N0018918R0006_N0018918R0006.docx

DOCX document 168 KB Posted

Attached to
304 Hampton Roads Telecommunication Support Services
Solicitation number
N0018918R0006
Issued by

About this file

N0018918R0006_N0018918R0006.docx

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N0018918R0006

Section SF 1449 - CONTINUATION SHEET

PERFORMANCE WORK STATEMENT

PERFORMANCE WORK STATEMENT

1. Title: Engineering and Technical support services for leased telephone services at Naval Computer and Telecommunications Area Master Station Atlantic (NCTAMS LANT).

2. Place of Performance: U.S. Naval bases in Hampton Roads, Virginia; Naval Station Norfolk, Joint Expeditionary Base Little Creek/Fort Story, Norfolk Naval Shipyard, Saint Julien Creek Annex, Naval Air Station Oceana, Fentress Field, Dam Neck Annex, Naval Weapon Station Yorktown, Cheatham Annex, Naval Support Activity, Northwest Annex, Naval Support Activity Hampton Roads, Craney Island, and Lafayette River Annex and various off-premise locations.

3. Five Year Ordering Period:

Ordering Period
Dates
Year I
1 Mar 2018 – 28 Feb 2019
Year II
1 Mar 2019 – 28 Feb 2020
Year III
1 Mar 2020 – 29 Feb 2021
Year IV
1 Mar 2021 – 28 Feb 2022
Year V
1 Mar 2022 – 28 Feb 2023
52.217-8
1 Mar 2023– 31 Aug 2023

4. Scope. Work under this PWS will consist of the effort required to provide NCTAMS LANT leased telecommunications services as listed in Attachment 1 – Pricing Spreadsheet; at Navy sites listed in paragraph 2.

Task 1: Provide basic dial-tone service (Business Lines).

Task 2: Provide 1.544Mb (T1) point to point circuits.

Task 3: Provide Primary Rate Interface (PRI) circuits.

Task 4: Provide Metro-E - Fast Ethernet service. The following levels of service are required 10 Mbps, 30Mbps, 50Mbps, and 100Mbps speeds.

Task 5: Installation of new services (Non-Recurring Cost) as required. Installation of new services, if required, will be identified in individual task orders.

5. General Requirements:

5.1 The contractor shall provide the telecommunications requirement as defined in paragraph 4. Specific requirements are identified in Attachment 2 -List of Services Details.

5.2 Availability: The contractor shall provide an average circuit and PRI availability of at least 99.9% for those portions of circuits that are not government provided (i.e., government copper or fiber pairs provided to permit the extension of a circuit from a base demark to the service delivery point). Availability will be calculated by averaging data for up to ten circuits with the individual circuit availability derived by dividing total up time by total time for the period measured.

5.3 Approvals and Permits: The contractor/telecommunications provider (TP) is responsible for obtaining all approvals and permits necessary to provide this service. Inability of contractor/TP to obtain any such approvals or permits shall not be a valid reason for not meeting service dates or performance metrics. Failure of a contractor/TP to obtain any approval or permit necessary to provide this service may result in a termination of this contract by Government for default at no cost to Government and/or receipt of a negative past performance rating.

5.4 Scheduled Outages: The contractor shall utilize approved alternate or spare facilities whenever possible to eliminate or minimize scheduled service interruptions. In the event that a scheduled service interruption cannot be avoided, contractor/TP shall obtain approval from NCTAMS LANT External Support Department (ESD) or site base communications office (BCO), before initiating any scheduled outage. To obtain approval, a written “circuit release request” must be submitted to the appropriate BCO, no later than 21 calendar days prior to requested circuit release date. When an interruption of service is required to correct hazardous or degraded conditions the contractor must submit an emergency request stating the hazardous condition and obtain acknowledgement/response by the ESD or BCO official, 48-hours prior to the event. The request from contractor/TP must include the information as identified in paragraph 5.6 and the contractor must identify the hazardous or degraded conditions that exist which preclude providing the U.S. Government with 21-day advance notice.

5.5 In emergency situations when loss of life or property is at risk the contractor is authorized to take immediate action. Contractor/TP must make every reasonable attempt to notify the Government points of contact and coordinate arrangements for the service interruption to the maximum extent possible. Within 5 business days of an emergency interruption, contractor/TP must submit circuit release request to the ESD or BCO official (after –the-event) and identify the emergency conditions that existed which precluded providing the Government with 21-day advance notice.

5.6 Circuit Release Request must include following information:

· Contractor/TP Requesting circuit release and name and phone number of contractor/TP representative responsible for managing circuit release.

· Order number of circuit for which release is being requested.

· Date and inclusive times of scheduled circuit release, along with an alternate circuit release date and time.

· Purpose of scheduled circuit release.

· Statement indicating all equipment, parts, and/or supplies required to complete action are on-hand, or their expected delivery date.

· Statement indicating all avenues alternate facilities, spare facilities that are available.

