This document provides details for a federal contract opportunity to manufacture MK48 Wire Coil Cover Assemblies. The Naval Undersea Warfare Center Division Keyport intends to issue a full and open competitive solicitation numbered N0025319R0007 for a total of 224 base units and 272 optional units. The base quantities include 4 first article units and the 8 options consist of 4 options of 10 units each and 4 options of 58 units each. The supplies will be acquired on a firm-fixed-price basis. Delivery locations and dates are specified. The solicitation is anticipated to be posted on or around January 15, 2019 with a closing date approximately 30 days later unless otherwise stated. Drawings and technical data are restricted and only available through the Defense Logistics Information Services Joint Certification Program. Questions regarding the solicitation must be submitted by a specified date prior to closing.

View the file

Other files

File Type Posted
N0025319R00070006.pdf PDF
N0025319R00070005.pdf PDF
N0025319R00070004.pdf PDF
N0025319R00070003.pdf PDF
N0025319R00070002.pdf PDF
N0025319R00070001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 02:00 PM local time 09 May 2019

X

A X B X C X D

EX

X

G F 53 - 77

78 - 90 X H 91 - 95 winston.dimagiba@navy.mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

DO-A5 1 95

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

N00253 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and

See adddress in Block 7 conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

WINSTON DIMAGIBA 360-315-8559

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 8

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

9 - 14

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

16 - 19 20 - 23

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 24 - 29 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 30 - 32 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

33 - 51

PART II - CONTRACT CLAUSES

NAVAL UNDERSEA WARFARE CENTER

ATTN : WINSTON DIMAGIBA

WINSTON.DIMAGIBA@NAVY.MIL

610 DOWELL ST, C181

KEYPORT WA 98325

360-315-8559

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

08 Apr 2019

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

N0025319R0007

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 2 Each

FIRST ARTICLE - WIRE COIL COVER ASSEMBLY

FFP

First Article - Wire Coil Cover Assembly (Warshot) Less Coil Support 5893868

Manufacture in accordance with the Statement of Work.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FOB: Destination

PSC CD: 1355

NET AMT

0002 48 Each

PRODUCTION - WIRE COIL COVER ASSEMBLY

FFP

Production - Wire Coil Cover Assembly (Warshot) Less Coil Support 5893868

Manufacture in accordance with the Statement of Work.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

0003 2 Each

FIRST ARTICLE - WIRE COIL COVER ASSEMBLY

FFP

First Article - Wire Coil Cover Assembly (Exercise)

Manufacture in accordance with the Statement of Work.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

0004 172 Each

PRODUCTION - WIRE COIL COVER ASSEMBLY

FFP

Production - Wire Coil Cover Assembly (Exercise)

Manufacture in accordance with the Statement of Work.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

0005 1 Lot

CONTRACT DATA REQUIREMENTS (CDRL)

FFP

In accordance with the DD1423 Contract Data Requirments List, Exhibit A.

Data items are not separately priced.

2000 10 Each

OPTION OPTION 1-WIRE COIL COVER ASSY (WARSHOT)

FFP

Production - Wire Coil Cover Assembly (Warshot) Less Coil Support 5893868

Manufacture in accordance with the Statement of Work.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

2001 10 Each

OPTION OPTION 2- WIRE COIL COVER ASSY (WARSHOT)

FFP

Production - Wire Coil Cover Assembly (Warshot) Less Coil Support 5893868

Manufacture in accordance with the Statement of Work.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

2002 10 Each

OPTION OPTION 3- WIRE COIL COVER ASSY (WARSHOT)

FFP

Production - Wire Coil Cover Assembly (Warshot) Less Coil Support 5893868

Manufacture in accordance with the Statement of Work.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

2003 10 Each

OPTION OPTION 4-WIRE COIL COVER ASSY (WARSHOT)

FFP

Production - Wire Coil Cover Assembly (Warshot) Less Coil Support 5893868

Manufacture in accordance with the Statement of Work.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

4000 58 Each

OPTION OPTION 5-WIRE COIL COVER ASSY (EXERCISE)

FFP

Production - Wire Coil Cover Assembly (Exercise)

Manufacture in accordance with the Statement of Work.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

4001 58 Each

OPTION OPTION 6-WIRE COIL COVER ASSY (EXERCISE)

FFP

Production - Wire Coil Cover Assembly (Exercise)

Manufacture in accordance with the Statement of Work.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

4002 58 Each

OPTION OPTION 7-WIRE COIL COVER ASSY (EXERCISE)

FFP

Production - Wire Coil Cover Assembly (Exercise)

Manufacture in accordance with the Statement of Work.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

4003 58 Each

OPTION OPTION 8-WIRE COIL COVER ASSY (EXERCISE)

FFP

Production - Wire Coil Cover Assembly (Exercise)

Manufacture in accordance with the Statement of Work.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

CLAUSES INCORPORATED BY FULL TEXT

HQ B-2-0004 EXPEDITING CONTRACT CLOSEOUT (NAVSEA) (DEC 1995)

(a) As part of the negotiated fixed price or total estimated amount of this contract, both the Government and the Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $500 or less at the time of final contract closeout. The term "residual dollar amount" shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party may be considered to the extent permitted by law.

