This document is a Statement of Work (SOW) that describes the requirements for JP5 barge fueling services to support the USS CARL VINSON aircraft carrier.

The key details are:

  • The USS CARL VINSON requires JP5 fuel barge services to transit from Point Loma to Naval Air Station North Island to refuel the ship from November 4-8, 2024.
  • The contractor must provide a barge, transportation, hoses, and other equipment to load approximately 374,000 gallons of JP5 fuel per day and deliver it to the USS CARL VINSON.
  • This SOW is associated with a federal contract opportunity, Solicitation Number N00244-25-R-0006, issued by the Department of the Navy's Naval Supply Systems Command as a 100% small business set-aside. The contract type will be Firm Fixed Price.
  • Proposals are due by October 29, 2024, and the period of performance is November 4-8, 2024.

View the file

Other files

File Type Posted
N00244-25-R-0006.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

JP5 BARGE FUELING SERVICE

Description: USS CARL VINSON is getting ready to go on deployment. The ships current fuel level is low and will be an issue when the aircrafts are onboard requesting for fuel for flight ops. Local Point Loma fuel farm doesn’t support barge fuel services for delivery. USS CARL VINSON requires JP5 fuel barge services to transit from Point

Loma to transfer and deliver JP5 fuel to USS CARL VINSON at Naval Air Station North Island (NASNI)

General Information: The USS CARL VINSON (CVN-70) is requesting JP5 Barge Fueling Service and fuel uploading onto the ship from 04th NOV 2024 to 08th of NOV 2024. Contractor must provide barge, transportation, ANSI-8 bolt flange connections/adapters and 6-inch diameter hose at 50 foot standard length. Contractor must also ensure their hose connections had cellophane sleeve to act as a spray shield and taped at each end to accomplish uploading the fuel onto the USS CARL VINSON (CVN-70).

Requirements:

- November 4th - Load Barge at Point Loma with JP-5 (approx. 374,000 gals.).

- November 4th – Deliver Barge with JP-5 to the USS Carl Vinson.

- November 5th - Load Barge at Point Loma with JP-5 (approx. 374,000 gals.).

- November 5th - Deliver Barge with JP-5 to the USS Carl Vinson.

- November 6th - Load Barge at Point Loma with JP-5 (approx. 374,000 gals.).

- November 6th – Deliver Barge with JP-5 to the USS Carl Vinson.

- November 7th - Load Barge at Point Loma with JP-5 (approx. 374,000 gals.).

- November 7th – Deliver Barge with JP-5 to the USS Carl Vinson.

- November 8th - Load Barge at Point Loma with JP-5 (approx. 374,000 gals.).

- November 8th – Deliver Barge with JP-5 to the USS Carl Vinson.

Government Equipment Furnished: N/A

Period of Performance: 04 November 2024 to 08 November 2024