· Estimated maximum recovery time to restore circuit. Failure of contractor/TP to obtain an approved circuit release prior to initiating a scheduled outage may result in Government termination of this contract for default at no cost to Government and/or receipt of a negative performance rating.

5.7 Restoral Maintenance: Response requirements are defined below. The site BCO can change response requirements from emergency to routine and required response times.

Commercial business lines are defined as routine services. All other contractor provided services are defined as priority services.

Response Time/Routine Outage Call: The contractor shall undertake remote troubleshooting within two (2) hours of receipt of notification of outage. If not cleared remotely, the contractor shall perform on-site troubleshooting not later than the next business day. The site contracting officer, contracting officer representative or alternate (KO/COR/ACOR) can provide relief from the next day on-site requirement based on user’s operational impact.

Priority Outage/Call: The contractor shall undertake remote troubleshooting within one (1) hour of receipt of notification of outage. If not cleared remotely, the contractor shall perform on-site troubleshooting not later than four (4) hours if the outage is limited to a single circuit. When an entire base or command is without service, the contractor shall respond the same day. The KO/COR/ACOR can provide relief from the same day on-site requirement based on user’s operational impact.

5.8 Trouble Reporting : The contractor shall provide a 24/7 Trouble Ticket reporting telephone line in which the repair tickets for services identified in this PWS are opened, tracked or updated.

6. Material and Equipment:

Contractor Furnished Material/Equipment: The contractor shall provide all materials required to deliver telecommunication services at each designated location. Damage to Government equipment or facility caused by the contractor’s negligence shall be corrected at no cost to the government. Corrections shall be made within 10 working days after notification by the government.

Government Furnished Material/Equipment: None.

7. Acceptance and Invoicing:

(a) An invoice is the Contractor’s bill or request for payment under the contract for products or services formally accepted by the Government. All invoices rendered under this contract shall be submitted electronically through government Invoicing, Receipt, Acceptance and Property Transfer (IRAPT) portal (formerly Wide Area Workflow -WAWF). Reference DFARs Clause 252-232-7003 Electronic Submission and Processing of Payment Requests: IRAPT/WAWF Help Desk 1-866-618-5988; IRAPT/WAWF Website/vendor guide: https://wawf.eb.mil/

(b) The Contractor shall bill monthly.

(c) Invoices shall clearly identify the following and be attached as a document (via the Misc. Info. Tab) in IRAPT/WAWF:

(1) Name and address of contractor.

(2) Invoice date.

(3) Contract number.

(4) Period of performance.

(5) Contract line item number(s) (CLIN).

(6) Item number.

(7) Accounting Classification Reference Number (ACRN) associated with the item billed.

(8) Description, serial number, quantity, unit of measure, unit price and extended price for services.

(9) Total charges and, if applicable, the prompt payment discount.

(10) Materials and any other direct costs charged during the period. Invoices with errors will be returned for re-submission before processing for approval and payment.

(d) Method of Payment: Treasury regulations require that all payments be made using electronic transfer. In order to accomplish this, the Contractor shall provide to the contracting officer within seven (7) days after the award, the information required in Clause 52.232-33, Mandatory Information for Electronic Funds Transfer Payment.

(e) Contractors who are already being paid electronically do not need to submit this information unless their information has changed. Invoices are payable when received in accordance with the Prompt Payment Act. Payment shall be considered as being made on the day a check is dated or an electronic funds transfer is made.

8. Constraints/Special Requirements:

U.S. citizenship is required of all contractor personnel assigned to this PWS. Duties involve delivery of service to support the Department of the Navy mission requiring a high level of confidence or trust; position designation is at the Non-Critical Sensitive level. Completion of tasks in this PWS may require access to restricted areas under Government control and/or sensitive information, including user level access to DON critical infrastructure. A National Agency Check with Local Agency and Credit Checks (NACLC) or equivalent suitability (hereafter referred to as "background investigations") shall be conducted on all employees assigned. Requests for NACLCs based upon this provision shall be submitted by the Contractor Security Manager, to the NCTAMS LANT Security Department, (in a format approved by the Government). Personnel not receiving a favorable determination based upon NACLC results may be denied site access and lose the ability to perform tasks on the contract. Contractor personnel shall have the personnel security background investigation as specified, at work performance start date. Proof of favorable security background investigation shall be provided to the Government, as recorded within the Joint Personnel Adjudication System/Joint Clearance and Access Verification System, prior to the Government granting unescorted access to work spaces. The Contractor shall ensure that all of their employees show their company’s commercial and government entity code (CAGE) affiliation in the JPAS record.

9. Service Delivery:

a. The contractor shall be responsible for delivering service to demarcation points at various Navy locations in the Hampton Roads area where service is required. Demarcation points will be identified on a case by case basis for each circuit or service ordered.

b. The contractor shall perform work in accordance with applicable industry standards, and specifications. The prime contractor must have the local and long-haul telecommunication infrastructure to deliver services direct to specified demarcation points.

