N0024418R0044_SOLICITATION.pdf
PDF 444 KB Posted
- Solicitation number
- N0024418R0044
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachments_List_1_2_3.docx | DOCX document | |
| WD_15_5625_16_Jan_2018.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
N0024418R0044 17-Jul-2018
b. TELEPHONE NUMBER
562-626-7074
8. OFFER DUE DATE/LOCAL TIME
12:00 PM 16 Aug 2018
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
N002449. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
GLORIA E. QUINTERO
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
N6923218RC014F1
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED ORX
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
NAVSUP FLC SAN DIEGO
REGIONAL CONTRACTS (CODE 200)
800 SEAL BEACH BLVD
BUILDING 239
SEAL BEACH CA 90740-5000
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
X SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$7,500,000
NAICS:
811310
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
N0024418R0044
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
PREVENTIVE MAINTENANCE (PM) GALLEY EQUIP
FFP
SEE PERFORMANCE WORK STATEMENT
INVOICING: ALL INVOICES SHALL BE SUBMITTED MONTHY IN
ARREARS VIA IRAPT - SEE DFAR CLAUSE 252.232-7006.
MILSTRIP: N6923218RC014F1
PURCHASE REQUEST NUMBER: N6923218RC014F1
NET AMT
0001AA Months
PT. HUENEME PREVENTIVE MAINTENANCE
FFP
NAVAL BASE PORT HUENEME GALLEY EQUIPMENT PREVENTIVE
MAINTENANCE - SEE PWS
FOB: Destination
0001AB Months
PT. MUGU GALLEY PREVENTIVE MAINTENANCE
FFP
NAVAL BASE POINT MUGU GALLEY EQUIPMENT PREVENTIVE
0001AC Months
SAN NICHOLAS ISLAND PREVENTIVE MAINT.
FFP
SAN NICHOLAS ISLAND GALLEY EQUIPMENT PREVENTIVE
MAINTENANCE- SEE PWS.
T&M - LABOR HOURS CORRECTIVE MAINTENANCE
T&M
LABOR HOURS FOR CORRECTIVE MAINTENANCE (CM) OF GALLEY
EQUIPMENT. SEE ATTACHMENTS 1 THRU 6 AND PERFORMANCE
WORK STATEMENT.
LABOR HOUR RATE FOR CORRECTIVE MAINTENANCE = $XX.XX //HR
TRAVEL RATE = $XX.XX/TRIP
NOTES:
(1) LABOR CATEGORY IS 23110 APPLIANCE MECHANIC (DOL SCA
DIRECTORY OF OCCUPATIONS 5TH ED.)
(2) LABOR HOURS FOR CM SHALL BE FOR ACTUAL TIME USED IN
CM PERFORMANCE ONLY. TRAVEL TIME SHALL NOT BE INCLUDED
IN CM LABOR HOURS.
(3) INVOICING: ALL INVOICES SHALL BE SUBMITTED MONTHLY IN
ARREARS VIA WIDE AREA WORK FLOW (WAWF) - SEE DFAR
CLAUSE 252.232-7006.
(4) "TRIP" IS DEFINED AS TECHNICIAN TRAVEL FROM PLACE OF
BUSINESS TO APPROPRIATE GALLEY AND BACK TO PLACE OF
BUSINESS - I.E. ROUND TRIP.
TOT ESTIMATED PRICE
CEILING PRICE
0002AA Hours
NAVAL BASE VENTURA PT. HUENEME GALLEY CM
T&M
CM LABOR - NAVAL BASE VENTURA PT. HUENEME GALLEY
CORRECTIVE MAINTENANCE (CM) - SEE PWS
0002AB Hours
NAVAL BASE PT. MUGU GALLEY CM
T&M
CM LABOR - NAVAL BASE PT. MUGU GALLEY CORRECTIVE
MAINTENANCE (CM) - SEE PWS
0002AC Hours
ST. NICOLAS ISLAND GALLEY CM
T&M
CM LABOR - NAVAL BASE VENTURA PT. HUENEME GALLEY
MATERIAL - OTHER DIRECT COST (ODC)
FFP
MATERIAL ODC INCLUDES REPAIR PARTS COST AND TRAVEL COST
(WHEN APPLICABLE) FOR CORRECTIVE MAINTENANCE (CM) OF
GALLEY EQUIPMENT. SEE ATTACHMENTS 1-6 AND PERFORMANCE
WORK STATEMENT (PWS).
NOTES:
1. PARTS.
(A) ONLY BRAND-NEW PARTS SHALL BE USED. USE OF OTHER THAN
BRAND-NEW CONDITION PARTS HAVE TO BE APPROVED BY THE COR.
(B) THE CONTRACTOR WILL BE REIMBURSED FOR THE ACTUAL COST
OF REPAIR PARTS DEEMED "FAIR-AND-REASONABLE" BY THE COR.
(C) REPAIR PARTS COST REIMBURSEMENT IS SUBJECT TO PCO
APPROVAL IF PRICE VERIFIED BY COR IS MORE THAN 5% OF
PREVAILING MARKET PRICE.
(D) ITEMIZED RECEIPTS/INVOICES SHALL BE PROVIDED FOR
REIMBURSABLE PARTS.
2. TRAVEL. TRAVEL COST SHALL INCLUDE ONLY COSTS CLEARLY
EXCLUDED FROM THE LABOR-HOUR RATE. IT SHALL ALSO BE
LIMITED TO JOINT TRAVEL REGULATIONS POLICIES TO INCLUDE THE
“12 HOUR RULE” (JTR C4050A(20)) – I.E. PERDIEM IS NOT PAYABLE FOR
“TRAVEL OF 12 OR FEWER HOURS.” ALL CONTRACTOR TRAVELS FOR
CM PERFORMANCE SHALL BE FOR 12 OR FEWER HOURS, AND
OVERNIGHT STAY IS NOT AUTHORIZED.