(b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered.

(End of Text)

Section C - Descriptions and Specifications

STATEMENT OF WORK

Statement of Work

MK48 HWT Torpedo Cover Assembly, Wire Coil

A. Wire Coil Cover Assembly (Warshot) Less Coil Support 5893868

Items 0001, 0002, 2000, 2001, 2002, 2003

Manufacture in accordance with NAVSEA drawing 5893815, Rev K and the following associated drawings:

PL5893815 Rev K 5893828 Rev AB WS22351 Rev G WS26947 Rev - 6146923-4 Rev J 6813116 Rev A 6146924 Rev B 6657378 Rev A 5759545 Rev J (Not provided see note in additional clarifications below)

The following additional clarifications pertain:

WS22351 Para 3.3.7 touch-up repair and Para 3.3.7.2 material use drawing 6146924 as required in lieu of 5759545.

WS22351 Para 4.1.2 states painting facility must be certified by NUWC Division Newport, current qualified sources are listed in Table XII of WS22351.

While manufacturing IAW Drawing 5893815, Rev K, exclude notes 3 - 8 and disregard the following associated drawings: 5893868 Rev E, 5205453 Rev L, 8166334 Rev A, and 8166082 Rev C.

Partial and/or early deliveries are acceptable and encouraged.

No substitution of material allowed without prior consent of HWT ISE NUWC Division, Newport.

Mark label with manufacturer, nomenclature, part number, serial number, and cage code.

The following specs and standards in referenced drawings have been superseded by a newer spec or standard:

FED-STD-595 by SAE AMS-STD-595 TT-P-143 by PPP-P-1892 and canceled without replacement MIL-A-8625C by MIL-A-8625F QQ-A-250 by SAE AMS-QQ-A-250 MIL-STD-105 by MIL-STD_1916 MIL-STD-810C by MIL-STD_810G MIL-STD-709C by MIL-STD-709D ASTM G-23 by ASTM G-153 ASTM D-1400 by ASTM D-7091 MIL-D-16781 is incorrect and should be MIL-D-16791

B. Wire Coil Cover Assembly (Exercise)

Items 0003, 0004, 4000, 4001, 4002, 4003

Manufacture in accordance with NAVSEA drawing 8635276 Rev - and NOR 48/NUE18050-001 and the following associated drawings:

6146923-4 Rev J WS22351 Rev G WS26947 Rev - 6146924 Rev B 6813116 Rev A 6657378 Rev A 5759545 Rev J (Not provided, see note in additional clarifications) 6813121 Rev A

The following additional clarifications pertain:

WS22351 Para 3.3.7.2 Material - use Drawing 6146924 as required in lieu of 5759545.

WS22351 Para 4.1.2 states painting facility must be certified by NUWC Division, Newport; current qualified sources are listed in table XII of WS22351.

Partial and/or early deliveries are acceptable and encouraged.

No substitution of material allowed without prior consent of HWT ISE NUWC Division, Newport.

Mark label with manufacturer, nomenclature, part number, serial number, and cage code.

The following specs and standards in referenced drawings have been superseded by a newer spec or standard:

FED-STD-595 by SAE AMS-STD-595 TT-P-143 by PPP-P-1892 and canceled without replacement MIL-A-8625C by MIL-A-8625F QQ-A-250 by SAE AMS-QQ-A-250 MIL-STD-105 by MIL-STD_1916 MIL-STD-810C by MIL-STD_810G MIL-STD-709C by MIL-STD-709D ASTM G-23 by ASTM G-153 ASTM D-1400 by ASTM D-7091 MIL-D-16781 is incorrect and should be MIL-D-16791

HQ C-1-0001 ITEM(S) 0005 - DATA REQUIREMENTS (NAVSEA) (SEP 1992)

The data to be furnished hereunder shall be prepared in accordance with the Contract Data Requirements List, DD Form 1423, Exhibit(s) A001, A002, attached hereto.

HQ C-2-0008 ASSIGNMENT AND USE OF NATIONAL STOCK NUMBERS (NAVSEA) (MAY 1993)

To the extent that National Stock Numbers (NSNs) or preliminary NSNs are assigned by the Government for the identification of parts, pieces, items, subassemblies or assemblies to be furnished under this contract, the Contractor shall use such NSNs or preliminary NSNs in the preparation of provisioning lists, package labels, packing lists, shipping containers and shipping documents as required by applicable specifications, standards or Data item Descriptions of the contract or as required by orders for spare and repair parts. The cognizant Government Contract Administration Office shall be responsible for providing the Contractor such NSNs or preliminary NSNs which may be assigned and which are not already in possession of the Contractor.

