N0024419Q0252_1.02_R454119106MC05_PWS_LCAC_Rudder_05_August_2019.doc

DOC document 66 KB Posted

Attached to
ACU-5 LCAC RUDDER POSITION ACTUATOR ASSEMBLY REFURBISHMENT
Solicitation number
N0024419Q0252
Issued by

About this file

N0024419Q0252_1.02_R454119106MC05_PWS_LCAC_Rudder_05_August_2019.doc

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACU-5 LCAC RUDDER POSITION ACTUATOR ASSEMBLY REFURBISHMENT

Performance-Based Statement Of Work

***THE IS A DRAFT ONLY***

1.0 General.

1.1 Organization to be supported:

ACU-5 Supply Department ATTN: Charles E. Fletcher II (Contracting Officer) 1.2 Scope:

Requesting refurbishment of 8 LCAC Rudder position actuator assembly.

1.2.1 Clearances and Licensing/Credentials:

The work to be performed for this order requires a no security clearance.

1.3 Project Objective and Background:

1.3.1 Objective:

The objective is for contractor to refurbish 8 of LCAC Rudder position actuator assembly back to a ready for issue status.

1.3.2 Background:

LCAC RUDDER ACTUATOR ASSEMBLY NSN 4810-01-459-3368 is very important components required for LCAC operation. The Navy supply system have very limit stock available and the part has very long lead-times from manufacture. The manufacture is TACTAIR FLUID CONTROLS, Inc., 4806 W Taft Road, Liverpool, NY 13088-4810. Part Number 7-5081-3.

2.0 Definitions.

Best Effort:

That effort expended by the Contractor to perform within the awarded contract; all work specified in this order and any other obligations under this order and the basic contract vehicle. This effort includes providing required qualified personnel, properly supervised, and following industry methodologies.

3.0 Specific Requirements.

The following sections outline the specific order requirements, performance indicators, associated standards, and Government quality assurance methods. Sections 3.0 work, describe the specific requirements and performance measurements associated with this order. Weekly progress status reports shall be submitted to the authorized Point of Contact (POC) at ACU-5, Camp Pendleton, CA 92055 and the Contracting Officer at Fleet Logistics Center San Diego, CA 291236 via e-mail.

3.1 Description:

Specifics include the following:

3.1.1 Electrical:

Electrical components that will be replaced with new components are follows:

Servo test and calibrate the actuator.

3.1.2 Hydraulic System:

Tear down the actuator and conduct the inspection.

* Conduct the proper evaluation.

* Replace the damaged parts.

* Reseal the actuator assembly.

* Strip and re -anodize the actuator.

* Conducted the inspection ( NDI).

* Flame spray the actuator rods.

* Re-assemble the actuator.

* Conduct the operation test.

Hydraulic components that will be replaced with new components (or rebuilt) are as follows:

multiple O-ring.

multiple seals.

Actuator will be Drained, and Replenished with New Hydraulic Oil.

Cylinders: All cylinders will be evaluated and performance checked according to specifications. Any required cylinder reseals will be performed, to include replacement of cylinder rods when required.

4.0 Government Furnished Items and Services.

None 5.0

Contractor Furnished Items and Services.

Facilities, Supplies and Services:

The Contractor shall provide technical support as needed to meet the requirements of NSTM S9562-AB-TMM-079.

6.0

DELIVERABLES / S

ACU-5 will delivery and pick up the rudder position actuator assemblies from the contractor’s repair facility

6.1 Schedule of Deliverables/s None 6.2 Performance Requirements Summary

This table specifies the standard for satisfactory performance of the work specified in this statement of work.

Primary Performance Objective
Performance Standard
Performance Assessment Method
3.0
The Contractor shall perform refurbishment 8 of ACU-5 LCAC Rudder position actuator assembly to like new condition.
Provide Quality product on time with no rework.
Monitoring of successful completion dates and post inspections performed by Rube’s Hydraulic INC.

6.3 Quality Assurance Methodology Inspections of the Schedule of Deliverables will be based on the standards in the Performance Requirements Summary.

What will be inspected
Who will inspect it
When it will be inspected
Where it will be inspected
How it will be inspected

3.1.1 3.1.2 Servo test and calibration NDI and operation test

ACU-5

Upon completion of testing Upon completion of testing

ACU-5

Operation test as per NSTM Operation test as per NSTM

7.0 Completion of refurbishment:

Upon completion of refurbishment 8 of ACU-5 LCAC Rudder, position actuator assembly. An E7 or Above from ACU-5 will inspect the below documentation.

7.1 Refurbishment:

Refurbishment of the 8 rudder position actuator assembly in accordance with the PWS.

8.0 Other Information.

8.1 Place of Performance:

The contractor’s facility.

8.2 Period of Performance:

A scheduled Site Visit is to be scheduled. The Government will not be responsible for any costs related to the scheduled Site Visit.

8.3

Transportation:

ACU-5 will be responsible for delivery and pick up the rudder position actuator assemblies.

8.4 Documentation Submission:

Contractor shall submit one legible copy, in hard copy or electronic media, of a report listing results of the requirements of 3.2, to theACU-5 representative, showing exact damaged parts required replacement.

8.5

Points of Contact:

8.5.1 Contracting Officer

Mr. Charles E. Fletcher II, Code 220

Fleet & Industrial Supply Center, San Diego (FISCSD)

Regional Contracts Department (Code 200)

3985 Cummings Road

San Diego, CA 92136-4200 Telephone: (619) 556-5519 Fax: (619) 556-9781 E-mail: charles.e.fletcher1@navy.mil

8.5. 2 An authorized Point of Contact at ACU-5 is to be determined.

8.6 Reference Documents:

The Contractor shall adhere to the following documents to the extent they are applicable to the work required by this PBSOW.

8.6.1 Technical Specification, NSTM S9562-AB-TMM-079

8.6.2 MIL STD 1689A.

File details come from the government source that posted it.