1.02 Statement Of Work_Redacted.pdf
PDF 371 KB Posted
- Attached to
- FORKLIFT RENTALS Federal contract opportunity
- Solicitation number
- N00244-24-Q-0296
About this file
This document is a Statement of Work (SOW) for a contract to provide forklift rentals and related services to the USS Theodore Roosevelt (CVN 71) naval vessel. The SOW specifies the required equipment, including three 5,000 lb forklifts, one 20,000 lb forklift, and nine 50-gallon LP tanks, to be delivered to the NASNI Pier "L" on the USS Theodore Roosevelt. The performance period is 15 Aug 2024 to 15 Aug 2025. The vendor is required to provide a quote, notify the requestor of any delays, and perform all maintenance and repairs. Payment will be made via government purchase card.
The related federal contract opportunity is solicitation number N00244-24-Q-0296 for "FORKLIFT RENTALS", issued by the Department of the Navy Naval Supply Systems Command. This opportunity was awarded to UNITED RENTALS, INC. on 2024-08-16 for $65,300.96.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1.02 J&A._Redacted.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMEMENT OF WORK
03 AUG 2024
USS THEODORE ROOSEVELT (CVN 71)
REQUESTOR
SUPPLY DEPARTMENT/ S-1 (UIC: R21247)
USS THEODORE ROOSEVELT (CVN 71)
FPO AP 92135-0001
REQUESTOR LOCATION
USS Theodore Roosevelt (CVN 71) DLA San Diego SW3244 SW3205 N Island FAC Rogers RD, Bldg 656 15 MPC San Diego, CA 92135
USA
PERIOD OF PERFORMANCE
PERIOD OF PERFORMANCE: 15 AUG 2024 – 15 AUG 2025
DESCRIPTION
1. WORK LOCATION:
A. NASNI PIER “L” USS THEODORE ROOSEVELT
2. MATERIAL:
A. (3) 5K FORKLIFT
(1) 20K FORKLIFT
(9) LP TANKS
50 GAL DIESEL FUEL (20K)
3. WORK SPECIFICATIONS:
a. VENDER WILL SUPPLY (3) 5K FORKLIFTS (1) 20K FORKLIFT AIR
TIRES; 48 INCH FORKS; SIDE SHIFTER WITH FULL FREE-LIFT
MAST; LIFTING HEIGHTS VARIES UP TO 24 FEET; INCLUDES
REPAIRS TO ALL FLAT TIRES; INCLUDES 3 EXTRA LPG TANKS
(FULL) PER FORKLIFT; INCLUDES ALL MAINTENANCE (PERIODIC
AND CORRECTIVE) DELIVERY AND PICK UP.
VENDOR REQUIREMENTS
VENDOR SHALL PROVIDE QUOTE DOCUMENT TO THE SHIP.
NOTIFY REQUESTOR IMMEDIATELY IF ANY UNFORESEEN EVENTS CAUSE
THE VENDOR TO DELAY DELIVERY.
REQUESTOR REQUIREMENTS
DELIVERY REQUIREMENTS
USS Theodore Roosevelt (CVN 71)
NASNI
Deliver to PIER L
ORDERING SERVICES
METHOD OF PAYMENT: GOVERNMENT PURCHASE CARD