HQ C-2-0012 CONFIGURATION MANAGEMENT (NAVSEA) (APR 2015)

(a) Baseline Definition - For configuration control purposes, all contractual documentation in effect at the time of contract award shall constitute the Contract Baseline which shall be considered incorporated in the baseline documentation.

(b) General Requirement - (1) The Contractor shall maintain a Configuration Control Program to assure that all detail level work being performed under this contract is in compliance with appropriate baseline documentation.

The Contractor shall prepare a Configuration Management Plan in accordance with the requirements of the contract for approval by the Government.

(2) Whenever a situation arises wherein the Contractor cannot comply with a baseline document, or whenever intent of such documentation is significantly changed by detail level documentation, the Contractor shall submit change documents to modify baseline documents to resolve the conflict or to allow non-compliance.

Whenever the cost of implementing a proposed change is less than the threshold requiring certified cost or pricing data, the Contractor shall provide documentation explaining the nature of related costs as shown on the change document. Whenever the contract cost changes by an amount greater than the threshold requiring certified cost or pricing data, the Contractor shall complete such cost and pricing data as the Contracting Officer shall require detailing all related costs, and attach it to the change document. Requirements for cost and pricing data shall be determined by the gross amount of the change unless otherwise directed by the contracting officer. Change documentation shall be submitted to the Contracting Officer in accordance with the Contract Data Requirements List (CDRL), and as described in paragraphs (c) through (f) below.

(c) Engineering Change Proposals (ECPs) - ECPs shall be prepared in accordance with the approved configuration management plan and the requirements of the contract. DI-SESS-80639D approved 7 April 2015 and MIL-HDBK- 61A of 7 Feb 2001 apply. An ECP should be submitted whenever the detail level physical configuration, material quality, operational or functional performance of equipment or installed systems will not be in compliance with baseline design-related documents (Specifications, Contract Drawings, etc.), and a change to the baseline document is considered an appropriate means of resolving a design-related issue. Documentation shall be developed in sufficient detail to enable Government review and evaluation of the merits of the proposed change, including cost and scheduling impact, ship class impact, and consequences if disapproved. All existing drawings and technical manuals impacted by the change shall be listed along with a brief narrative explanation of needed changes to incorporate the ECP if approved. Weight and moment data incidental to the change shall be provided. The Contractor shall also prepare applicable baseline document insert sheets, with specific word changes or proposed re-write, to facilitate baseline documentation changes.

(d) Non-Engineering Change Proposals (NECPs) – An NECP should be submitted whenever necessary to document administrative, procedural, scheduling, or documentation changes that do not directly impact the physical configuration of the equipment. The NECP shall explain the nature of the problem, identify the applicable baseline document (i.e., Contract Data Requirement List (CDRL), Contract Clause, etc.) and provide a detailed explanation justifying the proposed course of action desired to resolve the problem. Insert sheets for applicable documents shall also be attached to facilitate change action in the event the NECP is approved.

(e) Deviations and Waivers - In the event that a baseline design-related document requirement cannot be met, and a change to the baseline document is considered inappropriate, the Contractor shall submit a Request for Variance.

DI-SESS-80640D approved 7 April 2015 and MIL-HDBK-61A of 7 Feb 2001 apply. The explanation of "need for deviation" should provide detailed justification and consequences of approval, to include technical details explaining the degree of non-compliance or effect on ship equipment or system operation constraints. In a similar manner, a waiver shall document an "as built" configuration that departs from baseline documentation and should include any proposed corrections or modifications to better meet the intent of the baseline document.

(f) Equitable Adjustments for Change Documentation Preparations - For its effort expended in preparing ECPs, NECPs, Deviations and Waivers, the Contractor shall receive equitable adjustment under the following circumstances:

(1) In the event the Contractor, on its own initiative, and without written request from the Contracting Officer, develops a change document that is later disapproved by the Government, the Contractor shall bear the cost of this effort.

(2) To avoid such loss, and at its option, the Contractor may submit a "preliminary" document that outlines intent, but without detailed supporting documentation and request the Contracting Officer's approval for expenditure of effort to complete the detailed supporting documentation. In the event the Contracting Officer denies this request, the Contractor will bear the cost of development of the "preliminary" document, and shall make no further effort to complete detailed supporting documentation.

(3) In the event the Contracting Officer approves the Contractor's request to develop supporting documentation, the Contractor shall be equitably compensated for its effort for both the "preliminary" and "final" documentation, regardless of whether or not the change document is later approved.

