Solicitation Amendment N0018926QL2720002 SF 30.pdf

PDF 573 KB Posted

Attached to
Monument Repairing and Painting
Solicitation number
N0018926QL272
Issued by

About this file

This is an Amendment of Solicitation (Standard Form 30, Amendment 0002) issued by Naval Supply Fleet Logistics Center Norfolk for solicitation N0018926QL272, dated 27 July 2026, with an effective date of 06 August 2026. The amendment extends the response due date from 06 August 2026 to 07 August 2026. The contracting officer is Courtney P. Dunlow, and the issuing activity is NAVSUP FLT LOG CTR NORFOLK, located at 1968 Gilbert Street, Suite 600, Norfolk, VA 23511-3392.

The solicitation concerns a Performance Work Statement (PWS) for refurbishment of the Polaris A3 missile monument located at 1430 Mitscher Avenue, Norfolk, VA 23551, onboard Naval Support Activity Hampton Roads. The work includes patching and smoothing holes, cleaning, and repainting the monument to return it to like-new condition using marine-grade primer and paints in flat black and flat white to match existing colors. The contractor must implement environmental protection, mask and tarp surrounding areas, scrape and remove damaged paint, prep surfaces, prime and repaint, and dispose of all construction debris. The period of performance is 6 months from contract approval. The contractor must obtain NSA HR unescorted access, requiring completion of a 5512/1 form and background check, with badge assistance available from the sponsor. The work requires lift equipment to access all surfaces, with parking for an equipment trailer and work vehicle to be coordinated. FAR clause 52.237-1 (Site Visit) was incorporated by reference.

View the file

Other files

File Type Posted
Solicitation Amendment N0018926QL2720003 SF 30.pdf PDF
Conformed Solicitation.pdf PDF
Polaris Missile Pictures.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Solicitation/Contract Form Continuation

The following changes have been made:

INFORMATION FROM TO

Response Due Date 06 Aug 2026 07 Aug 2026

N0018926QL2720002

Continuation of Description

Miscellaneous text in this section has been modified to:

A3 Polaris Missile monument refurbishment PWS

Refurbish the Polaris A3 missile monument in front of building NH-13 (COMSUBFOR headquarters). Location is 1430 Mitscher Ave., Norfolk, VA 23551, onboard Naval Support Activity Hampton Roads (NSA HR). Contractor requires NSA HR unescorted access to accomplish work. Sponsor can assist in obtaining a DBIDS badge if contractor completes 5512/1 form and passes background check.

Period of Performance is 6 months from contract approval.

Work includes patching and smoothing of all holes, cleaning and repainting. Monument should look new upon completion of work. Paint color will be same as is currently on the monument.

This project requires the use of a lift to access the entire surface. Parking for an equipment trailer and one work vehicle will be coordinated.

Contractor must implement environmental protection, collect and dispose of debris. Mask and tarp surrounding area to protect surfaces from paint debris and splatter. Scrape and remove damaged and peeling paint, clean and prep for repainting. Prime and repaint, with marine grade primer and paints, to carefully match the existing paint colors which are flat black and flat white. Clean up and dispose of all construction debris.

Addendum to Solicitation Provisions

Additional Information/Notes

The following clauses were added:

FAR Clauses Incorporated by Reference

Number Title Effective Date Alternate/ Deviation

Variation Effective Date

52.237-1 Site Visit. Apr 1984

IDCode: J
Page: 1
Pages: 4
AmendNo: 0002
EffDate: 06 Aug 2026
ReqNo: See Continuation Sheet
ProjNo:
IssCode: N00189
AdmCode:
IssuedBy: NAVSUP FLT LOG CTR NORFOLK

ATTENTION CODE 301, 1968 GILBERT STREET SUITE 600

NORFOLK, VA 23511-3392

UNITED STATES

Bridgette Walton, Email: bridgette.d.walton.civ@us.navy.mil Telephone: 757-653-6166 AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: N0018926QL272
SolDate: 27 Jul 2026
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: 1
OffrNoEx: Off
NoCopies: 1
ApprData: See Continuation
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: The purpose of this amendment is extend the closing due date to 7 August 2026.
ContNameTitle:
CoNameTitle: Courtney Dunlow
ContDate:
CODate: 06 Aug 2026

File details come from the government source that posted it. Updated .