(c). The government shall incur no additional cost if contractor infrastructure must be expanded, upgraded or installed to deliver services specified in this PWS and subsequent task orders. Subcontracting is not authorized except in extraordinary circumstances. The prime contractor must document and present sound rationale why prime vendor-owned infrastructure cannot be installed to support all the requirements of the contract. Government acceptance and approval of sub-contracting is required.

10. Data Requirements:

The contractor shall deliver CDRL A001 to NCTAMS LANT External Support Department. The preferred format is in Microsoft Word and/or Excel 2010 applications. Invoices must be made available via email (for review of details) and via IRAPT (formerly WAWF) for payment. The COR will accomplish inspection and final acceptance of Contractor’s deliverables.

Deliverable Description
PWS Reference Paragraph
Date Due
Detailed Monthly Service Invoice
10
No later than 10 days from the end of the billing cycle

11. COR and ACOR:

PRIMARY COR:

Name: TBD Organizational code: NCTAMS LANT N914 E-mail

CMCL:

FAX:

ALTERNATE COR:

Name: TBD Organizational code: NCTAMS LANT N9 E-mail address:

CMCL:

FAX:

12. ENTERPRISE-WIDE CONTRACTOR MANPOWER REPORTING APPLICATION (ECMRA)

The contractor shall report contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for Hampton Roads Telecommunication services via a secure data collection site. Contracted services excluded from reporting are based on Product Service Codes (PSCs). The excluded PSCs are:

(1) W, Lease/Rental of Equipment;

(2) X, Lease/Rental of Facilities;

(3) Y, Construction of Structures and Facilities;

(4) D, Automatic Data Processing and Telecommunications, IT and Telecom- Telecommunications Transmission (D304) and Internet (D322) ONLY;

(5) S, Utilities ONLY;

(6) V, Freight and Shipping ONLY.

The contractor is required to completely fill in all required data fields using the following web address https://doncmra.nmci.navy.mil.

Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk, linked at https://doncmra.nmci.navy.mil .

13. CONTRACTOR UNCLASSIFIED ACCESS TO FEDERALLY CONTROLLED FACILITIES, SENSITIVE INFORMATION, INFORMATION TECHNOLOGY (IT) SYSTEMS OR PROTECTED HEALTH INFORMATION

Homeland Security Presidential Directive (HSPD)-12, requires government agencies to develop and implement Federal security standards for Federal employees and contractors. The Deputy Secretary of Defense Directive-Type Memorandum (DTM) 08-006 – “DoD Implementation of Homeland Security Presidential Directive – 12 (HSPD-12)” dated November 26, 2008 (or its subsequent DoD instruction) directs implementation of HSPD-12. This clause is in accordance with HSPD-12 and its implementing directives.

APPLICABILITY

This clause applies to contractor employees requiring physical access to any area of a federally controlled base, facility or activity and/or requiring access to a DoN or DoD computer/network/system to perform certain unclassified sensitive duties. This clause also applies to contractor employees who access Privacy Act and Protected Health Information, provide support associated with fiduciary duties, or perform duties that have been identified by DON as National Security Position, as advised by the command security manager. It is the responsibility of the responsible security officer of the command/facility where the work is performed to ensure compliance.

Each contractor employee providing services at a Navy Command under this contract is required to obtain a Department of Defense Common Access Card (DoD CAC). Additionally, depending on the level of computer/network access, the contract employee will require a successful investigation as detailed below.

ACCESS TO FEDERAL FACILITIES

Per HSPD-12 and implementing guidance, all contractor employees working at a federally controlled base, facility or activity under this clause will require a DoD CAC. When access to a base, facility or activity is required contractor employees shall in-process with the Command’s Security Manager upon arrival to the Command and shall out-process prior to their departure at the completion of the individual’s performance under the contract.

ACCESS TO DOD IT SYSTEMS

In accordance with SECNAV M-5510.30, contractor employees who require access to DoN or DoD networks are categorized as IT-I, IT-II, or IT-III. The IT-II level, defined in detail in SECNAV M-5510.30, includes positions which require access to information protected under the Privacy Act, to include Protected Health Information (PHI). All contractor employees under this contract who require access to Privacy Act protected information are therefore categorized no lower than IT-II. IT Levels are determined by the requiring activity’s Command Information Assurance Manager.

Contractor employees requiring privileged or IT-I level access, (when specified by the terms of the contract) require a Single Scope Background Investigation (SSBI) or T5 or T5R equivalent investigation, which is a higher level investigation than the National Agency Check with Law and Credit (NACLC)/T3/T3R described below. Due to the privileged system access, an investigation suitable for High Risk national security positions is required. Individuals who have access to system control, monitoring, or administration functions (e.g. system administrator, database administrator) require training and certification to Information Assurance Technical Level 1, and must be trained and certified on the Operating System or Computing Environment they are required to maintain.

