N00253-16-R-0020.pdf
PDF 365 KB Posted
- Attached to
- N00253-16-R-0020 Magnetic Ring Refurbishment
- Solicitation number
- N00253-16-R-0020
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N00253-16-R-0020-0004.pdf | ||
| N00253-16-R-0020-0003.pdf | ||
| N00253-16-R-0020-0002.pdf | ||
| N00253-16-R-0020-0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 10:00 AM local time 20 Oct 2016
X
A X B X C X D
EX
X
G F 54 - 79
80 - 85 X H 86 - 91
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
1 91
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N00253 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and see section L conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 15
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
16 - 18
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
20 - 25 26 - 28
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 29 - 32 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 33 - 40 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
41 - 49
PART II - CONTRACT CLAUSES
NAVAL UNDERSEA WARFARE CENTER
ATTN: KIRSTEN NEWHARD
KIRSTEN.NEWHARD@NAVY.MIL
610 DOWELL STREET, BLDG 206
KEYPORT WA 98345
360-396-1915
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
50 - 53
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
19 Sep 2016
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N00253-16-R-0020
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Each Elevation Ring - Plated Steel
FFP
First Article Elevation Ring, Sum and Difference De-populate and re-populate magnets on the Elevation Rings IAW NAVSEA Drawings 7447999-001 Rev I and 7448000 Rev F.
Delivery schedule is 40 days after receipt of GFE.
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0002 200 Each Elevation Ring - Plated Steel
FFP
Base Year Elevation Ring, Sum and Difference De-populate and re-populate magnets on the Elevation Rings IAW NAVSEA Drawings 7447999-001 Rev I and 7448000 Rev F.
MAX
0003 1 Each Elevation Ring - Stainless Steel
FFP
First Article Elevation Ring, Sum and Difference De-populate and re-populate magnets on the Elevation Rings IAW NAVSEA Drawings 7447999-002 Rev I and 7448000 Rev F.
UNIT UNIT PRICE MAX AMOUNT
0004 200 Each Elevation Ring - Stainless Steel
FFP
Base Year Elevation Ring, Sum and Difference De-populate and re-populate magnets on the Elevation Rings IAW NAVSEA Drawings 7447999-002 Rev I and 7448000 Rev F.
0005 1 Each Azimuth Ring - Plated Steel
FFP
First Article Azimuth Ring De-populate and re-populate magnets on the Azimuth Rings IAW NAVSEA Drawings 7447999-003 Rev I and 7448000 Rev F.
UNIT UNIT PRICE MAX AMOUNT
0006 200 Each Azimuth Ring - Plated Steel
FFP
Base Year Azimuth Ring De-populate and re-populate magnets on the Azimuth Rings IAW NAVSEA Drawings 7447999-003 Rev I and 7448000 Rev F.
0007 1 Each Azimuth Ring - Stainless Steel
FFP
First Article Azimuth Ring De-populate and re-populate magnets on the Azimuth Rings IAW NAVSEA Drawings 7447999-004 Rev I and 7448000 Rev F.
UNIT UNIT PRICE MAX AMOUNT
0008 200 Each Azimuth Ring - Stainless Steel
FFP
Base Year Azimuth Ring De-populate and re-populate magnets on the Azimuth Rings IAW NAVSEA Drawings 7447999-004 Rev I and 7448000 Rev F.
UNIT UNIT PRICE MAX AMOUNT
1001 200 Each OPTION Elevation Ring - Plated Steel
FFP
Option Year 1 Elevation Ring, Sum and Difference De-populate and re-populate magnets on the Elevation Rings IAW NAVSEA Drawings 7447999-001 Rev I and 7448000 Rev F.
UNIT UNIT PRICE MAX AMOUNT
1002 200 Each OPTION Elevation Ring - Stainless Steel
FFP
Option Year 1 Elevation Ring, Sum and Difference De-populate and re-populate magnets on the Elevation Rings IAW NAVSEA Drawings 7447999-002 Rev I and 7448000 Rev F.
UNIT UNIT PRICE MAX AMOUNT
1003 200 Each OPTION Azimuth Ring - Plated Steel
FFP
Option Year 1 Azimuth Ring De-populate and re-populate magnets on the Azimuth Rings IAW NAVSEA Drawings 7447999-003 Rev I and 7448000 Rev F.
UNIT UNIT PRICE MAX AMOUNT
1004 200 Each OPTION Azimuth Ring - Stainless Steel
FFP
Option Year 1 Azimuth Ring De-populate and re-populate magnets on the Azimuth Rings IAW NAVSEA Drawings 7447999-004 Rev I and 7448000 Rev F.
UNIT UNIT PRICE MAX AMOUNT
2001 200 Each OPTION Elevation Ring - Plated Steel
FFP
Option Year 2 Elevation Ring, Sum and Difference De-populate and re-populate magnets on the Elevation Rings IAW NAVSEA Drawings 7447999-001 Rev I and 7448000 Rev F.