3. INVOICING: ALL INVOICES SHALL BE SUBMITTED MONTHLY IN
ARREARS VIA WIDE AREA WORK FLOW (WAWF) - SEE DFAR CLAUSE
252.232-7006.
0003AA 1 Lot
MATERIAL: ODC NBVC PT. HUENEME CM
FFP
NAVAL BASE VENTURA COUNTY PT. HUENEME CM
0003AB 1 Lot
NAVAL BASE VENTURA COUNTY PT. HUENEME CM
FFP
NAVAL BASE PT. MUGU CM
0003AC 1 Lot
NAVAL BASE PT. MUGU CM
FFP
NAVAL BASE ST. NICOLAS ISLAND CM
OPTION PREVENTIVE MAINTENANCE (PM) GALLEY EQUIP
FFP
SEE PERFORMANCE WORK STATEMENT
INVOICING: ALL INVOICES SHALL BE SUBMITTED MONTHY IN
ARREARS VIA IRAPT - SEE DFAR CLAUSE 252.232-7006.
1001AA Months
PT. HUENEME PREVENTIVE MAINTENANCE
FFP
NAVAL BASE PORT HUENEME GALLEY EQUIPMENT PREVENTIVE
1001AB Months
PT. MUGU GALLEY PREVENTIVE MAINTENANCE
FFP
NAVAL BASE POINT MUGU GALLEY EQUIPMENT PREVENTIVE
1001AC Months
SAN NICHOLAS ISLAND PREVENTIVE MAINT.
FFP
SAN NICHOLAS ISLAND GALLEY EQUIPMENT PREVENTIVE
T&M - LABOR HOURS CORRECTIVE MAINTENANCE
T&M
LABOR HOURS FOR CORRECTIVE MAINTENANCE (CM) OF GALLEY
EQUIPMENT. SEE ATTACHMENTS 1 THRU 6 AND PERFORMANCE
WORK STATEMENT.
LABOR HOUR RATE FOR CORRECTIVE MAINTENANCE = $XX.XX //HR
TRAVEL RATE = $XX.XX/TRIP
NOTES:
(1) LABOR CATEGORY IS 23110 APPLIANCE MECHANIC (DOL SCA
DIRECTORY OF OCCUPATIONS 5TH ED.)
(2) LABOR HOURS FOR CM SHALL BE FOR ACTUAL TIME USED IN
CM PERFORMANCE ONLY. TRAVEL TIME SHALL NOT BE INCLUDED
IN CM LABOR HOURS.
(3) INVOICING: ALL INVOICES SHALL BE SUBMITTED MONTHLY IN
ARREARS VIA WIDE AREA WORK FLOW (WAWF) - SEE DFAR
CLAUSE 252.232-7006.
(4) "TRIP" IS DEFINED AS TECHNICIAN TRAVEL FROM PLACE OF
1002AA Hours
NAVAL BASE VENTURA PT. HUENEME GALLEY CM
T&M
CM LABOR - NAVAL BASE VENTURA PT. HUENEME GALLEY
1002AB Hours
NAVAL BASE PT. MUGU GALLEY CM
T&M
CM LABOR - NAVAL BASE PT. MUGU GALLEY CORRECTIVE
1002AC Hours
ST. NICOLAS ISLAND GALLEY CM
T&M
CM LABOR - NAVAL BASE VENTURA PT. HUENEME GALLEY
MATERIAL - OTHER DIRECT COST (ODC)
FFP
MATERIAL ODC INCLUDES REPAIR PARTS COST AND TRAVEL COST
(WHEN APPLICABLE) FOR CORRECTIVE MAINTENANCE (CM) OF
GALLEY EQUIPMENT. SEE ATTACHMENTS 1-6 AND PERFORMANCE
WORK STATEMENT (PWS).
NOTES:
1. PARTS.
(A) ONLY BRAND-NEW PARTS SHALL BE USED. USE OF OTHER THAN
BRAND-NEW CONDITION PARTS HAVE TO BE APPROVED BY THE COR.
(B) THE CONTRACTOR WILL BE REIMBURSED FOR THE ACTUAL COST
OF REPAIR PARTS DEEMED "FAIR-AND-REASONABLE" BY THE COR.
(C) REPAIR PARTS COST REIMBURSEMENT IS SUBJECT TO PCO
APPROVAL IF PRICE VERIFIED BY COR IS MORE THAN 5% OF
PREVAILING MARKET PRICE.
(D) ITEMIZED RECEIPTS/INVOICES SHALL BE PROVIDED FOR
REIMBURSABLE PARTS.
2. TRAVEL. TRAVEL COST SHALL INCLUDE ONLY COSTS CLEARLY
EXCLUDED FROM THE LABOR-HOUR RATE. IT SHALL ALSO BE
LIMITED TO JOINT TRAVEL REGULATIONS POLICIES TO INCLUDE THE
“12 HOUR RULE” (JTR C4050A(20)) – I.E. PERDIEM IS NOT PAYABLE FOR
“TRAVEL OF 12 OR FEWER HOURS.” ALL CONTRACTOR TRAVELS FOR
CM PERFORMANCE SHALL BE FOR 12 OR FEWER HOURS, AND
OVERNIGHT STAY IS NOT AUTHORIZED.
3. INVOICING: ALL INVOICES SHALL BE SUBMITTED MONTHLY IN
1003AA 1 Lot
MATERIAL: ODC NBVC PT. HUENEME CM
FFP
1003AB 1 Lot
NAVAL BASE VENTURA COUNTY PT. HUENEME CM
FFP
1003AC 1 Lot
NAVAL BASE PT. MUGU CM
FFP
OPTION PREVENTIVE MAINTENANCE (PM) GALLEY EQUIP
FFP
SEE PERFORMANCE WORK STATEMENT
INVOICING: ALL INVOICES SHALL BE SUBMITTED MONTHY IN
ARREARS VIA IRAPT - SEE DFAR CLAUSE 252.232-7006.
