This document outlines requirements for a federal contract to provide and install floating docks to support patrol boats. The contractor must supply materials and tools to install four custom 42-foot performance series floating docks at piers 38-39 on Joint Expeditionary Base Little Creek in Virginia Beach, Virginia by February 23, 2024. The docks must be capable of lifting and lowering 40-foot patrol boats weighing approximately 40,000 pounds off the water and accommodate two boats simultaneously. Related equipment including pontoons, gangways, hardware, and powerheads must also be provided. The Naval Supply Systems Command is the contracting agency.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Minimum Requirements
Maritime Expeditionary Security Group TWO
Floating Docks
1. Scope: Maritime Expeditionary Security Group TWO requires a qualified and responsible contractor who can provide the necessary supplies and installation of floating docks to support
40-foot Metal Shark Patrol Boat approximate weight of 40,000lb’s during the winter missions without recovering the boat from the water using the boat trailer.
2. Requirements: Contractor must provide materials/supplies and tools for installation of four
(4) floating docks at Desert Cove Piers 38-39 on board Joint Expeditionary Base Little Creek
Virginia Beach, Virginia. The requirement includes the shipment of the jet docks, complete project execution/installation and calibration of four (4) custom 42ft performance series aqua pads for the 40ft Metal Shark Patrol Boats to go along with the current existing models on site.
One (1) new dock shall be installed in slip and additional (3) in the secondary slip due to slip dimensions. Due to craft weight of 40,000lbs a custom buoyancy package shall be installed.
Additional requirements are inverting each side of KDS, 9 MA KDS pipe, 5 MA 8” and 10” outers with riser kits.
The floating dock must be a frame structure with ballast to lift and lower the 40-foot boat off the water. The floating dock is to be installed alongside previously purchased floating docks purchased from Jet Systems, Inc. The floating dock will be secure to the wood pylon on the pier in a manner that will rise and lower with the inlet water tides and allow for two 40ft boats to be lifted simultaneously. An operational test must be conducted prior to acceptance of the work.
Government personnel will provide crane support and forklift to move materials and stage near
Desert Cove piers 38-39.
Description Quantity
UNIVERSAL 42FT PERFORMANCE DOCK – 15’ WIDE X 46’8” – 251MA 4
CUBE – LARGE (BLACK) – TO MAKE DOCKS 18’4” WIDE 224
CUBE – LARGE (BLACK) – BOW LANES (7MA) FOR FEND OFF AND LATTERAL
GANGWAY LANDINGS (11MA + FLEX LANES)
CUBE – LARGE (BLACK) – FLEX LANES MODULES (9MA) – QTY 2 18
CUBE – LARGE (BLACK) – BOAT DOCK BOW BUOYANCE SUPPLEMENT – 12MA – 4
DOCKS
11MA – PGB – 7 – 48” PONTOON 8
11MA – SSB – 7 – 48” PONTOON 20
NS – PONTOON – 48” DIAMETER X 20’ LONG 8
PSAP – PONTOON STRAPS & HARDWARE (48”) 4
MI7 POWERHEAD – 110V – 30AMP 4
SEE KP – DBLE ARM ADAPTER SYSTEM – 4 ANCHR PNTS (PAINTED) 16
CUSTOM – 20” HOOP – (FOR 18” DIAMETER PILING OR LESS) 16
PONTOON – 36” DIAMETER X 20’ LONG- REMOVED FROM ABOVE 42’ DOCKS -8
PSAP – PONTOON STRAPS & HARDWARE – LIFTING EYES (36”) – REMOVED FROM
ABOVE 42’ DOCKS
-4
PREMIUM 6 STEP W/HANDRAIL & MNTG HDWR – 67”L x 24”W x 48”H 4
NS – GANGWAY – ALUMINUM (30’ LONG x 36” WIDE) – SEE RIDER 2
SEE KP – WEAR PLATE – 60” x 60” x 0.50” HDPE 2
PSAP – ICS – 53 ¼” (3 MODULES) 6
PROJECT EXECUTION –
OFFLOAD/ASSEMBLY/LAUNCH/CALIBRATION/MOOR/TRAINING/ADMIN
SACRIFICIAL ANODES REQ’D ON BEAM – WRRTY VOID IF NOT MAINTAINED 1
3.0 Place of Performance: Installation of the floating docks will be at piers 38-39 onboard Joint
Expeditionary Base Little Creek Virginia Beach, Virginia.
4.0 Required Delivery Date: 23 February 2024