UNIT UNIT PRICE MAX AMOUNT
2002 200 Each OPTION Elevation Ring - Stainless Steel
FFP
Option Year 2 Elevation Ring, Sum and Difference De-populate and re-populate magnets on the Elevation Rings IAW NAVSEA Drawings 7447999-002 Rev I and 7448000 Rev F.
UNIT UNIT PRICE MAX AMOUNT
2003 200 Each OPTION Azimuth Ring - Plated Steel
FFP
Option Year 2 Azimuth Ring De-populate and re-populate magnets on the Azimuth Rings IAW NAVSEA Drawings 7447999-003 Rev I and 7448000 Rev F.
UNIT UNIT PRICE MAX AMOUNT
2004 200 Each OPTION Azimuth Ring - Stainless Steel
FFP
Option Year 2 Azimuth Ring De-populate and re-populate magnets on the Azimuth Rings IAW NAVSEA Drawings 7447999-004 Rev I and 7448000 Rev F.
UNIT UNIT PRICE MAX AMOUNT
3001 200 Each OPTION Elevation Ring - Plated Steel
FFP
Option Year 3 Elevation Ring, Sum and Difference De-populate and re-populate magnets on the Elevation Rings IAW NAVSEA Drawings 7447999-001 Rev I and 7448000 Rev F.
UNIT UNIT PRICE MAX AMOUNT
3002 200 Each OPTION Elevation Ring - Stainless Steel
FFP
Option Year 3 Elevation Ring, Sum and Difference De-populate and re-populate magnets on the Elevation Rings IAW NAVSEA Drawings 7447999-002 Rev I and 7448000 Rev F.
UNIT UNIT PRICE MAX AMOUNT
3003 200 Each OPTION Azimuth Ring - Plated Steel
FFP
Option Year 3 Azimuth Ring De-populate and re-populate magnets on the Azimuth Rings IAW NAVSEA Drawings 7447999-003 Rev I and 7448000 Rev F.
UNIT UNIT PRICE MAX AMOUNT
3004 200 Each OPTION Azimuth Ring - Stainless Steel
FFP
Option Year 3 Azimuth Ring De-populate and re-populate magnets on the Azimuth Rings IAW NAVSEA Drawings 7447999-004 Rev I and 7448000 Rev F.
UNIT UNIT PRICE MAX AMOUNT
4001 200 Each OPTION Elevation Ring - Plated Steel
FFP
Option Year 4 Elevation Ring, Sum and Difference De-populate and re-populate magnets on the Elevation Rings IAW NAVSEA Drawings 7447999-001 Rev I and 7448000 Rev F.
UNIT UNIT PRICE MAX AMOUNT
4002 200 Each OPTION Elevation Ring - Stainless Steel
FFP
Option Year 4 Elevation Ring, Sum and Difference De-populate and re-populate magnets on the Elevation Rings IAW NAVSEA Drawings 7447999-002 Rev I and 7448000 Rev F.
UNIT UNIT PRICE MAX AMOUNT
4003 200 Each OPTION Azimuth Ring - Plated Steel
FFP
Option Year 4 Azimuth Ring De-populate and re-populate magnets on the Azimuth Rings IAW NAVSEA Drawings 7447999-003 Rev I and 7448000 Rev F.
UNIT UNIT PRICE MAX AMOUNT
4004 200 Each OPTION Azimuth Ring - Stainless Steel
FFP
Option Year 4 Azimuth Ring De-populate and re-populate magnets on the Azimuth Rings IAW NAVSEA Drawings 7447999-004 Rev I and 7448000 Rev F.
CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER
VALUE
The minimum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not exceed the maximum quantity and order value stated in the following table.
CLIN
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
0002 20.00
0004 20.00
0006 20.00
0008 20.00
1001 20.00
1002 20.00
1003 20.00
1004 20.00
2001 20.00
2002 20.00
2003 20.00
2004 20.00
3001 20.00
3002 20.00
3003 20.00
3004 20.00
4001 20.00
4002 20.00
4003 20.00
4004 20.00
CLAUSES INCORPORATED BY FULL TEXT
HQ B-2-0004 EXPEDITING CONTRACT CLOSEOUT (NAVSEA) (DEC 1995)
(a) As part of the negotiated fixed price or total estimated amount of this contract, both the Government and the Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $500 or less at the time of final contract closeout. The term "residual dollar amount" shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party may be considered to the extent permitted by law.
(b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered.
(End of Text)
HQ B-2-0022 CONTRACT SUMMARY FOR PAYMENT OFFICE (FIXED PRICE) (FEB 1997)
This entire contract is fixed price.
Section C - Descriptions and Specifications
STATEMENT OF WORK
Elevated Ring, Sum and Difference (Plated Steel) Part Number: 7447999-001 (CLINs 0001, 0002, 1001, 2001, 3001, 4001)
In accordance with drawings 7447999 Rev I and 7447800 Rev F.