2001AA Months
PT. HUENEME PREVENTIVE MAINTENANCE
FFP
NAVAL BASE PORT HUENEME GALLEY EQUIPMENT PREVENTIVE
2001AB Months
PT. MUGU GALLEY PREVENTIVE MAINTENANCE
FFP
NAVAL BASE POINT MUGU GALLEY EQUIPMENT PREVENTIVE
2001AC Months
SAN NICHOLAS ISLAND PREVENTIVE MAINT.
FFP
SAN NICHOLAS ISLAND GALLEY EQUIPMENT PREVENTIVE
T&M - LABOR HOURS CORRECTIVE MAINTENANCE
T&M
LABOR HOURS FOR CORRECTIVE MAINTENANCE (CM) OF GALLEY
EQUIPMENT. SEE ATTACHMENTS 1 THRU 6 AND PERFORMANCE
WORK STATEMENT.
LABOR HOUR RATE FOR CORRECTIVE MAINTENANCE = $XX.XX //HR
TRAVEL RATE = $XX.XX/TRIP
NOTES:
(1) LABOR CATEGORY IS 23110 APPLIANCE MECHANIC (DOL SCA
DIRECTORY OF OCCUPATIONS 5TH ED.)
(2) LABOR HOURS FOR CM SHALL BE FOR ACTUAL TIME USED IN
CM PERFORMANCE ONLY. TRAVEL TIME SHALL NOT BE INCLUDED
IN CM LABOR HOURS.
(3) INVOICING: ALL INVOICES SHALL BE SUBMITTED MONTHLY IN
ARREARS VIA WIDE AREA WORK FLOW (WAWF) - SEE DFAR
CLAUSE 252.232-7006.
(4) "TRIP" IS DEFINED AS TECHNICIAN TRAVEL FROM PLACE OF
2002AA Hours
NAVAL BASE VENTURA PT. HUENEME GALLEY CM
T&M
CM LABOR - NAVAL BASE VENTURA PT. HUENEME GALLEY
2002AB Hours
NAVAL BASE PT. MUGU GALLEY CM
T&M
CM LABOR - NAVAL BASE PT. MUGU GALLEY CORRECTIVE
2002AC Hours
ST. NICOLAS ISLAND GALLEY CM
T&M
CM LABOR - NAVAL BASE VENTURA PT. HUENEME GALLEY
MATERIAL - OTHER DIRECT COST (ODC)
FFP
MATERIAL ODC INCLUDES REPAIR PARTS COST AND TRAVEL COST
(WHEN APPLICABLE) FOR CORRECTIVE MAINTENANCE (CM) OF
GALLEY EQUIPMENT. SEE ATTACHMENTS 1-6 AND PERFORMANCE
WORK STATEMENT (PWS).
NOTES:
1. PARTS.
(A) ONLY BRAND-NEW PARTS SHALL BE USED. USE OF OTHER THAN
BRAND-NEW CONDITION PARTS HAVE TO BE APPROVED BY THE COR.
(B) THE CONTRACTOR WILL BE REIMBURSED FOR THE ACTUAL COST
OF REPAIR PARTS DEEMED "FAIR-AND-REASONABLE" BY THE COR.
(C) REPAIR PARTS COST REIMBURSEMENT IS SUBJECT TO PCO
APPROVAL IF PRICE VERIFIED BY COR IS MORE THAN 5% OF
PREVAILING MARKET PRICE.
(D) ITEMIZED RECEIPTS/INVOICES SHALL BE PROVIDED FOR
REIMBURSABLE PARTS.
2. TRAVEL. TRAVEL COST SHALL INCLUDE ONLY COSTS CLEARLY
EXCLUDED FROM THE LABOR-HOUR RATE. IT SHALL ALSO BE
LIMITED TO JOINT TRAVEL REGULATIONS POLICIES TO INCLUDE THE
“12 HOUR RULE” (JTR C4050A(20)) – I.E. PERDIEM IS NOT PAYABLE FOR
“TRAVEL OF 12 OR FEWER HOURS.” ALL CONTRACTOR TRAVELS FOR
CM PERFORMANCE SHALL BE FOR 12 OR FEWER HOURS, AND
OVERNIGHT STAY IS NOT AUTHORIZED.
3. INVOICING: ALL INVOICES SHALL BE SUBMITTED MONTHLY IN
2003AA 1 Lot
MATERIAL: ODC NBVC PT. HUENEME CM
FFP
2003AB 1 Lot
NAVAL BASE VENTURA COUNTY PT. HUENEME CM
FFP
2003AC 1 Lot
NAVAL BASE PT. MUGU CM
FFP
PWS
PERFORMANCE WORK STATEMENT (PWS)
PREVENTIVE/CORRECTIVE MAINTENANCE OF GALLEY EQUIPMENT
IN SUPPORT OF
COMMANDER NAVY REGION SOUTHWEST (CNRSW)
1. GENERAL: This is a non-personal services contract to provide Preventive Maintenance (PM) and Corrective Maintenance (CM) to Government Owned Galley Equipment located at Naval Base Ventura County Galleys at Port Hueneme, Point Mugu and San Nicolas Island. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1 Description of Services: The Contractor shall provide qualified personnel, equipment, supplies, tools, materials, supervision, and other items and non-personal services necessary to perform Preventive Maintenance (PM) and Corrective Maintenance (CM) to Government Owned Galley Equipment as defined in this Performance Work Statement except for those items specified as government furnished property and services. The Contractor shall perform to the standards in this contract.