(4) In the event the Contracting Officer requests in writing that the Contractor develop change documentation, the effort expended by the Contractor in developing such documentation shall be subject to equitable adjustment, regardless of whether or not the change document is later approved.

(5) In the event the Contractor, on its own initiative, and without written request from the Government, develops a change document that is later approved by the Contracting Officer, the cost of developing such documentation shall be incorporated in the contract modification that implements the change.

(6) Failure to agree to such equitable adjustment in contract price shall constitute a dispute, and shall be adjudicated in accordance with the requirements of the clause entitled "DISPUTES" (FAR 52.233-1).

(g) Any cost reduction proposal submitted pursuant to the clause entitled "VALUE ENGINEERING" (FAR 52.248-1) shall be submitted as a Code V Engineering Change Proposal (VECP). DI-SESS-80639D approved 7 April 2015 and MIL-HDBK-61A of 7 Feb 2001 apply. Information required by the "VALUE ENGINEERING" clause shall also be submitted as part of the change request.

HQ C-2-0024 EXTENSION OF COMMERCIAL WARRANTY (NAVSEA) (NOV 1996)

The Contractor shall extend to the Government the full coverage of any standard commercial warranty normally offered in a similar commercial sale, provided that such warranty is available at no additional cost to the Government. The Contractor shall provide a copy of the standard commercial warranty with the item. The standard commercial warranty period shall begin upon the final acceptance of the applicable material or software. Acceptance of the standard commercial warranty does not waive the Government's rights under the "Inspection" clause, nor does it limit the Government's rights with regard to other terms and conditions of the contract. In the event of a conflict, the terms and conditions of the contract shall take precedence over the standard commercial warranty.

HQ C-2-0027 FIRST ARTICLE (GOVERNMENT TESTING) (NAVSEA) (SEP 1990)

(a) For the purpose of this contract, the "First Article" is synonymous with the terms "preproduction model(s)" and "preproduction equipment".

(b) The production equipment shall be manufactured with tools, materials and methods which are the same as, or representative of the tools, material and methods which were used to manufacture the First Article. The First Article shall not be delivered for first article approval tests as provided for in the clause of this contract entitled "FIRST ARTICLE APPROVAL--GOVERNMENT TESTING" (FAR 52.209-4) until after the Contractor has fully tested it, at its expense, to determine compliance with said requirements and it has been preliminarily accepted by the Contract Administration Office. The Contractor shall make a record of all data obtained during such tests in such form as is consonant with good engineering practice and furnish five (5) copies thereof. The cover sheet of each copy of this record shall be marked with this contract number and the item identification. One (1) copy shall be furnished to the Contract Administration Office at the time of inspection for preliminary acceptance, one (1) copy shall accompany the First Article on delivery thereof.

(c) Pursuant to paragraph (e) of the clause entitled "FIRST ARTICLE APPROVAL--GOVERNMENT TESTING", the First Article shall not be delivered as part of the production quantity.

HQ C-2-0059 UPDATING SPECIFICATIONS AND STANDARDS (NAVSEA) (AUG 1994)

If, during the performance of this or any other contract, the contractor believes that any contract contains outdated or different versions of any specifications or standards, the contractor may request that all of its contracts be updated to include the current version of the applicable specification or standard. Updating shall not affect the form, fit or function of any deliverable item or increase the cost/price of the item to the Government. The contractor should submit update requests to the Procuring Contracting Officer with copies to the Administrative Contracting Officer and cognizant program office representative for approval. The contractor shall perform the contract in accordance with the existing specifications and standards until notified of approval/disapproval by the Procuring Contracting Officer. Any approved alternate specifications or standards will be incorporated into the contract.

HQ C-2-0062 WAIVER OF FIRST ARTICLE REQUIREMENTS (NAVSEA) (SEP 1990)

If the First Article is waived by the Government, the Contractor shall deliver supplies that are identical or substantially identical to those previously accepted by the Government under the following contract(s):

(Offeror to fill in contract number(s), as applicable. See Section M)

Section D - Packaging and Marking

HQ D-1-0002 PACKAGING OF SUPPLIES

All supplies furnished hereunder shall be packaged in accordance with best commercial practice.

HQ D-2-0004 IDENTIFICATION MARKING OF PARTS (NAVSEA) (NOV 1996)

Identification marking of individual parts within the systems, equipments, assemblies, subassemblies, components, groups, sets or kits, and of spare and repair parts shall be done in accordance with applicable specifications and drawings.

To the extent identification marking of such parts is not specified in applicable specifications or drawings, such marking shall be accomplished in accordance with the following:

(1) Parts shall be marked in accordance with generally accepted commercial practice.