Access to sensitive IT systems is contingent upon a favorably adjudicated background investigation. When access to IT systems is required for performance of the contractor employee’s duties, such employees shall in-process with the Navy Command’s Security Manager and Information Assurance Manager upon arrival to the Navy command and shall out-process prior to their departure at the completion of the individual’s performance under the contract. Completion and approval of a System Authorization Access Request Navy (SAAR-N) form is required for all individuals accessing Navy Information Technology resources. The decision to authorize access to a government IT system/network is inherently governmental. The contractor supervisor is not authorized to sign the SAAR-N; therefore, the government employee with knowledge of the system/network access required or the COR shall sign the SAAR-N as the “supervisor”.

The SAAR-N shall be forwarded to the Command’s Security Manager at least 30 days prior to the individual’s start date. Failure to provide the required documentation at least 30 days prior to the individual’s start date may result in delaying the individual’s start date.

When required to maintain access to required IT systems or networks, the contractor shall ensure that all employees requiring access complete annual Information Assurance (IA) training, and maintain a current requisite background investigation. The Contractor’s Security Representative shall contact the Command Security Manager for guidance when reinvestigations are required.

INTERIM ACCESS

The Command's Security Manager may authorize issuance of a DoD CAC and interim access to a DoN or DoD unclassified computer/network upon a favorable review of the investigative questionnaire and advance favorable fingerprint results. When the results of the investigation are received and a favorable determination is not made, the contractor employee working on the contract under interim access will be denied access to the computer network and this denial will not relieve the contractor of his/her responsibility to perform.

DENIAL OR TERMINATION OF ACCESS

The potential consequences of any requirement under this clause including denial or termination of physical or system access in no way relieves the contractor from the requirement to execute performance under the contract within the timeframes specified in the contract. Contractors shall plan ahead in processing their employees and subcontractor employees. The contractor shall insert this clause in all subcontracts when the subcontractor is permitted to have unclassified access to a federally controlled facility, federally-controlled information system/network and/or to government information, meaning information not authorized for public release.

CONTRACTOR’S SECURITY REPRESENTATIVE

The contractor shall designate an employee to serve as the Contractor’s Security Representative. Within three work days after contract award, the contractor shall provide to the requiring activity’s Security Manager and the Contracting Officer, in writing, the name, title, address and phone number for the Contractor’s Security Representative. The Contractor’s Security Representative shall be the primary point of contact on any security matter. The Contractor’s Security Representative shall not be replaced or removed without prior notice to the Contracting Officer and Command Security Manager.

BACKGROUND INVESTIGATION REQUIREMENTS AND SECURITY APPROVAL PROCESS FOR CONTRACTORS ASSIGNED TO NATIONAL SECURITY POSITIONS OR PERFORMING SENSITIVE DUTIES Navy security policy requires that all positions be given a sensitivity value based on level of risk factors to ensure appropriate protective measures are applied. Contractor employees under this contract are recognized as Non-Critical Sensitive [ADP/IT-II] positions when the contract scope of work require physical access to a federally controlled base, facility or activity and/or requiring access to a DoD computer/network, to perform unclassified sensitive duties. This designation is also applied to contractor employees who access Privacy Act and Protected Health Information (PHI), provide support associated with fiduciary duties, or perform duties that have been identified as National Security Positions. At a minimum, each contractor employee must be a US citizen and have a favorably completed NACLC or T3 or T3R equivalent investigation to obtain a favorable determination for assignment to a non-critical sensitive or IT-II position. The investigation consists of a standard NAC and a FBI fingerprint check plus law enforcement checks and credit check. Each contractor employee filling a non-critical sensitive or IT-II position is required to complete:

· SF-86 Questionnaire for National Security Positions (or equivalent OPM investigative product)

· Two FD-258 Applicant Fingerprint Cards (or an electronic fingerprint submission)

· Original Signed Release Statements

Failure to provide the required documentation at least 30 days prior to the individual’s start date shall result in delaying the individual’s start date. Background investigations shall be reinitiated as required to ensure investigations remain current (not older than 10 years) throughout the contract performance period. The Contractor’s Security Representative shall contact the Command Security Manager for guidance when reinvestigations are required.

Regardless of their duties or IT access requirements ALL contractor employees shall in-process with the Command’s Security Manager upon arrival to the command and shall out-process prior to their departure at the completion of the individual’s performance under the contract. Employees requiring IT access shall also check-in and check-out with the Navy Command’s Information Assurance Manager. Completion and approval of a System Authorization Access Request Navy (SAAR-N) form is required for all individuals accessing Navy Information Technology resources. The SAAR-N shall be forwarded to the Navy Command’s Security Manager at least 30 days prior to the individual’s start date. Failure to provide the required documentation at least 30 days prior to the individual’s start date shall result in delaying the individual’s start date.

The contractor shall ensure that each contract employee requiring access to IT systems or networks complete annual Information Assurance (IA) training, and maintain a current requisite background investigation. Contractor employees shall accurately complete the required investigative forms prior to submission to the Command Security Manager. The Command’s Security Manager will review the submitted documentation for completeness prior to submitting it to the Office of Personnel Management (OPM); Potential suitability or security issues identified may render the contractor employee ineligible for the assignment. An unfavorable determination is final (subject to SF-86 appeal procedures) and such a determination does not relieve the contractor from meeting any contractual obligation under the contract. The Command’s Security Manager will forward the required forms to OPM for processing. Once the investigation is complete, the results will be forwarded by OPM to the DOD Central Adjudication Facility (CAF) for a determination.