Elevated Ring, Sum and Difference (Stainless Steel) Part Number: 7447999-002 (CLINs 0003, 0004, 1002, 2002, 3002, 4002)
In accordance with drawings 7447999 Rev I and 7447800 Rev F.
Azimuth Ring (Plated Steel) Part Number 7447999-003 (CLINs 0005, 0006, 1003, 2003, 3003, 4003)
In accordance with drawings 7447999 Rev I and 7447800 Rev F.
Azimuth Ring (Stainless Steel) Part Number 7447999-004 (CLINs 0007, 0008, 1004, 2004, 3004, 4004)
In accordance with drawings 7447999 Rev I and 7447800 Rev F.
Mark packages with the following additional information:
CLINs 0001, 0002, 1001, 2001, 3001, 4001:
Part Number: &447999-001
UMM: 000000001016295439
CLINs 0003, 0004, 1002, 2002, 3002, 4002:
Part Number: 7447999-002
UMM: 000000001016295441
CLINs 0005, 0006, 1003, 2003, 3003, 4004:
Part Number: 7447999-03
UMM: 000000001016295442
CLINs 0007, 0008, 1004, 2004, 3004, 4004 Part Number: 7447999-004
UMM: 000000001016295443
The Government reserves the right to perform a pre-award survey of propective contractors. For details see “FAR Part 9.106 – Preaward Survey” for details.
COMPLIANCE WITH SPECIFICATIONS
In order to ensure compliance with all the specification requirements, the contractor shall indicate in its offer, and notify the Government in a cover letter, what specifications, if any, the offeror does not intend to meet. The offeror shall explain in detail, how any proposed deviation/exception will nonetheless meet the Government’s functional requirements. Should descriptive literature be supplied by the offeror, it will be presumed that the offeror intends to meet all of the specifications, regardless of the descriptive literature, unless the offeror specifically notes its exceptions.
It shall be the obligation of the contractor to exercise due diligence to discover and to bring to the attention of the contracting office at the earliest possible time, in writing, any ambiguities, discrepancies, inconsistencies, or conflicts in or between the specifications and the applicable drawings or other documents incorporated by reference herein. Failure to comply with such obligation shall be deemed a waiver and release of any and all claims of extra costs or delays arising out of such ambiguities, discrepancies, inconsistencies and conflicts.
As referred to in paragraph (b) of the “Indefinite Quantity” clause of this contract, the contract minimum guarantee is one each, first article, if the first article is waived, then the minimum guarantee is ten percent (10%) of the value of the base ordering period of the contract. The maximum quantity is the total “not to exceed” quantity of each item as set forth in the schedule. The maximum quantity is not to be exceeded without prior approval of the Administrative Contracting Officer.
HQ C-2-0027 FIRST ARTICLE (GOVERNMENT TESTING) (NAVSEA) (SEP 1990)
(a) For the purpose of this contract, the "First Article" is synonymous with the terms "preproduction model(s)" and "preproduction equipment".
(b) The production equipment shall be manufactured with tools, materials and methods which are the same as, or representative of the tools, material and methods which were used to manufacture the First Article. The First Article shall not be delivered for first article approval tests as provided for in the clause of this contract entitled "FIRST ARTICLE APPROVAL--GOVERNMENT TESTING" (FAR 52.209-4) until after the Contractor has fully tested it, at its expense, to determine compliance with said requirements and it has been preliminarily accepted by the Contract Administration Office. The Contractor shall make a record of all data obtained during such tests in such form as is consonant with good engineering practice and furnish five (5) copies thereof. The cover sheet of each copy of this record shall be marked with this contract number and the item identification. One (1) copy shall be furnished to the Contract Administration Office at the time of inspection for preliminary acceptance, one (1) copy shall accompany the First Article on delivery thereof, and three (3) copies shall be furnished to the Naval Sea Systems Command at the time of First Article delivery.
(c) Pursuant to paragraph (e) of the clause entitled "FIRST ARTICLE APPROVAL--GOVERNMENT TESTING", the First Article shall not be delivered as part of the production quantity.
HQ C-2-0059 UPDATING SPECIFICATIONS AND STANDARDS (NAVSEA) (AUG 1994)
If, during the performance of this or any other contract, the contractor believes that any contract contains outdated or different versions of any specifications or standards, the contractor may request that all of its contracts be updated to include the current version of the applicable specification or standard. Updating shall not affect the form, fit or function of any deliverable item or increase the cost/price of the item to the Government. The contractor should submit update requests to the Procuring Contracting Officer with copies to the Administrative Contracting Officer and cognizant program office representative for approval. The contractor shall perform the contract in accordance with the existing specifications and standards until notified of approval/disapproval by the Procuring Contracting Officer. Any approved alternate specifications or standards will be incorporated into the contract.
