Production = 280 days after FAT acceptance Option Years = 280 days after option exercise
Inspection/acceptance = 90 days
Item 0002
Cover Assembly, Wire Coil Manufacture IAW Drawing 8635276 REV-, and NOR 45/NUE18050-001
Quantity:
FAT = 2 each Production = 172 each 4 Option Years = 58 each per option year
Delivery:
FAT = 280 days after contract award Production = 280 days after FAT acceptance Option Years = 280 days after option exercise
Inspection/acceptance = 90 days
File details come from the government source that posted it. Updated .