PERFORMANCE WORK STATEMENT (PWS)
1.0 INTRODUCTION
Naval Station Norfolk Security Department requires 5 29’ Manually Operated Drop Arm Crash Beams W/Concrete Blocks to be placed at Pier Entry Control Points 1, 5, 9, 12 and 14 to control, deny, impede, delay and prevent access by unauthorized personnel.
2.0 SCOPE OF WORK
Contractor shall deliver, offload, and place 5 29’ Manually Operated Drop Arm Crash Beams W/Concrete Blocks at the required piers.
(5) 29’ Manually Operated Drop Arm Crash Beams W/ Concrete Blocks ASTM F2656-07 M50 crash test certified.
3.0 SCHEDULE OF WORK
The drop arms shall be delivered Monday – Friday, 0730 to 1630. The contractor shall coordinate delivery date and time with the installation prior to delivery.
4.0 PERIOD OF PERFORMANCE
The period of performance for resultant contract is from 30 days after date of contract award through 30 November 2019.
5.0 GOVERNMENT TECHNICAL POINT OF CONTACT (GTPOC)
6.0 METHOD OF PAYMENT
Payment for resultant contract shall be made via DFAS Electronics Funds Transfer (EFT) utilizing the Wide Area Work Flow (WAWF) System. The vendor is required to register and setup an account in the WAWF System in order to receive payment.