1.2 Background: Galley equipment located in Port Hueneme, Point Mugu and San Nicolas Island Naval Bases require preventive maintenance to keep them in good working order for military personnel use. The equipment also requires corrective maintenance when unscheduled repair is needed due to breakage or malfunction as they occur, or as detected (to occur) during PM performance. CNRSW does not have organic capability to provide services, and therefore, contractual support is necessary.
1.3 Objectives: The general objective of the contract is to maintain galley equipment within manufacturer and Government specifications by having a scheduled preventive maintenance (PM), and the performance of corrective maintenance (CM). PM schedule shall also be used in identifying potential problems and rendering CM before the equipment becomes inoperable. CM will also be used for inoperable equipment deemed not beyond economical repair (BER) by the Contracting Officer Representative (COR).
1.4 Scope: The Contractor shall provide PM and CM to Government Owned Galley Equipment located at Naval Base Ventura County Galleys at Port Hueneme, Point Mugu and San Nicolas Island as listed in Attachments 1 through 3 to ensure equipment are in good working order when needed.
1.5 Period of Performance: The period of performance shall be for one (1) Base Year of 12 months and two (2) 12-month option years. The Period of Performance reads as follows:
BEGIN DATE END DATE
BASIC 01 SEP 2018 30 AUG 2019
OPTION YEAR 1 01 SEP 2019 30 AUG 2020
OPTION YEAR 2 01 SEP 2020 30 AUG 2021
1.6 General Information
1.6.1 Quality Control: The Contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor’s quality control program is the means by which he assures himself that his work complies with the requirement of the contract.
1.6.2 Quality Assurance: The government shall evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on ensuring that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.6.3 Recognized Holidays: No Preventive Maintenance (PM) will be scheduled or performed by Contractor during following Holidays:
New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day
Independence Day Christmas Day
1.6.4 Hours of Operation: The Contractor may schedule PM/CM services between the hours of 7 am through 4 pm PST Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.
1.6.5 Place of Performance: The work to be performed under this contract will be performed at Naval Base Ventura County galleys at Port Hueneme, Point Mugu and San Nicolas Island.
1.6.6 Type of Contract: The government will award a combination of a Firm Fixed Price (FFP) and Time & Materials (T&M) contract for PM and CM services respectively.
1.6.7 Security Requirements: UNCLASSIFIED
1.6.7.1 Base Access: The Contractor shall maintain proper security protocol in accordance with all base regulations.
Security approval for all Contractor personnel will be obtained through base security office. Identifications furnished for approved employees shall be returned to the COR by the Contractor immediately when such employees are no longer employed under this contract. The Contractor is responsible for ensuring that all Contractor personnel obtain the proper identification for base access through the Defense Biometric Identification System (DBIDS) credentialing process. The government will not provide escorts to Contractor personnel for base access.
1.6.8 Special Qualifications: The Contractor is responsible for ensuring all employees possess and maintain current California Refrigeration License, Rational Training Certificate (Combination Ovens) and Kitchen Equipment Maintenance and Repair Certification during the execution of this contract.
1.6.9 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the contracting officer will apprise the Contractor of how the government views the Contractor's performance and the Contractor will apprise the Government of problems, if any, being experienced.
Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.
1.6.10 Contracting Officer Representative (COR): The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: ensure that the Contractor performs the technical requirements of the contract;
perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, specifications; monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. An appointment letter issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting contract.
1.6.11 Alternate Contracting Officer Representative (ACOR) Alternate Contracting Officer Representative (ACOR) may be identified and appointed to perform duties in the absence of the COR. ACOR will perform the same functions as the COR and will be designated in writing by the Contracting Officer.
1.6.12 Technical Assistant (TA). Technical Assistants (TA) are assigned on-site to provide technical assistance and support to the COR in the administration of the contract. TA may assist the COR in executing assigned inspection and monitoring duties. However, TAs may not provide any technical direction or clarification directly to the Contractor. TA is not authorized to take any action, either directly or indirectly, that could result in a change in the cost/price, quantity, quality, place of performance, delivery schedule, or any other terms or conditions of the contract.
1.6.13 Point of Contact for each location:
PORT HUENEME
32ND Street, Building 61 Port Hueneme, CA 93043 POC: CS1 Jorge Mangrobang E-mail: Jorge.g.mangrobang@navy.mil Telephone: 805-982-4739
POINT MUGU
311 Main Rd, Bldg. 20 Point Mugu, CA 93041 POC: CS2 Eric Bribiesca E-mail:eric.f.bribiesca@navy.mil Telephone: 805-989-7741
SAN NICOLAS ISLAND
521 9th Street, Bldg. 65, SNI Galley Point Mugu, NAWC, CA 93042 POC: CS2 Francisco Tapia E-mail: francisco.tapia@navy.mil Telephone: 805-989-2369/2358
1.6.14 Key Personnel: None
1.6.14 Other Direct Costs. This category includes travel cost as result of providing CM services from Contractor facility to Government facility and back.
2. DEFINITIONS AND ACRONYMS:
2.1. DEFINITIONS:
2.1.1. BER EQUIPMENT. Beyond-economic-repair-equipment - inoperable equipment for which repair cost is estimated to exceed acquisition cost by 25% or more.
