This is a Statement of Work (SOW) for office furniture design, delivery, and installation services for Maritime Expeditionary Squadron Seven (MSRON 7) at Naval Weapon Station Base - Seal Beach, located at 800 Seal Beach Boulevard, Building 77, Seal Beach, California 90740.
The contractor must design, deliver, and install seven 66-inch width by 24-inch depth rectangular workstations, each equipped with two grommets (left/right), one freestanding metal Box/Box/File pedestal, and one 24-inch metal floating shelf with 50-inch height tuckable fabric panels. Six of the seven workstations require power with a single duplex outlet per person. The scope also includes four two-seat lounge sofas, three additional freestanding metal pedestals for existing L-stations, minor floor preparation, and base cover. The contractor must provide comprehensive design and floor plans with room dimensions and space optimization layouts, dispose of existing furniture, and maintain daily cleanup of packaging and trash. Installation services are limited to normal business hours (Monday through Friday) with direct paved access to the building, first deck entry, and second deck elevator access, with no double handling or staircase transfers included. The Period of Performance is 90 days after receipt of order (ARO). Deliverables include design and floor plans with cost proposal, detailed product specifications with clear pricing, and warranty documentation for all deliverables upon project completion. The Government will furnish an electrician to connect power in-feed and Navy personnel to install NMCI unclassified ports and phone lines. A sign-off walk-through will be conducted upon completion, with any identified damaged or missing items to be remedied within 45 days or as mutually agreed. The contractor is responsible for promptly rectifying any quality issues or defects at no additional cost to the facility.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MSRON 7 - Building 77 Office Renovation SOW
STATEMENT OF WORK
Office Furniture for Building 77
Maritime Expeditionary Squadron Seven (MSRON 7) Prepared for: Naval Weapon Station Base - Seal Beach
Background: MSRON 7 has an immediate requirement to design new workspaces to support an increase in personnel and utilize the existing space efficiently. These additional workstations will allow personnel to continue critical operations and day-to-day functions without operational degradation.
Project Objective:
MSRON 7 has a requirement for the design, delivery, and installation of new office cubicles, ergonomic office chairs, and sofas. This includes minor floor preparation and base cover. The objective is to design new workspaces to support an increase in personnel, utilize existing space efficiently, remove old storage cabinets, and replace them with modern cubicles. The project will deliver (7) stations with private panels and four (4) two-seat lounge sofas, maximizing drawers and shelves per station.
Requirements:
• (7) 66"W x 24"D rectangular workstations each to include –
• (2) Grommets left/right
• (1) Freestanding support metal Box/Box/File pedestal, and (1) 24"W metal floating shelf.
*Using existing task chairs. * All panels are 50"H tuckable fabric.
• (6) of the workstations to be powered with a single duplex outlet per person. Design also includes - (4) 2-seat lounge chairs, and (3) additional freestanding metal support Box/Box/File
• Pedestals for existing L-stations. Final Gr. A/1 finishes TBD at time of award.
• Contractor to provide design and floor plans with room dimensions and space plans to maximize workstation sizes and locations of new panels, stations, and storage.
• Navy personnel to provide installation of NMCI unclassified ports and phone lines as needed per station.
• Warranty information to be provided for all deliverables.
• Contractor is required to dispose of existing furniture.
• The area must be left tidy with all packaging and trash removed daily.
• Upon completion of installation, a sign-off walk-through of the space will be conducted with the Government Point of Contact (GPOC) and the contractor supervisor. Any damaged or missing items will be documented, and the contractor shall remedy and complete all punch-list work within 45 days or as mutually agreed.
• In the event of any quality issues or defects, the contractor shall rectify the issue promptly and without additional cost to the facility.
Installation:
• Installation services shall be based on normal business hours Monday through Friday.
• Delivery and installation are based on direct, paved access to the building, with nearby 1st
Deck entry and elevator access to the 2nd Deck. No double handling or staircase transfers are included.
MSRON 7 - Building 77 Office Renovation SOW
Government Furnished Resources:
• Customer (Government) to provide an electrician to connect the power in-feed to the building.
• Navy personnel provide installation of NMCI unclassified ports and phone lines as needed per station.
Place of Performance:
Naval Weapon Station Base - Seal Beach 800 Seal Beach BLVD. BLDG #77 Seal Beach, CA 90740
Period of Performance (POP):
Completion 90 Days ARO
Deliverables:
• Design & Floor Plans: Provide comprehensive layout designs along with the cost proposal.
• Product Specifications: Provide a detailed description of proposed products with clear pricing.
• Warranty Documentation: Warranty information must be provided for all deliverables upon project completion.
Hours of Operation:
All on-site work shall be performed during normal business hours, Monday through Friday, excluding federal holidays.
Points of Contact (POC):