Statement of Work_PAC.pdf
PDF 45 KB Posted
- Solicitation number
- N00244-26-Q-0080
About this file
This is a Statement of Work for preventive maintenance services on government-owned Petroleum Analyzer (PAC) laboratory equipment at the NAVSUP FLC-SD Petroleum Laboratory located at Point Loma Fuel Department.
The contractor shall provide yearly preventive maintenance and calibration services on all government-owned automated laboratory equipment manufactured or distributed by Petroleum Analyzer. Services include on-site diagnostics, identification of worn or nearly consumed parts, equipment cleaning, calibration, and repairs. The work is performed on-site and typically requires 3-5 days to complete. Upon completion, the contractor shall provide certification stating that all equipment is in good condition. Additional service items include repairs to equipment identified during previous maintenance that were beyond the scope of normal calibration and maintenance and required additional parts and labor. The preventive maintenance program is designed to minimize unscheduled equipment breakdowns by alerting laboratory personnel to potential issues. Results from the fuel testing performed by this laboratory are reported to the Fleet and all Navy/Marine Air Stations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| J A_PAC service_Redacted.pdf | ||
| 4.01 Intent to Sole Source Notice_PAC.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Preventive Maintenance on government-owned PAC laboratory equipment. NAVSUP FLC-SD Petroleum Laboratory is a regional laboratory, located at Point Loma Fuel Department. This laboratory tests fuel samples and report all results to the Fleet as well as all Navy/Marine Air Stations. Requested purchase order is to perform yearly preventive/calibration on all government-owned automated laboratory equipment.
All identified Laboratory equipment needing these services were manufactured/distributed by Petroleum Analyzer (PAC). Yearly service has been done by a PAC Technician authorized to perform required repair, calibration, cleaning, etc. These PM requirements will perform diagnostics of the unit, to identify if any worn or nearly consumed parts and alert laboratory personnel, thereby minimize unscheduled breakdown.
This service is performed on-site and usually lasts 3-5 days. Included in this service is a certification stating the equipment/all equipment are in good condition. Additional service items include repairs to equipment that were identified in the previous equipment groom but were beyond the scope of normal calibration and maintenance and required additional parts and labor.