2.1.2. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2.1.3. CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.4. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.5. CORRECTIVE MAINTENANCE (CM). Unscheduled repair required to restore equipment to operational condition within manufacturer predetermined tolerances and limitations. CM evolves from equipment failure or indications of equipment degradation. CM includes, but not limited to adjustment, alignment, and/or replacement of malfunctioning part or component.
mailto:Jorge.g.mangrobang@navy.mil
2.1.6. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.7. DELIVERABLE. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
2.1.8. EMERGENCY SITUATION. Equipment malfunction that may cause complete shutdown of galley operation.
2.1.9. MAINTENANCE. Set of actions taken to ensure that equipment perform their intended function when required.
2.1.10 PERIODICITY. Frequency of performance of Manufacturer prescribed maintenance service for the specific equipment; expressed in Monthly (M), Quarterly (Q), Annually (A), and Every Other Month (EOM).
2.1.11. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.
2.1.12. PREVENTIVE MAINTENANCE (PM). Scheduled maintenance performed on equipment to keep it in good working condition and operating within manufacturer predetermined tolerances and limitations. PM may include inspection, cleaning, lubricating, calibrating, adjusting or replacing “Bench Stock” – i.e. nuts, bolts, screws, electrical fittings, refrigerant gases, solder and/or flux, oil grease, cleaning supplies.
2.1.13. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.14. QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of Contractor performance.
2.1.15. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.16. SUBCONTRACTOR. One that enters into a contract with a prime Contractor. The Government does not have privity of contract with the Subcontractor.
2.1.17. WORK DAY. Monday through Friday except Holidays;
2.1.18. WORK WEEK. Monday through Friday, unless specified otherwise.
2.2. ACRONYMS:
ACOR Alternate Contracting Officer's Representative BER Beyond Economical Repair CM Corrective Maintenance COR Contracting Officer Representative DFARS Defense Federal Acquisition Regulation Supplement DOD Department of Defense FAR Federal Acquisition Regulation KO Contracting Officer NLT No-Later -Than ODC Other Direct Costs PM Preventive Maintenance POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance
QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Plan TA Technical Assistant TE Technical Exhibit
3. GOVERNMENT FURNISHED ITEMS AND SERVICES:
3.1. Services: NONE
3.2 Facilities: PM and CM services shall be performed at Government facilities where equipment are located.
3.3 Utilities: The Government will provide basic utilities to include electrical power and water for tools needed for contract performance. The Contractor shall instruct employees in utilities conservation practices. The Contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish PM or CM maintenance.
3.4 Equipment: NONE
3.5 Materials: NONE
4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
4.1 General: The Contractor shall furnish all supplies, equipment, and services required to perform work under this contract that are not listed under Section 3 of this PWS.
4.2 Materials. The Contractor shall furnish materials, supplies, and equipment necessary to meet the requirements under this PWS.
4.3 The Contractor is required to notify PCO when 75% of the ceiling contract cost is reached during the contract period of performance.
5. SPECIFIC TASKS:
5.1 Contractor Contract Acceptance.
5.1.1 Initial Inspection of Equipment. The Contractor shall perform the initial inspection of all equipment at each galley location listed in Attachments 1 through 3 within 30 days after contract award date. The inspection result shall be submitted to the COR in the form of Equipment Status Report – Initial described as follows:
5.1.1.1 Equipment Status Report. The Contractor shall provide results of the equipment evaluation/analysis in the form of a report to the Contracting Officer’s Representative (COR) within 5 days after the initial inspection period.
The report shall identify the equipment by location (galley), serial, and model number, operable or not operable, required parts and labor, if necessary, to restore equipment to working condition as specified in the manufacturer’s manual.
5.1.1.2 Government Action. The COR will provide a written response within 15 days from receipt of the report. The Government reserves the right to determine if replacement or recommended repairs will be accomplished.
Equipment determined to be beyond economical repair (BER) will be deleted from Attachments 1 through 3 and shall not be included in the PM schedule. Government reserves the right to replace the equipment (with similar function/capacity equipment) removed from list as result of contract acceptance inspection result during the life of the contract at no additional cost. Repair of equipment determined eligible for repair shall be accomplished in accordance with the requirements set forth in the manufacturer manual.
5.1.1.3 PM Schedule. The Contractor shall submit to the COR a written PM schedule for all the equipment listed in Attachments 1 through 3 within thirty (30) days after contract award. The schedule shall address following:
equipment location, description, manufacturer, model name/#, quantity, periodicity, and PM schedule date.
5.1.1.4 Addition and deletion of equipment during POP. There will be no change in the Firm Fixed Price portion of the contract during POP for as long as the change is within plus or minus five percent (i.e. ± 5%) of the total number of pieces of equipment in specific galley recorded at the time of contract award. Government replacement of equipment will be performed one for one of similar form, fit, and function – e.g. remove one oven, add one oven of similar size and capacity with the one removed. Additional equipment may be added to increase productivity as long as the addition is within five percent of the total number of galley equipment.
5.2 Basic Services. The Contractor shall provide fully qualified and accredited technicians to provide PM and CM services as required in this PWS. PM is performed as scheduled, while CM may be performed during PM performance, it may also be performed during separate visit as requested by the COR. PM and CM shall be performed with the main objective of having ALL equipment to be in operational status when needed.
5.2.1 Preventive Maintenance (PM). PM shall be performed as scheduled for each piece of equipment listed in Attachments 1 through 3 in accordance with prescribed government manuals/instructions/ directives and individual equipment manufacturer manuals to keep them in good working order.
