QASP.docx
DOCX document 23 KB Posted
- Attached to
- Telecommunications support services
- Solicitation number
- N0018926QD192
About this file
This is a Quality Assurance Surveillance Plan (QASP) for Navy Telecommunications Support Services. The document establishes the Government's systematic method for monitoring contractor performance on BUPERS (BPM)/Navy Personnel Command (NPC) Telecommunications Services contracts and task orders. The QASP identifies four primary performance elements assessed through quarterly inspections and monthly reviews: Contractor Quality Control Plan compliance (100% compliance required), Contract Deliverables (>95% timely submission without rework), Overall Contract Performance (Satisfactory or higher annual rating), and Invoicing accuracy (100% accuracy required). Surveillance methods include random or planned sampling, periodic inspections, and validated customer complaints, with the Contracting Officer's Representative (COR) conducting inspections and issuing annual performance assessments.
Performance deficiencies are addressed through Contract Discrepancy Reports (CDRs) requiring written contractor responses within five days, with potential consequences including contract termination, loss of future Government contracts, and non-exercise of available options. Contractors are incentivized to maintain quality standards through the Government's right to require replacement or correction of non-compliant work at no additional cost. This QASP applies to the associated RFQ N0018926QD192 for Telecommunications Support Services, a firm-fixed-price commercial services acquisition set aside for women-owned small businesses, being procured by Naval Supply Systems Command on behalf of Navy Personnel Command with a solicitation closure date of August 26, 2026.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Past Performance Information Form.docx | DOCX document | |
| Solicitation Amendment - N0018926QD1920001.pdf | ||
| PreSolNotice_FNL.pdf | ||
| N0018926QD192_FNL.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN
Purpose: To ensure that the Government has an effective and systematic method of surveillance for the services in the PWS. The QASP will be used primarily as a tool to verify that the contractor is performing all services required by the PWS in a timely, accurate and complete fashion.
1. Critical performance processes and requirements. Critical to the performance of BUPERS (BPM)/Navy Personnel Command (NPC) Telecommunications Services is the timely, accurate and thorough completion of all contract/task order requirements.
2. Performance Standards
a. Schedule - The due dates for deliverables and the actual accomplishment of the schedule will be assessed against original due dates and milestones established for the contract or task order(s).
b. Deliverables – The deliverables required to be submitted will be assessed against the specifications for the deliverables detailed in the contract/task order(s) and the Quality Control Plan (QCP), if required by the contract, for the required content, quality, timeliness, and accuracy.
c. Past Performance - In addition to any schedule, deliverables, and cost aspects of performance discussed above, pursuant to FAR 42.15, the Government will assess the contractor’s record of conforming to contract requirements and to standards of good workmanship, the contractor’s adherence to contract schedules including the administrative aspects of performance, the contractor’s history of reasonable and cooperative behavior and commitment to customer satisfaction, and the contractor’s business-like concern for the interest of the customer.
3. Surveillance methods: The primary methods of surveillance used to monitor performance of this contract will include, but not be limited to, random or planned sampling, periodic or inspection, and validated customer complaints.
4. Performance Measurement: Performance will be measured in accordance with the following table:
| Performance Element |
| Performance Requirement |
| Surveillance Method |
| Frequency |
| Acceptable Quality Level |
| Contractor Quality Control Plan |
| QC activities, inspections, and corrective actions completed as required by the plan. |
| Inspection by the COR |
| Quarterly for overall QC activities; |
| 100% Compliance with the contractor plan. |
As Required for corrective actions.
(If required by the contract)
| Contract Deliverables |
| Contract deliverables furnished as prescribed in the PWS, attachments, CDRLs, Task Orders, etc., as applicable. |
| Inspection by the COR |
| 100% inspection of all contract deliverables. |
| >95% of deliverables submitted timely and without rework required. |
| Overall Contract Performance |
| Overall contract performance of sufficient quality to earn a Satisfactory (or higher) rating in the COR’s annual report on Contractor Performance |
| Assessment by the COR |
| Annual |
| All performance elements rated Satisfactory (or higher) |
| Invoicing |
| Monthly invoices per contract procedures are timely and accurate. |
| Review & acceptance of the invoice |
| Monthly |
| 100% accuracy |
If performance is within acceptable levels, it will be considered to be satisfactory. If not, overall performance may be considered unsatisfactory.
Incentives/Disincentives:
The COR’s makes an annual report on Contractor Performance (CPARS or other annual report). The contractor’s failure to achieve satisfactory performance under the contract/task order, reflected in the COR’s annual report, may result in termination of the contract/task order and may also result in the loss of future Government contracts/task orders. The contractor’s failure to achieve satisfactory performance under the contract/task order may result in the non-exercise of available options
For each item that does not meet acceptable levels, the Government may issue a Contract Discrepancy Report (CDR). CDRs will be forwarded to the Contracting Officer with a copy sent to the contractor. The contractor must reply in writing within 5 days of receipt identifying how future occurrences of the problem will be prevented. Based upon the contractor’s past performance and plan to solve the problem, the Contracting Officer will determine if any further action will be taken.
In accordance with the inspection of services provisions of the contract, the contractor will be incentivized to provide quality products in a timely manner since the Government can require the Contractor, at no additional cost, to replace or correct work that fails to meet contract requirements.
File details come from the government source that posted it. Updated .