(2) In cases where parts are so small as not to permit identification marking as provided above, such parts shall be appropriately coded so as to permit ready identification.

Section E - Inspection and Acceptance

INSPECTION PLAN

Inpection Plan for Cover Assembly, Wire Coil (WARSHOT):

Dimensional and quality workmanship inspection IAW:

5893815 Rev K and the following associated drawings:

PL5893815 Rev K 5893828 Rev AB WS22351 Rev G 6146923-4 Rev J

Inspection Plan for Cover, Wire Coil (EXERCISE):

Dimensional and quality workmanship inspection IAW:

8635276 Rev – with NOR 48/NUE18050-001 and the following associated drawings:

WS22351 Rev G 6146923-4 Rev J

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 0005 Destination Government Destination Government 2000 Destination Government Destination Government 2001 Destination Government Destination Government 2002 Destination Government Destination Government 2003 Destination Government Destination Government 4000 Destination Government Destination Government 4001 Destination Government Destination Government 4002 Destination Government Destination Government 4003 Destination Government Destination Government

CLAUSES INCORPORATED BY REFERENCE

52.246-2 Inspection Of Supplies--Fixed Price AUG 1996 52.246-16 Responsibility For Supplies APR 1984

52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)

(a) The Contractor shall comply with the higher-level quality standard(s) listed below.

ISO 9001-2015 or equivalent

(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph

(a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in--

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require--

(i) Control of such things as design, work operations, in-process control, testing, and inspection; or

(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

(End of clause)

C.102 ACCEPTANCE INSPECTION

Acceptance inspection of lots or batches will be in accordance with American National Standard ANSI/ASQ Z1.4- 2003. Unless otherwise specified, attributes, which if defective would prohibit or reduce the usability of the product for its intended purpose, will be inspected at an acceptable quality level (AQL) of 1.0. Attributes which do not materially reduce the usability of the product will be inspected at an AQL of 2.5. Any attributes classified as critical on the technical documentation will be inspected on each unit of product submitted. The right is reserved to reject any unit of product found nonconforming during inspection whether that unit of product forms a part of a sample or not, and whether the lot or batch as a whole is accepted or rejected.

Constructive Acceptance Timeframe for this procurement is 90 days after receipt of material.

HQ E-1-0001 INSPECTION AND ACCEPTANCE OF DATA

Inspection and acceptance of all data shall be as specified on the attached Contract Data Requirements List(s), DD Form 1423.

HQ E-1-0003 INSPECTION AND ACCEPTANCE OF F.O.B. DESTINATION DELIVERIES

All Items - Inspection and acceptance shall be made at destination by a representative of the Government.

HQ E-2-0003 CALIBRATION SYSTEM REQUIREMENTS (NAVSEA) (APR 2015)

Calibration System Requirements. The calibration of measuring and testing equipment shall, as a minimum, adhere to the requirements of ANSI/NCSL Z540.3-2006.

HQ E-2-0004 COST OF QUALITY DATA (NAVSEA) (MAY 1995)

Cost of Quality Data: The contractor shall maintain and use quality cost data as a management element of the quality program. The specific quality cost data to be maintained and used will be determined by the contractor.

These data shall, on request, be identified and made available for "on site" review by the Government representative.

HQ E-2-0008 INSPECTION AND TEST RECORDS (NAVSEA) (MAY 1995)

Inspection and Test Records: Inspection and test records shall, as a minimum, indicate the nature of the observations, number of observations made, and the number and type of deficiencies found. Data included in inspection and test records shall be complete and accurate, and shall be used for trend analysis and to assess corrective action and effectiveness.

HQ E-2-0015 QUALITY MANAGEMENT SYSTEM REQUIREMENTS (NAVSEA) (APR 2017)

Quality Management System Requirements. The Contractor shall provide and maintain a quality management system that, as a minimum, adheres to the requirements of ANSI/ISO/ASQ 9001-2015 Quality Management Systems and supplemental requirements imposed by this contract. The quality management system procedures, planning, and all other documentation and data that comprise the quality management system shall be made available to the Government for review. Existing quality documents that meet the requirements of this contract may continue to be used. The Government may perform any necessary inspections, verifications, and evaluations to ascertain conformance to requirements and the adequacy of the implementing procedures. The Contractor shall require of subcontractors a quality management system achieving control of the quality of the services and/or supplies provided. The Government reserves the right to disapprove the quality management system or portions thereof when it fails to meet the contractual requirements.

HQ E-2-0017 USE OF CONTRACTOR'S INSPECTION EQUIPMENT (NAVSEA) (MAY 1995)

Use of Contractor's Inspection Equipment: The contractor's gages, and measuring and testing devices shall be made available for use by the Government when required to determine conformance with contract requirements. If conditions warrant, the contractor's personnel shall be made available for operations of such devices and for verification of their accuracy and condition.