5.2.1.1 PM Frequency. PM Schedule as shown in Table 1 below:
Table 1 - PREVENTIVE MAINTENANCE (PM) SCHEDULE
Equipment Type Periodicity (Frequency)
Convection Ovens Monthly, Quarterly
Combi Ovens Monthly, Quarterly
Fryers Monthly, Quarterly
Steam Kettles Quarterly, Annually*
Electric Kettles Monthly, Annually
Tilt, Skillet Monthly, Quarterly
Mixer Quarterly
Soup Wells Quarterly
Heat Lamps Quarterly
Dish machines (except Leased Machines) Monthly, Quarterly
Cook and Hold (warming Cabinet) Monthly Quarterly
Disposal Quarterly
Slicer Quarterly
Griddles Monthly, Quarterly
Range's Monthly, Quarterly
Grills Monthly, Quarterly
Ice Machines/Ice dispensers Monthly
Reach in Coolers Every other month
Reach in Freezers Every other month
Milk Coolers Every other month
Cold rails (including Salad Bars) Every other month
Notes:
1. Equipment calibration will be performed during the PM schedule.
2. For steam kettles, in addition to the scheduled PM, hydrostatic testing will be performed once a year.
3. Attachments 1 thru 3 show periodicity abbreviations as follows:
M – MONTHLY; EOM – EVERY OTHER MONTH; Q – QUARTERLY; A - ANNUALLY
5.2.1.2 Equipment Operating and Maintenance Parameters. PM shall be conducted to maintain equipment operating in accordance with NAVMED P-5010-1, Tri-Service Food Code and Food Service Management NAVSUP P-486 operating parameters. Strict compliance with these guidelines is mandatory to avoid the transmission of disease producing microorganisms, infectious disease, and growth of harmful bacteria or development of toxins formed by bacteria. As such, the Contractor shall ensure that equipment being serviced during PM are set at Table 2 and 3 (below) temperature operation parameters.
Table 2 – Operating Temperatures of Refrigerated Equipment Refrigerated Equipment Operating Temperatures
Freezers 0˚ or below Dairy Box 32˚ 34˚ F Chilled Bulk Storage Refrigerators 32˚ 38˚ F Thaw Box—Refrigerators 36˚ 38˚ F Reach– in Refrigerator 32˚ 41˚ F Refrigerated Display Cabinets 32˚ 41˚ F Milk Dispensers 32˚ 41˚ F
Table 3 – Dishwashing Equipment
Equipment Nomenclature Wash Rinse Final Rinse Dish Washing Machine 150˚ - 160˚ F 160˚ - 180˚ F 180˚ - 194˚ F Pots and Pans Washing Machine 150˚ - 160˚ F N/A 180˚ - 194˚ F
5.2.2 Corrective Maintenance (CM). CM is repair service required to restore equipment to its good working condition and operating within Government and Manufacturer predetermined tolerances and limitations. The Government predetermined equipment tolerances and limitations supersede the Manufacturer. Services shall be completed within three (3) working days, unless, as determined by COR, is not feasible due to event or situation beyond the control of the Contractor. In such a case, Contractor shall provide a reasonable target date of completion for COR approval. If in the COR opinion that provided target date will create emergency situation (see definition), and the Contractor refused to change proposed target date to an earlier date COR deemed necessary to prevent emergency situation, the Government reserves the right to enter into a contract with another Contractor to complete the CM. CM performance shall be performed on equipment when triggered by one of the following:
5.2.2.1 Routine COR request. Contractor shall provide a written cost estimate for all repairs within 2 business days from the date request is submitted by COR. The cost estimate shall include equipment description, number of hours required to effect the repair and the associated labor cost, replacement parts name and cost, and the grand total cost of the CM. CM shall be performed no more than three (3) working days from date cost estimate is approved by the COR. All cost estimates for CM or repairs must be approved by the COR. Communication will be by Email for routine requests.
5.2.2.2 CM requirement identified during PM. When CM requirement is identified on an equipment undergoing PM service, CM shall be performed by the Contractor to the equipment as long as: (a) it can be performed during normal working hours (see section 1.6.4), and (b) can be accomplished without deviating from the original scheduled equipment PM (i.e. all equipment originally scheduled are serviced). When CM cannot be completed during the PM day for whatever reason, additional time for a separate visit maybe communicated to the COR for approval.
Otherwise, the CM may be continued during the next scheduled PM day (where the equipment is located). COR approval is not required when required CM is discovered during performance of scheduled PM and ONLY when there is no associated additional cost to the Government. All other CM requiring parts and/or labor cost must be approved by the COR.
5.2.2.3 Emergency COR request. Under emergency situation, CM shall be performed within one (1) working day (24 hours) from date request is communicated by the COR and received by the Contractor. Cost estimate as described in 5.2.2.1 above may be performed via phone conversation between COR and Contractor, but confirmed and approved via Email before CM performance.
5.2.2.4 The Contractor shall provide a CM report of performed CM services to the COR within 2 business days following CM of inoperable or malfunctioning equipment. A CM equipment log will be utilized and maintained by the Contractor to record all services rendered.
5.2.3 Parts. The Contractor shall acquire brand new OEM only parts needed to complete performance of CM using the most economic means to ensure equipment is repaired with minimal downtime. Re-conditioned or re-furbished components or parts may be used if can be shown that use of such component or part is customary commercial practice - subject to COR approval. Fair and reasonable pricing shall be demonstrated to the COR by showing that price is within plus or minus 5% of Commercial item pricing. Proof of Commercial item pricing can be from:
Internet sources to include manufacturer, distributor and other reseller website, or any other sources where price is shown to Government buyers and/or the general public; manufacturer pricing schedule. All procurement of replacement parts must be approved by the COR.
5.2.4 Reports and Deliverables. The Contractor shall provide written documentation of any performed PM and CM service in a written report to the COR within 2 business days following performance. A repair equipment log will be utilized and maintained by the Contractor to indicate all services rendered. See Technical Exhibit 2.
6. APPLICABLE PUBLICATIONS. Government will have available at each galley the Original Equipment Manufacturer (OEM) Manuals, NAVMED P-5010-1 Tri-Service Food Code, and NAVSUP P-486, Food Service Management.
