N0018918QG253_SWOS_AST_Spill_Prevention_Issues.docx
DOCX document 3 MB Posted
- Attached to
- REPAIR FUEL STORAGE TANK
- Solicitation number
- N0018918QG253
About this file
N0018918QG253_SWOS_AST_Spill_Prevention_Issues.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 18QG253.docx | DOCX document | |
| Attachments_18_11_48.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Surface Warfare Officer School - Building 207 Aboveground Storage Tank (AST) Deficiencies
AST w/in Secondary Containment Berm
AST Saddle Support Buckled Outward On Left Side
Visible Space Between AST and Right-Side Saddle Support
Visible Space Between AST and Left-Side Saddle Support
Fuel Weeping from Return Pipe Fitting
Primary Vent Cap Not Installed. The fuel cap acts as the primary vent for this AST. Potential for AST to implode when fuel drawn through Discharge line.
Example of Correct Solution for Primary Vent Cap and Return Line.
This is EWTGPAC’s AST located on side of Building 207
Discharge and Return Piping Not Double-Walled. No general secondary containment for pressurized piping
Discharge and Return Lines Inside Building 207
· Secondary Containment Berm made with cinder blocks is not considered impervious to leaks as concrete. The floor and the concrete supports for previous AST are concrete. The two spaces on the left concrete support for previous AST would have to be filled, if a coating is considered as a solution.
· AST not labeled with NFPA Diamond, No Smoking w/in 50 Ft and Contents
· No sample valve. To check fuel sample. (Bottom of tank) image6.jpeg image7.jpeg image8.jpeg image9.jpeg image1.jpeg image2.jpeg image3.jpeg image4.jpeg image5.jpeg