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 280 dys. ADC 2 NAVAL UNDERSEA WARFARE CENTER

RECEIVING OFFICER

ATTN: DIVISION KEYPORT SUPPLY

OFFICER

BLDG 893

610 DOWELL STREET

KEYPORT WA 98345-7610

360 396-2760

N00253

0002 280 dys. AFATA 48 (SAME AS PREVIOUS LOCATION)

0003 280 dys. ADC 2 (SAME AS PREVIOUS LOCATION)

0004 280 dys. AFATA 172 (SAME AS PREVIOUS LOCATION)

0005 280 dys. ADC 1 NAVAL UNDERSEA WARFARE CENTER

CONTRACTING OFFICER

SEE CONTRACT DATA REQUIREMENTS

LIST

VARIOUS WA 98345

360-315-2215

2000 280 dys. AOE 10 NAVAL UNDERSEA WARFARE CENTER

RECEIVING OFFICER

ATTN: DIVISION KEYPORT SUPPLY

OFFICER

BLDG 893

610 DOWELL STREET

KEYPORT WA 98345-7610

360 396-2760

2001 280 dys. AOE 10 (SAME AS PREVIOUS LOCATION)

2002 280 dys. AOE 10 (SAME AS PREVIOUS LOCATION)

2003 280 dys. AOE 10 (SAME AS PREVIOUS LOCATION)

4000 280 dys. AOE 58 (SAME AS PREVIOUS LOCATION)

4001 280 dys. AOE 58 (SAME AS PREVIOUS LOCATION)

4002 280 dys. AOE 58 (SAME AS PREVIOUS LOCATION)

4003 280 dys. AOE 58 (SAME AS PREVIOUS LOCATION)

52.242-15 Stop-Work Order AUG 1989 52.242-17 Government Delay Of Work APR 1984 52.247-34 F.O.B. Destination NOV 1991

52.211-8 TIME OF DELIVERY (JUN 1997)

(a) The Government requires delivery to be made according to the following schedule:

REQUIRED DELIVERY SCHEDULE

(Contracting Officer insert specific details)

Within Days

After Date

Item No. Quantity of Contract

The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.

OFFEROR'S PROPOSED DELIVERY SCHEDULE

Within Days

After Date

Item No. Quantity of Contract

(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the Contractor's date of receipt of the contract or notice of award by adding (1) five calendar days for delivery of the award through the ordinary mails, or (2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term "working day" excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.

HQ F-2-0004 F.O.B. DESTINATION (NAVSEA) (APR 2015)

All supplies hereunder shall be delivered with all transportation charges prepaid, in accordance with the clause hereof entitled "F.O.B. DESTINATION" (FAR 52.247-34) in accordance with the delivery instructions specified herein.

The Contractor shall not ship directly to a military air or water port terminal without authorization by the cognizant Contract Administration Office.

Except when the Material Inspection and Receiving Report (MIRR) (DD 250) is used as an invoice, the Contractor shall enter unit prices on all MIRR copies. Contract line items shall be priced using actual prices, or if not available, estimated prices. When the price is estimated, an "E" shall be entered after the price.

All data to be furnished under this contract shall be delivered prepaid to destination(s) at the time(s) specified on the Contract Data Requirements List(s), DD Form 1423.

Section G - Contract Administration Data

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)

(a) Definitions. As used in this clause--

Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.

Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.

(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall--

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:

(1) Document type. The Contractor shall use the following document type(s).

COMBO

(Contracting Officer: Insert applicable document type(s). Note: If a “Combo” document type is identified but not supportable by the Contractor's business systems, an “Invoice” (stand-alone) and “Receiving Report” (stand-alone) document type may be used instead.)

(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.

DESTINATION

(Contracting Officer: Insert inspection and acceptance locations or “Not applicable”.)

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table* Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC N62839 Issue By DoDAAC N00253 Admin DoDAAC N00253 Inspect By DoDAAC N00253 Ship To Code N00253 Ship From Code ____ Mark For Code ____ Service Approver (DoDAAC) ____ Service Acceptor (DoDAAC) ____ Accept at Other DoDAAC ____ LPO DoDAAC ____ DCAA Auditor DoDAAC ____ Other DoDAAC(s) ____

(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.

(5) WAWF email notifications. The Contractor shall enter the email address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.

receiptcontrol.nuwckpt.fct@navy.mil

(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

Keyport Vendor Pay Group at (360) 315-8500 or at vendorpay.nuwckpt.fct@navy.mil

(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.

G-232-H002 PAYMENT INSTRUCTIONS AND CONTRACT TYPE SUMMARY FOR PAYMENT

OFFICE (NAVSEA) (JUN 2018)

(a) The following table of payment office allocation methods applies to the extent indicated.