HQ C-2-0062 WAIVER OF FIRST ARTICLE REQUIREMENTS (NAVSEA) (SEP 1990)
If the First Article is waived by the Government, the Contractor shall deliver supplies that are identical or substantially identical to those previously accepted by the Government under the following contract(s):
(Offeror to fill in contract number(s), as applicable. See Section M)
Section D - Packaging and Marking
HQ D-2-0004 IDENTIFICATION MARKING OF PARTS (NAVSEA) (NOV 1996)
Identification marking of individual parts within the systems, equipments, assemblies, subassemblies, components, groups, sets or kits, and of spare and repair parts shall be done in accordance with applicable specifications and drawings.
To the extent identification marking of such parts is not specified in applicable specifications or drawings, such marking shall be accomplished in accordance with the following:
(1) Parts shall be marked in accordance with generally accepted commercial practice.
(2) In cases where parts are so small as not to permit identification marking as provided above, such parts shall be appropriately coded so as to permit ready identification.
HQ D-2-0006 MARKING AND PACKING LIST(S) (NAVSEA) (NOV 1996)
(a) Marking. Shipments, shipping containers and palletized unit loads shall be marked in accordance with best commercial practice.
(b) Packing List(s). A packing list (DD Form 250 Material Inspection and Receiving Report may be used) identifying the contents of each shipment, shipping container or palletized unit load shall be provided by the Contractor with each shipment. When a contract line item identified under a single stock number includes an assortment of related items such as kit or set components, detached parts or accessories, installation hardware or material, the packing list(s) shall identify the assorted items.
Where assortment of related items is included in the shipping container, a packing list identifying the contents shall be furnished.
(c) Master Packing List. In addition to the requirements in paragraph (b) above, a master packing list shall be prepared where more than one shipment, shipping container or palletized unit load comprise the contract line item being shipped.
The master packing list shall be attached to the number one container and so identified.
(d) Part Identification. All items within the kit, set, installation hardware or material shall be suitably segregated and identified within the unit pack(s) or shipping container by part number and/or national stock number.
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 0005 Destination Government Destination Government 0006 Destination Government Destination Government 0007 Destination Government Destination Government 0008 Destination Government Destination Government 1001 Destination Government Destination Government 1002 Destination Government Destination Government 1003 Destination Government Destination Government 1004 Destination Government Destination Government 2001 Destination Government Destination Government 2002 Destination Government Destination Government 2003 Destination Government Destination Government 2004 Destination Government Destination Government 3001 Destination Government Destination Government 3002 Destination Government Destination Government 3003 Destination Government Destination Government 3004 Destination Government Destination Government 4001 Destination Government Destination Government 4002 Destination Government Destination Government 4003 Destination Government Destination Government 4004 Destination Government Destination Government
CLAUSES INCORPORATED BY REFERENCE
52.246-16 Responsibility For Supplies APR 1984
52.246-2 INSPECTION OF SUPPLIES--FIXED PRICE (AUG 1996)
(DEVIATION)
(a) Definition. "Supplies," as used in this clause, includes but is not limited to the vessel(s), raw materials, components, intermediate assemblies, end products, and lots of supplies.
(b) The Contractor shall provide and maintain, prior to and at all times during manufacture, an inspection system acceptable to the Government covering supplies under this contract and shall tender to the Government for acceptance only supplies that have been inspected in accordance with the inspection system and have been found by the Contractor to be in conformity with contract requirements. As part of the system, the Contractor shall prepare records evidencing all inspections made under the system and the outcome. These records shall be kept complete and made available to the Government during contract performance and for as long afterwards as the contract requires. The Government may perform reviews and evaluations as reasonably necessary to ascertain compliance with this paragraph. These reviews and evaluations shall be conducted in a manner that will not unduly delay the contract work. The right of review, whether exercised or not, does not relieve the Contractor of the obligations under the contract nor impose any liability on the Government therefor.
(c) The Government has the right to inspect and test all supplies called for by the contract, to the extent practicable, at all places and times, including the period of manufacture, and in any event before final acceptance. The Government shall perform inspections and tests in a manner that will not unduly delay the work. The Government assumes no contractual obligation to perform any inspection and test for the benefit of the Contractor unless specifically set forth elsewhere in this contract.
(d) If the Government performs inspection or test on the premises of the Contractor or a subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, without additional charge, all reasonable facilities and assistance for the safety and convenient performance of these duties. Except as otherwise provided in the contract, the Government shall bear the expense of Government inspections or tests made at other than the Contractor's or subcontractor's premises, provided, that in case of rejection, the Government shall not be liable for any reduction in the value of inspection or test samples.
(e)(1) When supplies are not ready at the time specified by the Contractor for inspection or test, the Contracting Officer may charge to the Contractor the additional cost of inspection or test.
(2) The Contracting Officer may also charge the Contractor for any additional cost of inspection or test when prior rejection makes reinspection or retest necessary.
(f) The Government has the right, in accordance with this clause and other clauses of this contract, including the clause entitled "DELIVERY OF COMPLETED VESSEL," either to reject or to require correction of nonconforming supplies.
Supplies are nonconforming when they are defective in material workmanship or are otherwise not in conformity with contract requirements. The Government may reject nonconforming supplies with or without disposition instructions.