If the contractor employee already possesses a current favorably adjudicated investigation, the contractor shall submit a Visit Authorization Request (VAR) via the Joint Personnel Adjudication System (JPAS) or a hard copy VAR directly from the contractor’s Security Representative. Although the contractor will take JPAS “Owning” role over the contractor employee, the Navy Command will take JPAS "Servicing" role over the contractor employee during the hiring process and for the duration of assignment under that contract. The contractor shall include the IT Position Category per SECNAV M-5510.30 for each employee designated on a VAR. The VAR requires annual renewal for the duration of the employee’s performance under the contract.

BACKGROUND INVESTIGATION REQUIREMENTS AND SECURITY APPROVAL PROCESS FOR CONTRACTORS ASSIGNED TO OR PERFORMING NON-SENSITIVE DUTIES Contractor employee whose work is unclassified and non-sensitive (e.g., performing certain duties such as lawn maintenance, vendor services, etc..) and who require physical access to publicly accessible areas to perform those duties shall meet the following minimum requirements:

· Must be either a US citizen or a US permanent resident with a minimum of 3 years legal residency in the United States (as required by The Deputy Secretary of Defense DTM 08-006 or its subsequent DoD instruction) and

· Must have a favorably completed National Agency Check with Written Inquiries (NACI) or T1 investigation equivalent including a FBI fingerprint check prior to installation access.

To be considered for a favorable trustworthiness determination, the Contractor’s Security Representative must submit for all employees each of the following:

· SF-85 Questionnaire for Non-Sensitive Positions

· Two FD-258 Applicant Fingerprint Cards (or an electronic fingerprint submission)

· Original Signed Release Statements

The contractor shall ensure each individual employee has a current favorably completed National Agency Check with Written Inquiries (NACI) or T1 investigation equivalent, or ensure successful FBI fingerprint results have been gained and investigation has been processed with OPM.

Failure to provide the required documentation at least 30 days prior to the individual’s start date may result in delaying the individual’s start date.

* Consult with your Command Security Manager and Information Assurance Manager for local policy when IT-III (non-sensitive) access is required for non-US citizens outside the United States.

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Each

Telecommunication Support Services

FFP

Vendor shall provide NCTAMS LANT telecommunication support services to be performed in accordance with the Performance Work Statement (PWS) incorporated herein, Attachment I- Pricing Spreadsheet and Attachment 2 - List of Service Details. Performance consists of a 5 year ordering period commencing 01 March 2018 and continuing up to and through 28 February 2023. CLIN 1001 covers telecommunication support services for the entire 5 year ordering period.

FOB: Destination

MILSTRIP: N7027218RCHRTS8

PURCHASE REQUEST NUMBER: N7027218RCHRTS8

SIGNAL CODE: J

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Each
OPTION
-8 Option to Extend Services

FFP

CLIN 2001 covers telecommunication support services for a 6 month extension inaccordance with FAR 52.217-8 Option to Extend Services.

FOB: Destination

MILSTRIP: N7027218RCHRTS8

SIGNAL CODE: J

NET AMT

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN
INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
1001
Destination
Government
Destination
Government
2001
Destination
Government
Destination
Government

DELIVERY INFORMATION

CLIN
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE
1001
POP 01-MAR-2018 TO

28-FEB-2023

N/A
NAV COMPUTER AND TELECOMMUNICATIONS

EDWARD DAVIS

9625 MOFFETT AVE

NORFOLK VA 23511

757-443-9090 FOB: Destination N70272

2001
POP 01-MAR-2023 TO

31-AUG-2023

N/A
(SAME AS PREVIOUS LOCATION)