For Government Use Only

Contract/Order Payment Clause

Type of Payment Request

Su pp ly

Se rv ic e

C on st ru ct io n

Payment Office Allocation Method

52.212-4 (Alt I), Contract Terms and Conditions— Commercial Items 52.216-7, Allowable Cost and Payment 52.232-7, Payments under Time-and-Materials and Labor-Hour Contracts

Cost Voucher X X N/A Line item specific proration. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated in the same proportion as the amount of funding currently unliquidated for each ACRN on the deliverable line or deliverable subline item for which payment is requested.

52.232-1, Payments Navy Shipbuilding Invoice (Fixed Price)

X N/A N/A Line Item specific by fiscal year. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated using the oldest funds. In the event of a deliverable line or deliverable subline item with two ACRNs with the same fiscal year, those amounts will be prorated to the available unliquidated funds for that year.

52.232-1, Payments;

52.232-2, Payments under Fixed-Price Research and Development Contracts;

52.232-3, Payments under Personal Services Contracts;

52.232-4, Payments under Transportation Contracts and Transportation-Related Services Contracts; and 52.232-6, Payments under Communication Service Contracts with Common Carriers

Invoice X X N/A Line Item Specific proration. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated in the same proportion as the amount of funding currently unliquidated for each ACRN on the deliverable line or deliverable subline item for which payment is requested.

Contract/Order Payment Clause

Type of Payment Request

Su pp ly

Se rv ic e

C on st ru ct io n

Payment Office Allocation Method

52.232-5, Payments Under Fixed-Price Construction Contracts

Construction Payment Invoice

N/A N/A X Line Item specific by fiscal year. If there is more than one ACRN within a deliverable line or deliverable subline item, the funds will be allocated using the oldest funds. In the event of a deliverable line or deliverable subline item with two ACRNs with the same fiscal year, those amounts will be prorated to the available unliquidated funds for that year.

52.232-16, Progress Payments

Progress Payment*

X X N/A Contract-wide proration. Funds shall be allocated in the same proportion as the amount of funding currently unliquidated for each ACRN. Progress Payments are considered contract level financing, and the “contract price” shall reflect the fixed price portion of the contract per FAR 32.501-3.

52.232-29, Terms for Financing of Purchases of Commercial Items;

52.232-30, Installment Payments for Commercial Items

Commercial Item Financing*

X X N/A Specified in approved payment. The contracting officer shall specify the amount to be paid and the account(s) to be charged for each payment approval in accordance with FAR 32.207(b)(2) and 32.1007(b)(2).

52.232-32, Performance- Based Payments

Performance- Based Payments*

X X N/A Specified in approved payment. The contracting officer shall specify the amount to be paid and the account(s) to be charged for each payment approval in accordance with FAR 32.207(b)(2) and 32.1007(b)(2).

252.232-7002, Progress Payments for Foreign Military Sales Acquisitions

Progress Payment*

X X N/A Allocate costs among line items and countries in a manner acceptable to the Administrative Contracting Officer.

*Liquidation of Financing Payments. Liquidation will be applied by the payment office against those ACRNs which are identified by the payment instructions for the delivery payment and in keeping with the liquidation provision of the applicable contract financing clause (i.e., progress payment, performance-based payment, or commercial item financing).

(b) This procurement contains the following contract type(s):

Item Type* All Items FP

*CR – Cost-Reimbursement FP – Fixed Price

(End of text)

HQ G-2-0002 CONTRACT ADMINISTRATION DATA

Enter below the address (street and number, city, county, state and zip code) of the Contractor's facility which will administer the contract if such address is different from the address shown on the SF 26 or SF 33, as applicable.

SEE SF-33

HQ G-2-0004 PURCHASING OFFICE REPRESENTATIVE

PROCUREMENT CONTRACTING OFFICER

Monique A. Klose 610 Dowell Street, Bldg. 206A Keyport, WA 98345 Monique.klose@navy.mil

(360) 315-2215

CONTRACT SPECIALIST

Winston T. Dimagiba 610 Dowell Street, Bldg. 206A Keyport, WA 98345 Winston.dimagiba@navy.mil

(360) 315-8559

HQ G-2-0009 SUPPLEMENTAL INSTRUCTIONS REGARDING INVOICING (NAVSEA) (APR 2015)