6.1. The Contractor must abide by, but not limited to: NAVSUP P-486, Food Service Management; and NAVMED P-5010-1. (The NAVMED instruction may be found on website http://navalmedicine.med.navy.mil.) Specific instructions as follows:
6.1.2 DISHWASHING AND POTS AND PANS MACHINES: Must operate IAW NAVMED P-5010-1, Tri- Service Food Code.
6.1.3 MANUAL DISHWASHING: (Backup equipment) IAW NAVMED P-5010-1.
6.1.4 REFRIGERATED STORAGE EQUIPMENT, REFRIGERATED DISPLAY CABINETS, AND MILK
DISPENSERS: Maintain temperatures IAW NAVMED P-5010-1.
6.1.5 BULK AND ICE DISPENSING MACHINES: Monthly cleaning at a minimum shall be accomplished IAW
NAVMED P-5010-1.
NOTE: THERE IS A POSSIBILITY THAT SAN NICOLAS ISLAND GALLEY MAY CLOSE AT SOME POINT
DURING THE DURATION OF THIS CONTRACT. THE CONTRACTOR WILL BE NOTIFIED BY THE
CONTRACTING OFFICER WITHIN 5 BUSINESS DAYS OF THE GOVERNMENT FINAL DECISION. THE
NOTIFICATION WILL ALLOW AT LEAST 30 CALENDAY DAYS FORM THE DATE THE CLOSURE
NOTICE IS PROVIDED TO COMPLETE THE SERVICES SHOULD THISOCCUR. THE GOVERNMENT
WILL PROVIDE A TIMELY BILATERAL MODIFICATION FOR PARTIAL TERMINATION - - OR – THE
OPTION YEAR WILL NOT BE EXERCISED, WHICHEVER IS CONSIDERED MOST COST EFFECTIVE
WHEN COMPARED TO THE ACTUAL CLOSING DATE. THE PARTIAL TERMINATION WILL DISSOLVE
ALL CONTRACTOR RESPONSIBILITY FOR PERFORMANCE AND WILL BE PAID FOR THE WORK
INCURRED UP UNTIL THE MODIFIED TERMINATION DATE.
Attachment/Technical Exhibit List:
7.1. Technical Exhibit 1 – Performance Requirements Summary
7.2. Technical Exhibit 2 – Deliverables Schedule
7.3. Attachment 1 List of Equipment for Port Hueneme
7.4. Attachment 2 List of Equipment for Point Mugu
7.5. Attachment 3 List of Equipment for San Nicolas Island
TECHNICAL EXHIBIT 1
Performance Requirements Summary
The Contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Performance Objective PWS Performance Threshold Method of Surveillance
1. Equipment status 5.2 95% Operational Monthly Inspection by TA or COR
2. Preventive Maintenance 5.2.1 PM performance on 100% of the equipment * Monthly Inspection by TA or COR
3. Corrective Maintenance 5.2.2 95% of equipment is repaired within 3 working days**
100% Inspection by TA or COR when completed
4. Response Time for Emergency COR request (i.e.
After Normal Working Hours and Weekends)
5.2.2.2 95% Within 24 Hours of Notification by TA or COR
100% Inspection by TA or
COR
5. Deliverable reports 5.2.4 100% on time submission IAW Due Dates listed in TE-2
100% Inspection by COR
*Situations that are beyond the control of the Contractor that prevent PM performance to an equipment will not count against the 100% requirement (e.g. un-scheduled base closure, acts of nature, etc.).
**Delay caused by parts availability will not count against the Contractor provided the situation is communicated to the COR the day of the knowledge of the situation, and the COR is also provided the target of CM completion.
TECHNICAL EXHIBIT 2
Schedule of Deliverables
Deliverable Frequency # of Copies Medium/Format Submit To Quality Control Plan
(QCP)
PWS 1.6.1
Submit with proposal package on or before Solicitation Close date
1 Original MS Word or MS Excel Spreadsheet
KO
Equipment Status Report –
PWS 5.1.1.1
NLT 35 Days After Contract award
1 Original and 1 Copy
MS Word or MS
COR with copy to
PM Schedule -
PWS 5.1.1.3
30 Days After Contract Award
1 Original and 1 Copy
MS Word or MS
COR with copy to
CM Cost Estimate
PWS 5.2.2.1/5.2.2.2
Within 2 business days upon receipt of routine CM request from COR
1 Original Email COR
CM Cost Estimate
PWS 5.2.2.3
Within 24 hours upon receipt of emergency CM request from COR
1 Original Email COR
CM Report/Log
PWS 5.2.2.4
2 Working Days After CM performance
1 Original MS Word or MS
COR
CLAUSES INCORPORATED BY REFERENCE
52.203-3 Gratuities APR 1984 52.204-16 Commercial and Government Entity Code Reporting JUL 2016 52.204-21 Basic Safeguarding of Covered Contractor Information
Systems
JUN 2016
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations
NOV 2015
52.212-3 Alt I Offeror Representations and Certifications--Commercial Items (NOV 2017) Alternate I
OCT 2014
52.212-4 Contract Terms and Conditions--Commercial Items JAN 2017 52.216-31 Time-and-Materials/Labor-Hour Proposal Requirements--
Commercial Item Acquisition
FEB 2007
52.219-9 Alt I Small Business Subcontracting Plan (JAN 2017) Alternate I NOV 2016 52.222-54 Employment Eligibility Verification OCT 2015 52.222-62 Paid Sick Leave Under Executive Order 13706 JAN 2017 52.232-7 Payments Under Time-And-Materials And Labor Hour
Contracts
AUG 2012
52.232-40 Providing Accelerated Payments to Small Business Subcontractors
DEC 2013
52.233-3 Protest After Award AUG 1996
52.245-1 Government Property JAN 2017 252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7003 Agency Office of the Inspector General DEC 2012 252.203-7005 Representation Relating to Compensation of Former DoD
Officials
NOV 2011
252.204-7004 Alt A System for Award Management Alternate A FEB 2014 252.204-7005 Oral Attestation of Security Responsibilities NOV 2001 252.204-7008 Compliance With Safeguarding Covered Defense Information
Controls
OCT 2016
252.204-7009 Limitations on the Use or Disclosure of Third-Party Contractor Reported Cyber Incident Information
OCT 2016
252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting
OCT 2016
252.209-7004 Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism
OCT 2015
252.209-7999 (Dev) Representation by Corporations Regarding an Unpaid Delinquent Tax Liability or a Felony Conviction under any Federal Law (Deviation)
JAN 2012
