Attachment I - Draft Performance Work Statement (Multibeam Training).pdf
PDF 160 KB Posted
- Attached to
- Multibeam Training
- Solicitation number
- N0018926MBT
About this file
This is a Performance Work Statement (PWS) for multibeam and LiDAR training services required by the Naval Information Warfare Training Group Gulfport (NIWTG-G), a component of the Naval Meteorology and Oceanography Command (NAVMETCOM).
The requirement is for contracted instructor services to deliver specialized training in hydrographic survey operations meeting International Hydrographic Organization (IHO) S-5B Standards of Competence for Category "B" Hydrographic Surveyors. Training must cover multibeam theory, installation, data collection and analysis; LiDAR fundamentals and operation; and practical field applications using government-furnished NORBIT multibeam and iLiDAR systems deployed on a vessel of opportunity and Otter unmanned surface vehicle (USV). Instructional topics encompass beam characteristics, transducer arrays, beam forming and steering, vessel motion effects, equipment installation and configuration, data collection procedures, quality control and calibration (including patch testing), and multibeam data analysis. Expected learning outcomes require students to install and calibrate systems, measure offsets, plan and conduct hydrographic surveys in Pass Christian Harbor, differentiate between detection modes, set up and operate swath sonar and LiDAR systems, identify configuration problems, tune acoustic parameters, and apply quality control procedures. The contractor must provide qualified instructor(s) capable of teaching to specified learning outcomes and IHO standards. The government will furnish the classroom, curriculum materials, utility boat with driver, NORBIT equipment, Otter USV, and mobilized survey vessel with fuel and logistical support. The course operates Monday through Friday, 0730 to 1600 Central Standard Time, with initial performance period from June 1, 2026 through July 31, 2026, in Pass Christian, Mississippi. This is an Indefinite Delivery, Indefinite Quantity (IDIQ) contract with a five-year base ordering period from June 1, 2026 through May 31, 2031. The work is unclassified, requires no classified information access, and all curriculum materials and collected data are approved for public release.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Request for Information (RFI) Multibeam Training.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement (PWS) Naval Information Warfare Training Group Gulfport (NIWTG-G)
Multibeam Training
The Naval Information Warfare Training Group Gulfport (NIWTG-G) has a requirement for training in hydrographic survey operations to include at a minimum LiDAR fundamentals, multibeam theory, installation, data collection and analyses; and LiDAR installation, data collection and analyses; to include practical application training (Survey Planning and Collection) and multibeam data analysis.
1.0 BACKGROUND:
The Naval Information Warfare Training Group Gulfport (NIWTG-G) manages an international hydrographic survey training program for NAVMETCOM. To successfully teach all the required subjects we require contracted services in the area of multibeam and LiDAR training. The international hydrographic survey training program requires on-site specialized training in multibeam theory, operation of the NORBIT MBES and NORBIT iLiDAR system and associated Otter unmanned surface vehicle (USV), survey planning and specifications, analysis and practical survey training which meets the requirements specified in the International Hydrographic Organization’s (IHO) S-5B Standards of Competence for Category “B” Hydrographic Surveyors. The course cannot be completed without these services.
2.0 SCOPE:
2.1 The training objectives are to teach the students theory and application of multibeam survey practices, reinforced with practical application during mobilization of a vessel of opportunity AND the Otter USV with the NORBIT MBES and NORBIT iLiDAR system and during the Comprehensive Final Field Project (CFFP), where students under supervision will plan and conduct a hydrographic survey IAW standards set forth by the IHO using the NORBIT MBES and NORBIT iLiDAR system with associated vessel of Opportunity and Otter USV. The contractor will train the students how to plan a survey, write a survey specification, and conduct a hydrographic survey using NAVOCEANO’s training vessel or other available vessel, NIWTGG’s associated survey equipment to include the NORBIT MBES and iLiDAR system AND Otter USV.
2.1.1 It is important to note that this work is unclassified and physical/logical access required.
All curriculum materials used in the scope of this training are APPROVED for public release.
All data collected and the associated derived products are APPROVED for public release.
2.2 Course topics covered shall include, but not be limited to the following:
2.2.1 Survey planning
i. Writing/reading a survey technical specification.
2.2.2 Otter USV
i. Functions
ii. Operation
iii. USV preparation
iv. USV Line planning
2.2.3 Swath Systems
i. Beam characteristics (B)
1. Multibeam Basic Principles
2. Evolution of Multibeam Transducers
3. Multibeam Echo Sounder System
ii. Transducer elements and arrays
iii. Beam forming and beam steering
1. Transmission Beam Forming
2. Side Lobes
3. Beam steering
4. Return Echo Beam Forming
iv. Backscatter and water column returns (B)
v. Principles and geometry of multibeam and interferometric (phase measurement) sonar systems
1. Interferometry (Phased Array)
2. Combined electronic beam forming and interferometric (phased array) method
3. Amplitude and phase bottom detection
4. Bottom detection techniques: amplitude vs. phase detection
5. Interferometry and Phase Differencing
6. Principles of Operation
7. Other corrections
vi. Multi-beam side-scan imagery
vii. Principals and Limitations of Attitude Sensors, Such as the GNSS, as used in Determining Motion Compensation
viii. Vessel Motion Effects on Coverage and Accuracy
1. Speed
2. Heave
3. Roll
4. Pitch
5. Heading
6. Yaw
7. Multibeam stabilization
ix. Range and angle uncertainty (I)
1. Dependence of Depth Coverage and Uncertainty
a. Bottom spatial coverage (I)
2. IHO standards for coverage and accuracy
a. Variations in beam spacing and footprint size
x. Equipment types/Mounting/Installation
1. Hull and pole mounting of transducers considering platform motion. Integration of components including time stamping, attitude compensation, sensor offsets and networking.
xi. Beam Characteristics
xii. Beam spacing
xiii. Signal parameters
xiv. Vessel roll, pitch, and yaw effects
xv. Beam footprint size
xvi. Beam forming methods
xvii. Electronic beam forming
xviii. Physical beam forming
xix. Installation and configuration (B)
xx. Backscatter and seabed classification
1. Backscatter Imagery
xxi. Data collection
1. Surface and water column sound speed monitoring
2. Sound speed
3. Seafloor influences
4. Gain, power, pulse length
5. Multibeam sonar characteristics effect on coverage and accuracy
6. Bandwidth
7. Beamwidth
8. Beam elevation angle
9. Ping Rate
10. Beam processing modes
11. Equidistant scanning modes
12. Quality control procedures
a. Environmental effects on coverage and accuracy
b. Background noise
c. Depth
d. Multibeam Calibration
e. Sensor Location and Alignment
f. Complexity of multibeam surveying
g. Multibeam Patch Test
i. Prior to the patch test
ii. Patch test sequence
iii. Timing bias calibration
iv. Roll bias calibration
v. Pitch bias calibration
vi. Heading bias calibration
vii. Outer-beam bias calibration
h. Targets vs. Contours
xxii. Sidescan Sonar 1.Data collection during SURVOPS
xxiii. LiDAR
1. Fundamentals of installation
2. System calibration
3. Data acquisition
4. Data analysis
5. Data display
xxiv. Bottom Classification using Multibeam Echosounder
2.3 Following are the expected learning outcomes based on the topics provided above:
2.3.1 Install, calibrate a NORBIT multibeam and LiDAR system on a vessel of opportunity and Otter USV. Conduct Patch test and calibration as required
2.3.2 Measure offsets and create vessel file
2.3.3. Plan and Conduct a hydrographic survey in the vicinity of Pass Christian Harbor Approaches (MS Sound) using vessel of opportunity.
2.3.4. Plan and Conduct a hydrographic survey in the vicinity of Pass Christian Harbor using Otter USV.
2.3.5 Define characteristics of beams in relation to transducer settings. Compare phase and interferometric systems with multi-beam systems
2.3.6. Describe characteristics of returns in the context of seabed type, angle of incidence and scatter from within the water column
2.3.7. Determine sounding density and object detection capability as functions of system parameters
2.3.8 Describe suitable mounting structure and location for transducers given operational constraints
2.3.9 Differentiate between error sources in phase and amplitude detection modes.
Identify sources of range and angle uncertainty depending on acoustic parameter configuration
2.3.10 Set up, deploy and operate a swath sonar system and iLiDar system (Vessel of Opportunity AND Otter USV)
2.3.11 Identify problems or artifacts in on-line data due to inappropriate configuration or changing environmental parameters
2.3.12 Tune acoustic parameters for optimum performance
2.3.13 Apply quality control procedures to data acquisition and on-line processing
2.3.14 Conduct Multibeam data analysis
2.4 Course materials
2.4.1 The contractor shall provide an instructor or instructors to accomplish the stated learning objectives sufficient to meet the expected learning outcomes stated above.
2.4.2 Government Furnished Property:
Utility boat and driver (vessel of opportunity) NORBIT MBES system NORBIT iLiDar system Otter USV Classroom Student books/curriculum or reference materials Suitable vessel, mobilized for hydrographic surveying;
including fuel, driver, and other logistical support as needed
2.5 Course Schedule
2.5.1 Mon- Fri; The course shall include instruction during normal business hours.
Normal business hours are 0730 to 1600 central standard time.
2.6 Period of Performance
2.6.1 Commence the morning of 01 June 2026 through the afternoon of 31 July 2026.
2.7 Place of Performance
2.7.1 Pass Christian Harbor in Pass Christian, MS 395
3.0 ORDERING PERIOD, TASK ORDER PERFORMANCE PERIOD, AND
WORKING HOURS:
This Indefinite Delivery, Indefinite Quantity (IDIQ) contract will have the following five-year ordering period:
Base Ordering Period: 01 June 2026 through 31 May 2031
3.1 Task Order Performance Period: The performance period will be established within each resultant task order.
4.0 PERFORMANCE REQUIREMENT SUMMARY
4.1.1 The contractor must provide an instructor or instructors capable of teaching the learning objectives outlined in this document to a level which satisfies the desired learning outcomes specified in para 2.3 and to the standards discussed in the IHO S-44 and S5B.
4.1.2 It is important to note that this work is unclassified and physical/logical access required. All curriculum materials used in the scope of this training are APPROVED for public release. All data collected and the associated derived products are APPROVED for public release.
4.1.3 Security Requirements.
The overall classification of this contract is Unclassified. Contractor does not require access to classification information in the performance of this contract.
The contractor does not require access to U.S. Government Information Technology (IT) systems. The contractor does not require access to any NAVOCEANO spaces. The contractor does not require the use or need of a CAC.
The data collected, produced, or derived during this training is Unclassified, approved for public release.
File details come from the government source that posted it. Updated .