FOB: Destination N70272

CLAUSES INCORPORATED BY REFERENCE

52.203-3
Gratuities
APR 1984
52.203-18
Prohibition on Contracting With Entities That Require Certain Internal Confidentiality Agreements or Statements--Representation
JAN 2017
52.203-19
Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements
JAN 2017
52.204-7
System for Award Management
OCT 2016
52.204-13
System for Award Management Maintenance
OCT 2016
52.204-16
Commercial and Government Entity Code Reporting
JUL 2016
52.204-18
Commercial and Government Entity Code Maintenance
JUL 2016
52.209-7
Information Regarding Responsibility Matters
JUL 2013
52.217-5
Evaluation Of Options
JUL 1990
52.217-5
Evaluation Of Options
JUL 1990
52.222-60
Paycheck Transparency (Executive Order 13673)
OCT 2016
52.228-5
Insurance - Work On A Government Installation
JAN 1997
52.232-39
Unenforceability of Unauthorized Obligations
JUN 2013
52.232-40
Providing Accelerated Payments to Small Business Subcontractors
DEC 2013
52.233-3
Protest After Award
AUG 1996
52.237-2
Protection Of Government Buildings, Equipment, And Vegetation
APR 1984
52.247-34
F.O.B. Destination
NOV 1991
252.201-7000
Contracting Officer's Representative
DEC 1991
252.203-7000
Requirements Relating to Compensation of Former DoD Officials
SEP 2011
252.203-7002
Requirement to Inform Employees of Whistleblower Rights
SEP 2013
252.204-7003
Control Of Government Personnel Work Product
APR 1992
252.204-7004 Alt A
System for Award Management Alternate A
FEB 2014
252.204-7012
Safeguarding Covered Defense Information and Cyber Incident Reporting
OCT 2016
252.204-7015
Notice of Authorized Disclosure of Information for Litigation Support
MAY 2016
252.205-7000
Provision Of Information To Cooperative Agreement Holders
DEC 1991
252.209-7004
Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism
OCT 2015
252.222-7007
Representation Regarding Combating Trafficking in Persons
JAN 2015
252.223-7006
Prohibition On Storage, Treatment, and Disposal of Toxic or Hazardous Materials
SEP 2014
252.225-7012
Preference For Certain Domestic Commodities
DEC 2016
252.225-7048
Export-Controlled Items
JUN 2013
252.232-7003
Electronic Submission of Payment Requests and Receiving Reports
JUN 2012
252.232-7010
Levies on Contract Payments
DEC 2006
252.237-7010
Prohibition on Interrogation of Detainees by Contractor Personnel
JUN 2013
252.239-7017
Notice of Supply Chain Risk
NOV 2013
252.239-7018
Supply Chain Risk
OCT 2015
252.244-7000
Subcontracts for Commercial Items
JUN 2013
252.246-7004
Safety of Facilities, Infrastructure, and Equipment for Military Operations
OCT 2010
252.246-7008
Sources of Electronic Parts
OCT 2016
252.247-7023
Transportation of Supplies by Sea
APR 2014

CLAUSES INCORPORATED BY FULL TEXT

52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (JUN 2016)

(a) Definitions. As used in this clause--

Covered contractor information system means an information system that is owned or operated by a contractor that processes, stores, or transmits Federal contract information.

Federal contract information means information, not intended for public release, that is provided by or generated for the Government under a contract to develop or deliver a product or service to the Government, but not including information provided by the Government to the public (such as on public Web sites) or simple transactional information, such as necessary to process payments.

Information means any communication or representation of knowledge such as facts, data, or opinions, in any medium or form, including textual, numerical, graphic, cartographic, narrative, or audiovisual (Committee on National Security Systems Instruction (CNSSI) 4009).

Information system means a discrete set of information resources organized for the collection, processing, maintenance, use, sharing, dissemination, or disposition of information (44 U.S.C. 3502).

Safeguarding means measures or controls that are prescribed to protect information systems.

(b) Safeguarding requirements and procedures.

(1) The Contractor shall apply the following basic safeguarding requirements and procedures to protect covered contractor information systems. Requirements and procedures for basic safeguarding of covered contractor information systems shall include, at a minimum, the following security controls:

(i) Limit information system access to authorized users, processes acting on behalf of authorized users, or devices (including other information systems).

(ii) Limit information system access to the types of transactions and functions that authorized users are permitted to execute.

(iii) Verify and control/limit connections to and use of external information systems.

(iv) Control information posted or processed on publicly accessible information systems.

(v) Identify information system users, processes acting on behalf of users, or devices.

(vi) Authenticate (or verify) the identities of those users, processes, or devices, as a prerequisite to allowing access to organizational information systems.

(vii) Sanitize or destroy information system media containing Federal Contract Information before disposal or release for reuse.

(viii) Limit physical access to organizational information systems, equipment, and the respective operating environments to authorized individuals.

(ix) Escort visitors and monitor visitor activity; maintain audit logs of physical access; and control and manage physical access devices.

(x) Monitor, control, and protect organizational communications (i.e., information transmitted or received by organizational information systems) at the external boundaries and key internal boundaries of the information systems.

(xi) Implement subnetworks for publicly accessible system components that are physically or logically separated from internal networks.

(xii) Identify, report, and correct information and information system flaws in a timely manner.

(xiii) Provide protection from malicious code at appropriate locations within organizational information systems.

(xiv) Update malicious code protection mechanisms when new releases are available.

(xv) Perform periodic scans of the information system and real-time scans of files from external sources as files are downloaded, opened, or executed.

(2) Other requirements. This clause does not relieve the Contractor of any other specific safeguarding requirements specified by Federal agencies and departments relating to covered contractor information systems generally or other Federal safeguarding requirements for controlled unclassified information (CUI) as established by Executive Order 13556.

(c) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (c), in subcontracts under this contract (including subcontracts for the acquisition of commercial items, other than commercially available off-the-shelf items), in which the subcontractor may have Federal contract information residing in or transiting through its information system.