(a) For other than firm fixed priced contract line item numbers (CLINs), the Contractor agrees to segregate costs incurred under this contract/task order (TO), as applicable, at the lowest level of performance, either at the technical instruction (TI), sub line item number (SLIN), or contract line item number (CLIN) level, rather than on a total contract/TO basis, and to submit invoices reflecting costs incurred at that level. Supporting documentation in Wide Area Workflow (WAWF) for invoices shall include summaries of work charged during the period covered as well as overall cumulative summaries by individual labor categories, rates, and hours (both straight time and overtime) invoiced; as well as, a cost breakdown of other direct costs (ODCs), materials, and travel, by TI, SLIN, or CLIN level. For other than firm fixed price subcontractors, subcontractors are also required to provide labor categories, rates, and hours (both straight time and overtime) invoiced; as well as, a cost breakdown of ODCs, materials, and travel invoiced. Supporting documentation may be encrypted before submission to the prime contractor for WAWF invoice submittal. Subcontractors may email encryption code information directly to the Contracting Officer (CO) and Contracting Officer Representative (COR). Should the subcontractor lack encryption capability, the subcontractor may also email detailed supporting cost information directly to the CO and COR; or other method as agreed to by the CO.

(b) Contractors submitting payment requests and receiving reports to WAWF using either Electronic Data Interchange (EDI) or Secure File Transfer Protocol (SFTP) shall separately send an email notification to the COR and CO on the same date they submit the invoice in WAWF. No payments shall be due if the contractor does not provide the COR and CO email notification as required herein.

Section H - Special Contract Requirements

5252.202-9101 ADDITIONAL DEFINITIONS (MAY 1993)

As used throughout this contract, the following terms shall have the meanings set forth below:

(a) DEPARTMENT - means the Department of the Navy.

(b) REFERENCES TO THE FEDERAL ACQUISITION REGULATION (FAR) - All references to the FAR in this contract shall be deemed to also reference the appropriate sections of the Defense FAR Supplement (DFARS), unless clearly indicated otherwise.

(c) REFERENCES TO ARMED SERVICES PROCUREMENT REGULATION OR DEFENSE ACQUISITION REGULATION - All references in this document to either the Armed Services Procurement Regulation (ASPR) or the Defense Acquisition Regulation (DAR) shall be deemed to be references to the appropriate sections of the

FAR/DFARS.

(d) NATIONAL STOCK NUMBERS - Whenever the term Federal Item Identification Number and its acronym FIIN or the term Federal Stock Number and its acronym FSN appear in the contract, order or their cited specifications and standards, the terms and acronyms shall be interpreted as National Item Identification Number (NIIN) and National Stock Number (NSN) respectively which shall be defined as follows:

(1) National Item Identification Number (NIIN). The number assigned to each approved Item Identification under the Federal Cataloging Program. It consists of nine numeric characters, the first two of which are the National Codification Bureau (NCB) Code. The remaining positions consist of a seven digit non-significant number.

(2) National Stock Number (NSN). The National Stock Number (NSN) for an item of supply consists of the applicable four position Federal Supply Class (FSC) plus the applicable nine position NIIN assigned to the item of supply.

5252.227-9113 GOVERNMENT-INDUSTRY DATA EXCHANGE PROGRAM (APR 2015)

(a) The Contractor shall participate in the appropriate interchange of the Government-Industry Data Exchange Program (GIDEP) in accordance with GIDEP PUBLICATION 1 dated April 2008. Data entered is retained by the program and provided to qualified participants. Compliance with this requirement shall not relieve the Contractor from complying with any other requirement of the contract.

(b) The Contractor agrees to insert paragraph (a) of this requirement in any subcontract hereunder exceeding $500,000.00. When so inserted, the word "Contractor" shall be changed to "Subcontractor".

(c) GIDEP materials, software and information are available without charge from:

GIDEP Operations Center

P.O. Box 8000 Corona, CA 92878-8000

Phone: (951) 898-3207

FAX: (951) 898-3250

Internet: http://www.gidep.org

C.106 QUALIFIED U.S. CONTRACTORS FOR EXPORT-CONTROLLED TECHNICAL DATA

(a) By Department of Defense (DOD) Directive 5230.25 (hereinafter referred to as “the Directive”), a program was established to allow Qualified U.S. Contractors to obtain export-controlled technical data under certain conditions. A "Qualified U.S. Contractor" is a private individual or enterprise (hereinafter described as a "U.S.

Contractor") that, in accordance with procedures established by the Under Secretary of Defense for Research and Engineering, certifies, as a condition of obtaining export-controlled technical data subject to the Directive from the Department of Defense, that:

(1) The individual who will act as recipient of the export-controlled technical data on behalf of the U.S.

Contractor is a U.S. citizen or a person admitted lawfully into the United States for permanent residence and is located in the United States;

(2) Such data are needed to bid or perform on a contract with the Department of Defense, or other U.S.

Government agency, or for other legitimate business purposes in which the U.S. Contractor is engaged, or plans to engage. The purpose for which the data are needed shall be described sufficiently in such certification to permit an evaluation of whether subsequent requests for data are related properly to such…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .