DRAFT STATEMENT OF WORK- MFSD DISHWASHER INSTALL AND REMOVAL.docx

DOCX document 23 KB Posted

Attached to
Request for Information- United States Naval Academy Commercial Galley Conveyor/Flight Dishwashers
Solicitation number
N0018927USNA
Issued by

About this file

This is a Draft Statement of Work for the removal and installation of four commercial dishwashers at the United States Naval Academy Midshipmen Food Service Division in Annapolis, Maryland, located at King Hall, 101 Buchanan Rd.

The contractor shall procure, remove, and install four Champion EUCCW8 PRO (or equivalent) flight-type conveyor dishwashers, each measuring 29 inches wide with a 22-foot load section. The equipment specifications include HMI/PLC technology with a 7-inch smart touchscreen controller, automated clean/delime functions, dual rinse features, steam coil tank heat with thermostat, steam booster heater with 70-degree Fahrenheit maximum rise, and a 4-foot steam blower-dryer. The scope of work encompasses equipment procurement with manufacturer documentation, safe disconnection and removal of four existing dishwashers, transportation and delivery during normal business hours (Monday through Friday, 7:00 AM to 3:30 PM), complete installation with all necessary plumbing, electrical, drainage, and utility connections compliant with applicable codes, testing and operational verification, staff training on proper use and maintenance, cleanup, and project closeout including delivery of manuals and warranty information. The contractor must comply with the installation environmental management system requirements, including water and energy conservation, waste minimization with preference for recycling, and use of less toxic materials where feasible. All contractor personnel must receive environmental management system awareness training. The period of performance shall include a proposed project schedule identifying initial site assessment, equipment approval, procurement lead time, delivery and removal schedule, installation, testing, commissioning, and final inspection. Work is unclassified and subject to Department of Defense security regulations with requirements to safeguard procurement-sensitive information and government work products.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Removal and Installation of Dishwashers

U. S. NAVAL ACADEMY

MIDSHIPMEN FOOD SERVICE DIVISION

ANNAPOLIS, MD

1.0 INTRODUCTION

The purpose of this Statement of Work (SOW) is to establish the requirements for the procurement, removal, replacement, and installation of four commercial dish machines at the United States Naval Academy. The contractor shall provide all equipment, labor, materials, transportation, tools, supervision, and services necessary to complete the project in accordance with the manufacturer's specifications, applicable codes, and Academy facility requirements.

2.0 BACKGROUND

The Contractor shall perform work under this contract consistent with the relevant environmental policy and objectives identified in the installation environmental management system (EMS) applicable for your contract. The Contractor shall perform work in a manner that conserves water, energy and other resources to the maximum extent feasible and ensure minimum production of waste as possible, giving preference to recycling and reutilization opportunities. Furthermore, the Contractor shall give preference to less toxic materials whenever available and still reliable for their work. In the event an environmental nonconformance or noncompliance of the USNA and MD environmental laws and regulations associated with the contracted services is identified, the contractor shall take corrective and/or preventative actions. In the case of a noncompliance, the Contractor shall respond and take corrective action immediately. In the case of a nonconformance, the Contractor shall respond and take corrective action based on the time schedule established by the EMS Coordinator. In addition, the Contractor shall ensure that their employees are aware of the environmental management system on base and how these requirements affect their work performed under this contract. All on-site contractor personnel shall receive the installation EMS awareness level information.

3.0 SCOPE OF WORK

The Contractor shall remove the current soiled tray handling system, dishwasher, disposal, trash and materials and assemble and install the following food service equipment for the King Hall, 101 Buchanan Rd, Annapolis, MD 21402. The Contractor will provide own equipment and supplies to perform the required work. The Contractor will ensure all safety practices are adhered to while performing the required work and maintenance on all the equipment. The Contractor will ensure all items are in full working order prior to completion of the job as well as train the King Hall staff on how to properly use, maintain, and clean all equipment, working materials, and its functions. The contractor shall furnish and install four (4) new commercial dish machines comparable to the equipment identified in the provided reference documentation. The scope shall include the following:

A. Equipment Procurement Supply four (4) new commercial dish machines.

Provide manufacturer, make, model, specifications, and equipment dimensions.

Provide equipment specifications, utility requirements, and installation documentation.

Ensure equipment is suitable for the intended food-service operations and existing facility infrastructure.

Identify applicable manufacturer warranties and service support.

B. Removal of Existing Equipment Coordinate removal activities with the designated USNA representative.

Safely disconnect all existing dish machines from applicable electrical, plumbing, water, drainage, and other utility connections.

Remove four (4) existing dish machines.

Provide all labor, tools, and equipment necessary for removal.

Transport and properly dispose of or recycle removed equipment in accordance with applicable requirements.

Protect surrounding floors, walls, utilities, and facility infrastructure during removal.

C. Delivery and Transportation Include all shipping, freight, transportation, and delivery costs.

Coordinate delivery dates and access requirements with USNA personnel.

Ensure equipment is properly packaged and protected during transportation.

Inspect equipment upon delivery for damage or missing components.

Coordinate equipment staging and placement.

D. Installation of New Equipment Install and position four (4) new dish machines in the designated locations.

Provide all labor, materials, hardware, fittings, and accessories required for installation.

Complete necessary plumbing, drainage, electrical, and utility connections, as applicable.

Ensure connections meet manufacturer requirements and applicable building, plumbing, electrical, and safety codes.

Verify that all machines are properly leveled, secured, and installed.

Coordinate any required facility modifications with the USNA representative before proceeding.

E. Testing and Operational Verification Perform manufacturer-recommended startup and commissioning procedures.

Test all four machines to verify proper operation.

Verify water supply, drainage, temperatures, chemical dispensing, and applicable sanitation functions.

Identify and correct installation deficiencies before project completion.

Provide operational demonstrations and basic equipment training to designated USNA personnel.

F. Cleanup and Project Closeout Remove all packaging, construction debris, and materials associated with the project.

Leave all work areas clean and safe.

Provide equipment manuals, maintenance documentation, warranty information, and manufacturer contact information.

Provide final confirmation that all four machines are operational and ready for use.

Supply Specifications (brand-name or equivalent):

Dishwasher, Flight Type Quantity: 4 Champion EUCCW8 PRO (or equivalent)

· (5‐8‐9, 22 ft.) CW PRO‐Series Upright Conveyor Dishwasher, 29" wide peg belt, HMI/PLC technology, 7" smart touchscreen controller with cOS 2.0 built‐in service diagnostics, active troubleshooting guide, preventative maintenance reminder with guidance, auto‐motorized drain valves, automated clean/de‐lime function, Dual Rinse feature, circuit breakers, automatic tank fill, vent fan control, electric eye idle pump shut‐off & rinse saver, stainless steel base & legs, push‐button start‐stop station ‐ load end, stainless steel front end enclosure panels, SST pumps & impellers, re‐circulating flushing nozzles ‐ load end, vent openings with 7" stainless steel stacks & locking dampers ‐ both ends, anti‐jam & reverse switch, cULus, NSF, ENERGY STAR®

· Champion FUEL SURCHARGE Fuel Surcharge (Temporary) – Global fuel volatility & supply chain constraints

· A‐2.5 ft. load section

· B‐2.5 ft. prewash section with external scrap tank with basket

· C‐8 ft. wash section

· D‐9 ft. dual rinse‐unload section

· Steam Coil tank heat w/ thermostat & positive low‐water cut‐off, Four tanks

· Steam Booster Heater, built‐in, 70°F maximum rise

· Steam Blower‐Dryer, 4 feet long

· Insulated hinged doors

· Stainless Steel Rear Enclosure Panels

· All‐purpose single pitch peg belt

· Stop/start stations on both ends of machine

· Custom SST single point duct to tie into existing drop at ceiling

4.0 PERIOD OF PERFORMANCE

The contractor shall provide a proposed project schedule identifying:

Initial site assessment, if required.

Equipment selection and specification approval.

Equipment procurement and estimated lead time.

Delivery and removal schedule.

Installation schedule.

Testing and commissioning.

Final inspection and project turnover.

All work shall be coordinated and scheduled to minimize disruption to Academy food-service operations.

5.0 HOURS OF OPERATION

All deliveries shall be made during normal business hours, Monday through Friday 7:00AM to 3:30PM.

6.0 DELIVERY ADDRESS

U.S. Naval Academy Midshipmen Food Service Division ATTN: 101 Buchanan Rd, Annapolis, MD 21402

7.0 SECURITY

Work under this task order is unclassified. The contractor shall comply with all applicable DOD security regulations and procedures during the performance of this task order. Contractor shall not disclose and must safeguard procurement sensitive information, computers systems and data, privacy act data, and government personnel work products, which are obtained or generated in the performance of this task order. The trustworthiness clause is applicable to this task order.

8.0 TECHNICAL POINT OF CONTACT

REDACTED

9.0 WAWF INSPECTION AND ACCEPTANCE (COR) POINT OF CONTACT

REDACTED

File details come from the government source that posted it. Updated .