This document is a set of Questions and Answers related to Solicitation N0018924Q0338 for Harpoon Warhead Wooden Crates. The key details are:
The solicitation is for 75 Harpoon Warhead Section Wooden Crates to be produced per drawing SC72B129000-1001 REV N. The crates require copper 8 preservation and Performance-Oriented Packaging (POP) certification in accordance with DOT regulations. Responses are due by 10 AM EST on July 2, 2024. The government intends to award a single Indefinite-Delivery, Indefinite-Quantity contract with Firm, Fixed-Price provisions. The NAICS code is 321920 with a 500 employee size standard. Responders must be registered in the SAM database. The solicitation will be extended by 1 day to allow for adjustments based on the Q&A.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers to Solicitation N0018924Q0338
1. Are the Harpoon Warhead Wooden Crates required to be built "Level A" (indicated by "Size: A" in the drawing file) or is "Level C" required. If it's a Level C build, there is a note (Packaging Note 24) to omit certain details of the drawing.
Level A per Note 23.
2. After crate completion, the top and removable side are klimp fastened then banded or banded only after warhead section is installed. If after installation of warhead than do we include banding in the box to be used after installation?
No … project does not require item numbers 8, 12, 17, 19-25 per SC72B129000-1001
REV N_HARPOON WHD WOODEN BOX DWG
3. Does the crate manufacturer supply items such as the humidity indicator, antistatic cushion, Barrier used around warhead, and dessicant?
See answer 2.
4. After construction of crate parts are they dipped in copper 8 preservative and let dry? Then are they primed inside and out with two coats of primer?
Copper 8 applied to crate exterior. At what point during assembly is to the company’s discretion.
5. Is there any way we can get an extension on this due date?
The solicitation will be extended by a day to allow any adjustments that may need to be made for the received questions.