(End of clause)

52.209-11 REPRESENTATION BY CORPORATIONS REGARDING DELINQUENT TAX LIABILITY OR A

FELONY CONVICTION UNDER ANY FEDERAL LAW (FEB 2016)

(a) As required by sections 744 and 745 of Division E of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235), and similar provisions, if contained in subsequent appropriations acts, the Government will not enter into a contract with any corporation that--

(1) Has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, where the awarding agency is aware of the unpaid tax liability, unless an agency has considered suspension or debarment of the corporation and made a determination that suspension or debarment is not necessary to protect the interests of the Government; or

(2) Was convicted of a felony criminal violation under any Federal law within the preceding 24 months, where the awarding agency is aware of the conviction, unless an agency has considered suspension or debarment of the corporation and made a determination that this action is not necessary to protect the interests of the Government.

(b) The Offeror represents that--

(1) It is [ ] is not [ ] a corporation that has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability; and

(2) It is [ ] is not [ ] a corporation that was convicted of a felony criminal violation under a Federal law within the preceding 24 months.

(End of provision)

52.212-1 INSTRUCTIONS TO OFFERORS--COMMERCIAL ITEMS (JAN 2017)

(a) North American Industry Classification System (NAICS) code and small business size standard. The NAICS code and small business size standard for this acquisition appear in Block 10 of the solicitation cover sheet (SF 1449). However, the small business size standard for a concern which submits an offer in its own name, but which proposes to furnish an item which it did not itself manufacture, is 500 employees.

(b) Submission of offers. Submit signed and dated offers to the office specified in this solicitation at or before the exact time specified in this solicitation. Offers may be submitted on the SF 1449, letterhead stationery, or as otherwise specified in the solicitation. As a minimum, offers must show--

(1) The solicitation number;

(2) The time specified in the solicitation for receipt of offers;

(3) The name, address, and telephone number of the offeror;

(4) A technical description of the items being offered in sufficient detail to evaluate compliance with the requirements in the solicitation. This may include product literature, or other documents, if necessary;

(5) Terms of any express warranty;

(6) Price and any discount terms;

(7) "Remit to" address, if different than mailing address;

(8) A completed copy of the representations and certifications at FAR 52.212-3 (see FAR 52.212-3(b) for those representations and certifications that the offeror shall complete electronically);

(9) Acknowledgment of Solicitation Amendments;

(10) Past performance information, when included as an evaluation factor, to include recent and relevant contracts for the same or similar items and other references (including contract numbers, points of contact with telephone numbers and other relevant information); and

(11) If the offer is not submitted on the SF 1449, include a statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation. Offers that fail to furnish required representations or information, or reject the terms and conditions of the solicitation may be excluded from consideration.

(c) Period for acceptance of offers. The offeror agrees to hold the prices in its offer firm for 30 calendar days from the date specified for receipt of offers, unless another time period is specified in an addendum to the solicitation.

(d) Product samples. When required by the solicitation, product samples shall be submitted at or prior to the time specified for receipt of offers. Unless otherwise specified in this solicitation, these samples shall be submitted at no expense to the Government, and returned at the sender's request and expense, unless they are destroyed during preaward testing.

(e) Multiple offers. Offerors are encouraged to submit multiple offers presenting alternative terms and conditions, including alternative line items (provided that the alternative line items are consistent with subpart 4.10 of the Federal Acquisition Regulation), or alternative commercial items for satisfying the requirements of this solicitation. Each offer submitted will be evaluated separately.

(f) Late submissions, modifications, revisions, and withdrawals of offers:

(1) Offerors are responsible for submitting offers, and any modifications, revisions, or withdrawals, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that offers or revisions are due.

(2)(i) Any offer, modification, revision, or withdrawal of an offer received at the Government office designated in the solicitation after the exact time specified for receipt of offers is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and--

(A) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of offers; or

(B) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government's control prior to the time set for receipt of offers; or

(C) If this solicitation is a request for proposals, it was the only proposal received.

(ii) However, a late modification of an otherwise successful offer, that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.

(3) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the offer wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.

(4) If an emergency or unanticipated event interrupts normal Government processes so that offers cannot be received at the Government office designated for receipt of offers by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation or other notice of an extension of the closing date, the time specified for receipt of offers will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.

(5) Offers may be withdrawn by written notice received at any time before the exact time set for receipt of offers. Oral offers in response to oral solicitations may be withdrawn orally. If the solicitation authorizes facsimile offers, offers may be withdrawn via facsimile received at any time before the exact time set for receipt of offers, subject to the conditions specified in the solicitation concerning facsimile offers. An offer may be withdrawn in person by an offeror or its authorized representative if, before the exact time set for receipt of offers, the identity of the person requesting withdrawal is established and the person signs a receipt for the offer.