Supplies rejected prior to preliminary acceptance as not conforming to this contract, and any Contractor responsible defects discovered during the guaranty period, in accordance with the clause entitled "GUARANTY PERIOD," shall, at the election of the Government be replaced or corrected either by the Government or by the Contractor. The Government will, whenever practicable, afford the Contractor an opportunity to examine the nonconforming or defective supplies before they are replaced or corrected. If the Government elects to effect replacement or correction by the Government, the Government shall equitably reduce the contract price.
(g) The Contractor shall remove supplies rejected or required to be corrected by the Contractor. However, the Contracting Officer may require or permit correction in place, promptly after notice, by and at the expense of the Contractor, subject to the provisions of paragraph (i) below. The Contractor shall not tender for acceptance corrected or rejected supplies without disclosing the former rejection or requirement for correction, and, when required, shall disclose the corrective action taken.
(h) If the Contractor fails to promptly remove, replace, or correct rejected supplies that are required to be removed or to be replaced or corrected, the Government may either (1) by contract or otherwise, remove, replace, or correct the supplies and charge the cost to the Contractor or (2) may terminate the contract for default. Unless the Contractor corrects or replaces the supplies within the delivery schedule, the Contracting Officer may require their delivery and make an equitable pride reduction. Failure to agree to a price reduction shall be a dispute.
(i) The cost of any removal, replacement or correction for which the Contractor is responsible shall be borne by the Contractor in accordance with paragraphs (g) and (h) above, except that the liability of the Contractor for the correction of defects discovered during the guaranty period (other than defects resulting from fraud or gross mistakes amounting to fraud) shall be limited as set forth in the clause entitled "LIMITATION OF CONTRACTOR'S LIABILITY FOR CORRECTION OF DEFECTS." An increase in the contract price on account of any replacement or correction for which the Contractor is not responsible shall be determined pursuant to the clause of this contract entitled "CHANGES."
(j)(1) If this contract provides for the performance of Government quality assurance at source, and if requested by the Government, the Contractor shall furnish advance notification of the time (i) when Contractor inspection or tests will be performed in accordance with the terms and conditions of the contract and (ii) when the supplies will be ready for Government inspection.
(2) The Government's request shall specify the period and method of the advance notification and the Government representative to whom it shall be furnished. Requests shall not require more than 2 workdays of advance notification if the Government representative is in residence in the Contractor's plant, nor more than 7 workdays in other instances.
(k) The Government shall accept or reject supplies as provided in the contract. Government failure to inspect and accept or reject the supplies shall not relieve the Contractor from responsibility, nor impose liability on the Government, for nonconforming supplies.
(l) Inspections and tests by the Government do not relieve the Contractor of responsibility for defects or other failures to meet contract requirements discovered before final acceptance. Final acceptance shall be conclusive, except for latent defects, fraud, gross mistakes amounting to fraud or as otherwise provided in the contract.
(m) If final acceptance is not conclusive for any of the reasons in paragraph (l) hereof, the Government, in addition to any other rights and remedies provided by law, or under other provisions of this contract, shall have the right to require the Contractor (1) at no increase in contract price, to correct or replace the defective or nonconforming supplies at the original point of delivery or at the Contractor's plant at the Contracting Officer's election, and in accordance with a reasonable delivery schedule as may be agreed upon between the Contractor and the Contracting Officer; provided, that the Contracting Officer may require a reduction in contract price if the Contractor fails to meet such delivery schedule, or
(2) within a reasonable time after receipt by the Contractor of notice of defects or nonconformance, to repay such portion of the contract as is equitable under the circumstances if the Contracting Officer elects not to require correction or replacement. When supplies are returned to the Contractor, the Contractor shall bear the transportation cost from the original point of delivery to the Contractor's plant and return to the original point when that point is not the Contractor's plant. If the Contractor fails to perform or act as required in (1) or (2) above and does not cure such failure within a period of 10 days (or such longer period as the Contracting Officer may authorize in writing) after receipt of notice from the Contracting Officer specifying such failure, the Government shall have the right by contract or otherwise to replace or correct such supplies and charge to the Contractor the cost occasioned the Government thereby.
(End of Clause)
52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)
(a) The Contractor shall comply with the higher-level quality standards listed below.
ISO 9001:2008
AMS-QQ-P-35 PASSIVATION
AMS-QQ-P-416 CADMIUM PLATING
(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph
(a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in--
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require--
(i) Control of such things as design, work operations, in-process control, testing, and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
C.102 ACCEPTANCE INSPECTION
Acceptance inspection of lots or batches will be in accordance with American National Standard ANSI/ASQ Z1.4- 2003. Unless otherwise specified, attributes, which if defective would prohibit or reduce the usability of the product for its intended purpose, will be inspected at an acceptable quality level (AQL) of 1.0. Attributes which do not materially reduce the usability of the product will be inspected at an AQL of 2.5. Any attributes classified as critical on the technical documentation will be inspected on each unit of product submitted. The right is reserved to reject any unit of product found nonconforming during inspection whether that unit of product forms a part of a sample or not, and whether the lot or batch as a whole is accepted or rejected.