252.219-7003 Small Business Subcontracting Plan (DOD Contracts) APR 2018 252.222-7007 Representation Regarding Combating Trafficking in Persons JAN 2015 252.225-7000 Buy American--Balance Of Payments Program Certificate--
Basic (Nov 2014)
NOV 2014
252.232-7003 Electronic Submission of Payment Requests and Receiving Reports
JUN 2012
252.232-7010 Levies on Contract Payments DEC 2006 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.243-7002 Requests for Equitable Adjustment DEC 2012 252.244-7000 Subcontracts for Commercial Items JUN 2013
CLAUSES INCORPORATED BY FULL TEXT
52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (JUL 2016)
(a) Definition. As used in this clause--
Commercial and Government Entity (CAGE) code means--
(1) An identifier assigned to entities located in the United States or its outlying areas by the Defense Logistics Agency (DLA) Commercial and Government Entity (CAGE) Branch to identify a commercial or government entity;
or
(2) An identifier assigned by a member of the North Atlantic Treaty Organization (NATO) or by the NATO Support and Procurement Agency (NSPA) to entities located outside the United States and its outlying areas that the DLA Commercial and Government Entity (CAGE) Branch records and maintains in the CAGE master file. This type of code is known as a NATO CAGE (NCAGE) code.
(b) Contractors shall ensure that the CAGE code is maintained throughout the life of the contract. For contractors registered in the System for Award Management (SAM), the DLA Commercial and Government Entity (CAGE) Branch shall only modify data received from SAM in the CAGE master file if the contractor initiates those changes via update of its SAM registration. Contractors undergoing a novation or change-of-name agreement shall notify the contracting officer in accordance with subpart 42.12. The contractor shall communicate any change to the CAGE code to the contracting officer within 30 days after the change, so that a modification can be issued to update the CAGE code on the contract.
(c) Contractors located in the United States or its outlying areas that are not registered in SAM shall submit written change requests to the DLA Commercial and Government Entity (CAGE) Branch. Requests for changes shall be provided at https://cage.dla.mil. Change requests to the CAGE master file are accepted from the entity identified by the code.
(d) Contractors located outside the United States and its outlying areas that are not registered in SAM shall contact the appropriate National Codification Bureau (points of contact available at http://www.nato.int/structur/AC/135/main/links/contacts.htm) or NSPA at https://eportal.nspa.nato.int/AC135Public/scage/CageList.aspx to request CAGE changes.
(e) Additional guidance for maintaining CAGE codes is available at https://cage.dla.mil.
(End of Clause)
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR
EXECUTIVE ORDERS--COMMERCIAL ITEMS (JAN 2018)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L.
113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).
(3) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(4) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)
XX (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).
XX (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509).
XX (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (June 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
XX (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2016) (Pub. L. 109-
282) (31 U.S.C. 6101 note).
https://cage.dla.mil/ http://www.nato.int/structur/AC/135/main/links/contacts.htm https://eportal.nspa.nato.int/AC135Public/scage/CageList.aspx https://cage.dla.mil/
___ (5) [Reserved]
XX (6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).
___ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) (Pub.
L. 111-117, section 743 of Div. C).
XX (8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Oct 2015) (31 U.S.C. 6101 note).
____ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (July 2013) (41 U.S.C. 2313).
____ (10) [Reserved]
____ (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (NOV 2011) (15 U.S.C. 657a).
____ (ii) Alternate I (NOV 2011) of 52.219-3.
____ (12) (i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2014) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
____ (ii) Alternate I (JAN 2011) of 52.219-4.
____ (13) [Reserved]
____ (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2011) (15 U.S.C. 644).
____ (ii) Alternate I (NOV 2011).
____ (iii) Alternate II (NOV 2011).
____ (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).
____ (ii) Alternate I (Oct 1995) of 52.219-7.
____ (iii) Alternate II (Mar 2004) of 52.219-7.
____ (16) 52.219-8, Utilization of Small Business Concerns (Nov 2016) (15 U.S.C. 637(d)(2) and (3)).
____ (17)(i) 52.219-9, Small Business Subcontracting Plan (Jan 2017) (15 U.S.C. 637(d)(4)).
____ (ii) Alternate I (Nov 2016) of 52.219-9.
____ (iii) Alternate II (Nov 2016) of 52.219-9.
____ (iv) Alternate III (Nov 2016) of 52.219-9.
____ (v) Alternate IV (Nov 2016) of 52.219-9.
____ (18) 52.219-13, Notice of Set-Aside of Orders (NOV 2011) (15 U.S.C. 644(r)).
____ (19) 52.219-14, Limitations on Subcontracting (JAN 2017) (15 U.S.C. 637(a)(14)).
____ (20) 52.219-16, Liquidated Damages—Subcon-tracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)).
____ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (NOV 2011) (15 U.S.C.
657f).
____ (22) 52.219-28, Post Award Small Business Program Rerepresentation (July 2013) (15 U.S.C. 632(a)(2)).
____ (23) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women- Owned Small Business Concerns (Dec 2015) (15 U.S.C. 637(m)).
____(24) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.