Attachment 03 Questions and Answers.pdf

PDF 132 KB Posted

Attached to
N0018923Q0149 Mock Ship Federal contract opportunity
Solicitation number
N0018923Q0149
Issued by
Department of the Navy Naval Supply Systems Command

About this file

This document contains questions and answers related to federal contract solicitation N0018923Q0149 for the construction of a mock ship facility. The Navy seeks a contractor to construct a mock ship structure configured like a flight deck and bridge on land for training purposes. Key requirements include installing a non-slip surface and drainage on the flight deck to prevent water ponding, providing rectangular doors and knee knockers in passageways, and ensuring HVAC can address smoke ventilation from simulated munitions. The contractor must also maintain groundskeeping at the construction site. The bid due date is extended from July 28 to July 31, 2023. A separate construction contract for unspecified work is planned for award in August 2024 with an anticipated completion date unspecified.

View the file

Other files for this federal contract opportunity

Other files attached to N0018923Q0149 Mock Ship, newest first.
File Type Posted
Amendment 02 Conformed Copy.pdf PDF
Amendment 02 Modification Document.pdf PDF
Amendment 01 Modification Document.pdf PDF
N0081923Q0149 Amendment 01 Conformed Copy.pdf PDF
PAST_PERFORMANCE_REPORT_FORM.docx DOCX document
PAST PERFORMANCE INFORMATION FORM.docx DOCX document
Attachment 5 - Past Performance Report Form.docx DOCX document
Attachment 4 - Past Performance Information Form.docx DOCX document
N0018923Q0149.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Question: When will the separate construction contract be released/awarded and anticipated completion date?

Response: The USACE is working a separate construction contract that has a planned award date of 30 Sept 2023. Planned award date is approximately August FY24.

2. Question: Does the Government require electrical outlets? If so, how many?

Response: We cannot require the installation of electrical outlets. Please see the updated PWS.

3. Question: Is the contractor to provide the mock bridge components?

Response: No, all simulated/mock fixtures and equipment will be provided and installed by the

Navy.

4. Question: There is a conflict between Ship Configured Structure (The Ship) where the requirement states:

“The flight deck be sloped to drain, be painted, and have a non-slip coating applied.”

And Appendix A “Install metal non-slip surface, on Flight Deck. Provide Flat Roof storm drainage for

Flight Deck and the roof of the Bridge Container. Provide slopes at minimum of ¼” per foot. No gutters required. Ensure the drainage design allows for training foot traffic on the Flight Deck.”

Can the Government please clarify the requirement for the flight deck surface?

Is serrated bar grading a sufficient flight deck surface? Please clarify what materials should be used to construct the flight deck.

Response: Other TTS we have installed have flat roofs and they retain water and promote corrosion. We simply need a non-slip surface on the flight deck and adequate storm drainage to prevent ponding of water. The design needs to address these two concerns.

5. Response: Question: Will there be a requirement for a construction fence around the site?

No, a construction fence for this ship erection is not required.

6. Question: Is grounds keeping (including lawn maintenance) the contractor’s responsibility during construction?

Response: Yes, grounds maintenance at the construction site would be the responsibility of the contractor during the construction period. Please see the updated PWS.

7. Question: Does the Government want “knee-knockers” in the passageways?

Response: Yes, for any doors within the main passageways, knee knockers would be required.

Rectangular doors can be used for all side doors off of the main passageways. Please see the updated PWS.

8. Question: Does a commercial watertight door mean commercial standard rectangular type door or a marine hatch dog door?

Response: A watertight commercial standard rectangular door can be used at those locations.

9. Question: Can the Government provide more detail about the preferred style for watertight double doors?

Response: A watertight commercial standard rectangular double door can be used at the ship entrance (brow) and door from the bridge to the flight deck.

10. Question: If Marine type doors are required for emergency exits, does the Government want single dog or quick acting dog?

Response: Marine type doors are not required.

11. Question: The PWS does not mention fast extraction ventilation system for smoke, does the

Government want one installed?

Response: Simulated Marking Cartridges will be fired within the ship. Therefore, the HVAC design needs to address the applicable ventilation requirements associated with these training operations.

12. Question: Does the bridge require air conditioning?

Response: Yes

13. Question: What is the minimum width for the emergency exit stairs?

Response: The emergency stairs shall be designed in accordance with the applicable Federal and

State fire and safety standards.

14. Question: Can the Government provide a 1-week extension of due date following the answers to questions?

Response: This amendment 02 is to amend the PWS and extend the solicitation due date from 28

July 2023 1:00PM EST to 31 July 2023 1:00PM EST.

File details come from the government source that posted it. Updated .