Constructive Acceptance Timeframe for this procurement is 60 days after receipt of material.
HQ E-2-0003 CALIBRATION SYSTEM REQUIREMENTS (NAVSEA) (APR 2015)
Calibration System Requirements. The calibration of measuring and testing equipment shall, as a minimum, adhere to the requirements of ANSI/NCSL Z540.3-2006.
HQ E-2-0004 COST OF QUALITY DATA (NAVSEA) (MAY 1995)
Cost of Quality Data: The contractor shall maintain and use quality cost data as a management element of the quality program. The specific quality cost data to be maintained and used will be determined by the contractor.
These data shall, on request, be identified and made available for "on site" review by the Government representative.
HQ E-2-0008 INSPECTION AND TEST RECORDS (NAVSEA) (MAY 1995)
Inspection and Test Records: Inspection and test records shall, as a minimum, indicate the nature of the observations, number of observations made, and the number and type of deficiencies found. Data included in inspection and test records shall be complete and accurate, and shall be used for trend analysis and to assess corrective action and effectiveness.
HQ E-2-0014 QUALITY IN SOFTWARE DEVELOPMENT AND PRODUCTION (NAVSEA) (MAY
1995)
Quality in Software Development and Production: The contractor's software quality program shall be an integral part of the overall Quality Assurance Program. Software quality program controls shall be applicable to all project software that is developed, maintained, or modified within the following categories:
(a) All deliverable software
(b) All deliverable software that is included as part of deliverable hardware or firmware.
(c) Non deliverable software (commercially available or user-developed) used for development, fabrication, testing, or acceptance of deliverable software or hardware (includes automated fabrication, test, and inspection/acceptance equipment software and software design, test, and inspection tools).
(d) Commercially available, reusable, or Government software designated as part of a deliverable item.
HQ E-2-0015 QUALITY MANAGEMENT SYSTEM REQUIREMENTS (NAVSEA) (SEP 2009)
Quality Management System Requirements. The Contractor shall provide and maintain a quality management system that, as a minimum, adheres to the requirements of ANSI/ISO/ASQ 9001-2008 Quality Management Systems and supplemental requirements imposed by this contract. The quality management system procedures, planning, and all other documentation and data that comprise the quality management system shall be made available to the Government for review. Existing quality documents that meet the requirements of this contract may continue to be used. The Government may perform any necessary inspections, verifications, and evaluations to ascertain conformance to requirements and the adequacy of the implementing procedures. The Contractor shall require of subcontractors a quality management system achieving control of the quality of the services and/or supplies provided. The Government reserves the right to disapprove the quality management system or portions thereof when it fails to meet the contractual requirements.
HQ E-2-0017 USE OF CONTRACTOR’S INSPECTION EQUIPMENT (NAVSEA) (MAY 1995)
Use of Contractor’s Inspection Equipment: The contractor's gages, and measuring and testing devices shall be made available for use by the Government when required to determine conformance with contract requirements. If conditions warrant, the contractor’s personnel shall be made available for operations of such devices and for verification of their accuracy and condition.
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC
0001 POP 09-JAN-2017 TO
08-JAN-2018
N/A NAVAL UNDERSEA WARFARE CENTER
RECEIVING OFFICER
ATTN: DIVISION KEYPORT SUPPLY
OFFICER
BLDG 893
610 DOWELL STREET
KEYPORT WA 98345-7610
360 396-2760
N00253
0002 POP 09-JAN-2017 TO
08-JAN-2018
N/A (SAME AS PREVIOUS LOCATION)
0003 POP 09-JAN-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0004 POP 09-JAN-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0005 POP 09-JAN-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0006 POP 09-JAN-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0007 POP 09-JAN-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
0008 POP 09-JAN-2017 TO
N/A (SAME AS PREVIOUS LOCATION)
1001 N/A N/A N/A N/A
1002 N/A N/A N/A N/A
1003 N/A N/A N/A N/A
1004 N/A N/A N/A N/A
2001 N/A N/A N/A N/A
2002 N/A N/A N/A N/A
2003 N/A N/A N/A N/A
2004 N/A N/A N/A N/A
3001 N/A N/A N/A N/A
3002 N/A N/A N/A N/A
3003 N/A N/A N/A N/A
3004 N/A N/A N/A N/A
4001 N/A N/A N/A N/A
4002 N/A N/A N/A N/A
4003 N/A N/A N/A N/A
4004 N/A N/A N/A N/A
52.242-15 Stop-Work Order AUG 1989 52.242-17 Government Delay Of Work APR 1984 52.247-34 F.O.B. Destination NOV 1991
HQ F-2-0004 F.O.B. DESTINATION (NAVSEA) (APR 2015)
All supplies hereunder shall be delivered with all transportation charges prepaid, in accordance with the clause hereof entitled "F.O.B. DESTINATION" (FAR 52.247-34) in accordance with the delivery instructions specified herein.