(g) Contract award (not applicable to Invitation for Bids). The Government intends to evaluate offers and award a contract without discussions with offerors. Therefore, the offeror's initial offer should contain the offeror's best terms from a price and technical standpoint. However, the Government reserves the right to conduct discussions if later determined by the Contracting Officer to be necessary. The Government may reject any or all offers if such action is in the public interest; accept other than the lowest offer; and waive informalities and minor irregularities in offers received.

(h) Multiple awards. The Government may accept any item or group of items of an offer, unless the offeror qualifies the offer by specific limitations. Unless otherwise provided in the Schedule, offers may not be submitted for quantities less than those specified. The Government reserves the right to make an award on any item for a quantity less than the quantity offered, at the unit prices offered, unless the offeror specifies otherwise in the offer.

(i) Availability of requirements documents cited in the solicitation. (1)(i) The GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR Part 101-29, and copies of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained for a fee by submitting a request to--GSA Federal Supply Service Specifications Section, Suite 8100, 470 East L'Enfant Plaza, SW, Washington, DC 20407, Telephone (202) 619-8925, Facsimile (202) 619-8978.

(ii) If the General Services Administration, Department of Agriculture, or Department of Veterans Affairs issued this solicitation, a single copy of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained free of charge by submitting a request to the addressee in paragraph (i)(1)(i) of this provision. Additional copies will be issued for a fee.

(2) Most unclassified Defense specifications and standards may be downloaded from the following ASSIST websites:

(i) ASSIST (https://assist.dla.mil/online/start/).

(ii) Quick Search (http://quicksearch.dla.mil/).

(iii) ASSISTdocs.com (http://assistdocs.com).

(3) Documents not available from ASSIST may be ordered from the Department of Defense Single Stock Point (DoDSSP) by--

(i) Using the ASSIST Shopping Wizard (https://assist.dla.mil/wizard/index.cfm);

(ii) Phoning the DoDSSP Customer Service Desk (215) 697-2179, Mon-Fri, 0730 to 1600 EST; or

(iii) Ordering from DoDSSP, Building 4, Section D, 700 Robbins Avenue, Philadelphia, PA 19111-5094, Telephone (215) 697-2667/2179, Facsimile (215) 697-1462.

(4) Nongovernment (voluntary) standards must be obtained from the organization responsible for their preparation, publication, or maintenance.

(j) Unique entity identifier. (Applies to all offers exceeding $3,500, and offers of $3,500 or less if the solicitation requires the Contractor to be registered in the System for Award Management (SAM) database.) The Offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation ``Unique Entity Identifier'' followed by the unique entity identifier that identifies the Offeror's name and address. The Offeror also shall enter its Electronic Funds Transfer (EFT) indicator, if applicable. The EFT indicator is a four-character suffix to the unique entity identifier. The suffix is assigned at the discretion of the Offeror to establish additional SAM records for identifying alternative EFT accounts (see subpart 32.11) for the same entity. If the Offeror does not have a unique entity identifier, it should contact the entity designated at www.sam.gov for unique entity identifier establishment directly to obtain one. The Offeror should indicate that it is an offeror for a Government contract when contacting the entity designated at www.sam.gov for establishing the unique entity identifier.

(k) System for Award Management. Unless exempted by an addendum to this solicitation, by submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the SAM database prior to award, during performance and through final payment of any contract resulting from this solicitation. If the Offeror does not become registered in the SAM database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror. Offerors may obtain information on registration and annual confirmation requirements via the SAM database accessed through https://www.acquisition.gov.

(l) Debriefing. If a post-award debriefing is given to requesting offerors, the Government shall disclose the following information, if applicable:

(1) The agency's evaluation of the significant weak or deficient factors in the debriefed offeror's offer.

(2) The overall evaluated cost or price and technical rating of the successful and the debriefed offeror and past performance information on the debriefed offeror.

(3) The overall ranking of all offerors, when any ranking was developed by the agency during source selection.

(4) A summary of the rationale for award;

(5) For acquisitions of commercial items, the make and model of the item to be delivered by the successful offeror.

(6) Reasonable responses to relevant questions posed by the debriefed offeror as to whether source-selection procedures set forth in the solicitation, applicable regulations, and other applicable authorities were followed by the agency.

(End of provision)

ADDENDUM TO 52.212-1

A. At the time of solicitation closing date, the vendor shall submit their quote via electronic submittal to Dorothy.Curling@navy.mil . Only electronic submissions shall be accepted.

B. The quote will be due on the closing date of subject RFQ and must be held firm for ninety (90) days.

C. Submission of Quotation

In addition to FAR 52.212-1, Instructions to Vendors– Commercial Items, the following information is provided. The quote must include the completed solicitation documents as follows:

· A complete and signed Standard Form 1449, Solicitation/Contract/Order for Commercial Items, and executed copy of Amendments, if applicable, completed by the vendor.

· RFQ Section - Schedule of Supplies/Services - completed by the vendor

· A completed Pricing Spreadsheet provided as Attachment I to this RFQ.

· Attachment I – Pricing Spreadsheet will be incorporated into the resulting contract.

· Utilizing Attachment I- Pricing…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.