STATEMENT OF WORK FOR
USS AMERICA LHA-6
CORROSION TREATMENT FOR (16) RAYMOND FORKLIFT AND (32) 16.25 X 11.25
REAR TIRES
SOLICITATION NO. N0244-18-Q-0216
1.0 INTRODUCTION
The Naval Supply Systems Command (NAVSUP), San Diego Contracting Division, USS America LHA -6 requires for Corrosion Treatment, Painting of Forklift and Replacement of (32)16.25x11.25 rear tires on (16) 4.5 Raymond
Forklift 4.5K EE with model number 040-R45TN. Dimension is 86' x 68' x 42' (L/H/W).
2.0 BACKGROUND
The USS America LHA -6 has a requirement to perform Corrosion Treatment for (16) 4.5 Raymond Forklift and
(32) 16.25 x 11.25 rear tires. In order to meet this requirement, the purchase of Corrosion Treatment for (16) 4.5
Raymond Forklift and (32) 16.25 x 11.25 rear tires is necessary.
3.0 GENERAL/PERFORMANCE REQUIREMENTS
The Contractor will perform the surface preparation of SP-2/3 on Exterior Components only that includes pressure wash all the forklift, removing all the decals, sand, preserve and prime as needed all exterior surfaces of the forklifts that are accessible without disassembly. After the preparation they will paint all the forklift and re-install new decals. They will also remove the old tire and re-install the new tires onto the forklift.
4.0 PERIOD OF PERFORMANCE:
August 6, 2018 - September 21, 2018
5.0 DELIVERABLE:
The Contractor will deliver all forklift brand new paint and replaced all tires to North Island Coronado Building 310.