The Contractor shall not ship directly to a military air or water port terminal without authorization by the cognizant Contract Administration Office.
Except when the Material Inspection and Receiving Report (MIRR) (DD 250) is used as an invoice, the Contractor shall enter unit prices on all MIRR copies. Contract line items shall be priced using actual prices, or if not available, estimated prices. When the price is estimated, an "E" shall be entered after the price.
All data to be furnished under this contract shall be delivered prepaid to destination(s) at the time(s) specified on the Contract Data Requirements List(s), DD Form 1423.
Section G - Contract Administration Data
252.204-0001 Line Item Specific: Single Funding SEP 2009
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)
(a) Definitions. As used in this clause--
Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.
Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.
(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall--
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:
(1) Document type. The Contractor shall use the following document type(s).
(Contracting Officer: Insert applicable document type(s). Note: If a “Combo” document type is identified but not supportable by the Contractor's business systems, an “Invoice” (stand-alone) and “Receiving Report” (stand-alone) document type may be used instead.)
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.
(Contracting Officer: Insert inspection and acceptance locations or “Not applicable”.)
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table* Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC N00253 Issue By DoDAAC N00253 Admin DoDAAC N00253 Inspect By DoDAAC N00253 Ship To Code N00253 Ship From Code ____ Mark For Code ____ Service Approver (DoDAAC) ____ Service Acceptor (DoDAAC) ____ Accept at Other DoDAAC ____ LPO DoDAAC ____ DCAA Auditor DoDAAC ____ Other DoDAAC(s) ____
(*Contracting Officer: Insert applicable DoDAAC information or “See schedule” if multiple ship to/acceptance locations apply, or “Not applicable.”)
(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.
(5) WAWF email notifications. The Contractor shall enter the email address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.
(Contracting Officer: Insert applicable email addresses or “Not applicable.”)
(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
(Contracting Officer: Insert applicable information or “Not applicable.”)
(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.
HQ G-2-0002 CONTRACT ADMINISTRATION DATA
Enter below the address (street and number, city, county, state and zip code) of the Contractor's facility which will administer the contract if such address is different from the address shown on the SF 26 or SF 33, as applicable.
HQ G-2-0004 PURCHASING OFFICE REPRESENTATIVE
PURCHASING OFFICE NUWC Division Keyport REPRESENTATIVE: Attn: Monique Klose
Contracting Officer Phone: 360-315-2215 Email: monique.klose@navy.mil
HQ G-2-0009 SUPPLEMENTAL INSTRUCTIONS REGARDING INVOICING (NAVSEA) (APR 2015)
(a) For other than firm fixed priced contract line item numbers (CLINs), the Contractor agrees to segregate costs incurred under this contract/task order (TO), as applicable, at the lowest level of performance, either at the technical instruction (TI), sub line item number (SLIN), or contract line item number (CLIN) level, rather than on a total contract/TO basis, and to submit invoices reflecting costs incurred at that level. Supporting documentation in Wide Area Workflow (WAWF) for invoices shall include summaries of work charged during the period covered as well as overall cumulative summaries by individual labor categories, rates, and hours (both straight time and overtime) invoiced; as well as, a cost breakdown of other direct costs (ODCs), materials, and travel, by TI, SLIN, or CLIN level. For other than firm fixed price subcontractors, subcontractors are also required to provide labor categories, rates, and hours (both straight time and overtime) invoiced; as well as, a cost breakdown of ODCs, materials, and travel invoiced. Supporting documentation may be encrypted before submission to the prime contractor for WAWF invoice submittal. Subcontractors may email encryption code information directly to the Contracting Officer (CO) and Contracting Officer Representative (COR). Should the subcontractor lack encryption capability, the subcontractor may also email detailed supporting cost information directly to the CO and COR; or other method as agreed to by the CO.
(b) Contractors submitting payment requests and receiving reports to WAWF using either Electronic Data Interchange (EDI) or Secure File Transfer Protocol (SFTP) shall separately send an email notification to the COR and CO on the same date they submit the invoice in WAWF. No payments shall be due if the contractor does not provide the COR and CO email notification as required herein.
Section H - Special Contract Requirements
5252.202-9101 ADDITIONAL DEFINITIONS (MAY 1993)
As used throughout this contract, the following terms shall have the meanings set forth below:
(a) DEPARTMENT - means the Department of the Navy.
(b) REFERENCES TO THE FEDERAL ACQUISITION REGULATION (FAR) - All references to the FAR in this contract shall be deemed to also reference the appropriate sections of the Defense FAR Supplement (DFARS), unless clearly indicated otherwise.
(c) REFERENCES TO ARMED SERVICES PROCUREMENT REGULATION OR DEFENSE ACQUISITION REGULATION - All references in this document to either the Armed Services Procurement Regulation (ASPR) or the Defense Acquisition Regulation (DAR) shall be deemed to be references to the appropriate sections of the
FAR/DFARS.
(d) NATIONAL STOCK NUMBERS - Whenever the term Federal Item Identification Number and its acronym FIIN or the term Federal Stock Number and its acronym FSN appear in the contract, order or their cited specifications and standards, the terms and acronyms shall be interpreted as National Item Identification Number (NIIN) and National Stock Number (NSN) respectively which shall be defined as follows:
(1) National Item Identification Number (NIIN). The number assigned to each approved Item Identification under the Federal Cataloging Program. It consists of nine numeric characters, the first two of which are the National Codification Bureau (NCB) Code. The remaining positions consist of a seven digit non-significant number.
(2) National Stock Number (NSN). The National Stock Number (NSN) for an item of supply consists of the applicable four position Federal Supply Class (FSC) plus the applicable nine position NIIN assigned to the item of supply.
5252.216-9110 ORDERS (FIXED-PRICE) (JAN 2008)
(a) General. Orders for supplies or services specified in Section B of the Schedule may be issued by the Contracting Officer at any time during the effective period of this agreement. Except as otherwise provided in paragraph (e) below, the Contractor agrees to accept and perform orders issued by the Contracting Officer within the scope of this agreement.
It is understood and agreed that the Government has no obligation under the terms of this agreement to issue any orders.
Except as otherwise provided in any order, the Contractor shall furnish all materials and services necessary to accomplish the work specified in each order issued hereunder; provided, however, that this agreement shall not be used for the furnishing of supplies or services which are covered by any "guaranty" or "warranty" clause(s) of the contract(s) under which the supplies were manufactured. In the event of any inconsistency between any order and this agreement, this agreement shall control. All requirements of this agreement shall be applicable to all orders issued hereunder.
Wherever the word "contract" appears in this agreement, it shall be deemed to include within its meaning the word "order", and each order shall be considered a separate binding contract as of its effective date. The Contractor shall segregate the costs incurred in the performance of any order issued hereunder from the costs of all other orders issued under this agreement.
(b) Ordering. Orders and revisions thereto shall be made in writing and be signed by any authorized Contracting Officer cited in paragraph (i). Each order shall:
(1) set forth detailed specifications or requirements for the supplies or services being ordered, (or reference applicable specifications or requirements in Section C of this agreement), and, shall refer to the appropriate item under Section B of this agreement;
(2) set forth quantities being ordered;
(3) set forth preservation, packaging and packing instructions, if any;
(4) set forth delivery or performance dates;
(5) designate the place(s) where inspection and acceptance will be made by the Government;
(6) set forth either the firm contract price or, in the case of an undefinitized order, the definitization schedule and both the monetary limitation on Government liability for the undefinitized order and the maximum ceiling amount at which the order may be definitized;
(7) set forth appropriation and accounting data for the work being ordered;
(8) set forth any discount offered for prompt payment;
(9) be dated;
(10) be identified by number in accordance with DFARS 204.7004;
(11) set forth the property, if any, to be furnished by the Government and the date(s) such property is to be delivered to the Contractor;
(12) set forth the disbursing office where payment is to be made and other applicable contract administration data;
(13) cite the applicable circumstance or exception and the justification control number. Orders for items not identified in the class justification, or an individual justification, and the basic ordering agreement are unauthorized;
(14) be issued on an SF 26 or a DD Form 1155; and
(15) set forth any other pertinent information.
(c) Firm Priced Orders. Except as otherwise provided in paragraph (d) below, the Contractor shall not begin any work on an order until a firm priced order is issued by the Contracting Officer. Upon receipt of a proposed order, the Contractor shall promptly submit to the Contracting Officer a price proposal for the work specified in the order. The Contractor agrees that it will submit such cost or pricing data as the Contracting Officer may require. Promptly after receipt of the Contractor's proposal and supporting cost or pricing data, if required, the Contractor and the Contracting Officer shall negotiate and agree upon a price and delivery schedule for the work being ordered. The price and delivery schedule, as agreed upon, shall be set forth in the priced order and the order shall be signed by both the Contracting Officer and the Contractor. Upon receipt of the priced order, the Contractor shall promptly commence work and shall diligently complete it.
(d) Undefinitized Orders. Whenever the Contracting Officer determines that urgent demands or requirements prevent the issuance of a firm priced order, the Contracting Officer may issue an unpriced order. Such order may be unilateral or bilateral and shall establish a limitation on Government liability, a maximum ceiling amount and a schedule for definitization, as described in subparagraph (f)(2) below. Upon request, the Contractor shall submit a maximum ceiling amount proposal before the undefinitized order is issued. The maximum ceiling amount is the maximum price at which the order may be definitized. Except as provided in paragraph (e) below, the Contractor shall commence performance of the order upon receipt. The clause entitled "CONTRACT DEFINITIZATION" (DFARS 252.217-7027) shall be included in any undefinitized order.
(e) Rejection of Unilateral Orders. The Contractor may reject any unilateral order if the Contractor determines it cannot feasibly perform the order, or if it does not concur with the maximum ceiling amount.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .