Section SF 1449 - CONTINUATION SHEET

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
25,000
Lot

SHIPPING COMPANY SERVICES

FFP

WEEKEND AND AFTERHOURS PICKUPS/DELIVERIES ABILITY TO SHIP MATERIAL OVER 300 POUNDS AND PROVIDE THE FASTEST TRACEABLE MEANS FOR GLOBAL SHIPPING.

ABILITY TO SUPPORT EMERGENT SHIPMENT OF MATERIAL TO SUBMARINES THE WORLD

PROVIDE A SERVICE REPRESENTATIVE WHO SUPPORTS ANY EMERGENT SHIPMENTS

ALL CONTRACTORS BIDDING ON THIS REQUIREMENT MUST USE AN APPROVED CARRIER THROUGH THE CIVIL RESERVE AIR FLEET (CRAF) PROGRAM.

FOB: Destination

PURCHASE REQUEST NUMBER: V683162320U001T

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
25,000
Lot
OPTION
SHIPPING COMPANY SERVICES

FFP

WEEKEND AND AFTERHOURS PICKUPS/DELIVERIES ABILITY TO SHIP MATERIAL OVER 300 POUNDS AND PROVIDE THE FASTEST TRACEABLE MEANS FOR GLOBAL SHIPPING.

ABILITY TO SUPPORT EMERGENT SHIPMENT OF MATERIAL TO SUBMARINES THE WORLD

PROVIDE A SERVICE REPRESENTATIVE WHO SUPPORTS ANY EMERGENT SHIPMENTS

ALL CONTRACTORS BIDDING ON THIS REQUIREMENT MUST USE AN APPROVED CARRIER THROUGH THE CIVIL RESERVE AIR FLEET (CRAF) PROGRAM.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
25,000
Lot
OPTION
SHIPPING COMPANY SERVICES

FFP

WEEKEND AND AFTERHOURS PICKUPS/DELIVERIES ABILITY TO SHIP MATERIAL OVER 300 POUNDS AND PROVIDE THE FASTEST TRACEABLE MEANS FOR GLOBAL SHIPPING.

ABILITY TO SUPPORT EMERGENT SHIPMENT OF MATERIAL TO SUBMARINES THE WORLD

PROVIDE A SERVICE REPRESENTATIVE WHO SUPPORTS ANY EMERGENT SHIPMENTS

ALL CONTRACTORS BIDDING ON THIS REQUIREMENT MUST USE AN APPROVED CARRIER THROUGH THE CIVIL RESERVE AIR FLEET (CRAF) PROGRAM.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
25,000
Lot
OPTION
SHIPPING COMPANY SERVICES

FFP

WEEKEND AND AFTERHOURS PICKUPS/DELIVERIES ABILITY TO SHIP MATERIAL OVER 300 POUNDS AND PROVIDE THE FASTEST TRACEABLE MEANS FOR GLOBAL SHIPPING.

ABILITY TO SUPPORT EMERGENT SHIPMENT OF MATERIAL TO SUBMARINES THE WORLD

PROVIDE A SERVICE REPRESENTATIVE WHO SUPPORTS ANY EMERGENT SHIPMENTS

ALL CONTRACTORS BIDDING ON THIS REQUIREMENT MUST USE AN APPROVED CARRIER THROUGH THE CIVIL RESERVE AIR FLEET (CRAF) PROGRAM.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
25,000
Lot
OPTION
SHIPPING COMPANY SERVICES

FFP

WEEKEND AND AFTERHOURS PICKUPS/DELIVERIES ABILITY TO SHIP MATERIAL OVER 300 POUNDS AND PROVIDE THE FASTEST TRACEABLE MEANS FOR GLOBAL SHIPPING.

ABILITY TO SUPPORT EMERGENT SHIPMENT OF MATERIAL TO SUBMARINES THE WORLD

PROVIDE A SERVICE REPRESENTATIVE WHO SUPPORTS ANY EMERGENT SHIPMENTS

ALL CONTRACTORS BIDDING ON THIS REQUIREMENT MUST USE AN APPROVED CARRIER THROUGH THE CIVIL RESERVE AIR FLEET (CRAF) PROGRAM.

NET AMT

STATEMENT OF WORK

STATEMENT OF WORK

NAVAL SUBMARINE SUPPORT FACILITY (NSSF)

SUPPLY DEPARTMENT

REQUISITION NUMBER V68316-2320-U001T

1.0 INTRODUCTION/BACKGROUND

Naval Submarine Support Facility (NSSF) Supply has a requirement for shipping services in support of US Naval submarines on deployment. Routinely NSSF is tasked by higher authority to support repairs of vessels deployed overseas. On many occasions fly away teams need critical repair parts and equipment shipped after hours or on Saturdays. The traditional means of shipping material does not support this requirement. All contractors must use a registered carrier under the Civil Reserve Air Fleet (CRAF) program in order to be considered for award. Contractors are required to submit proof of the approved carriers registration in the CRAF program with their bid. Failure to provide this information will result in automatic disqualification from consideration for award.

2.0 SCOPE OF WORK/MINIMUM TASKS

A. The contractor shall provide shipping services including pickup and delivery for materials over 300 lbs per shipment and preparation of any customs clearance documents required. The contractor shall provide the fastest traceable means for Global Shipping with the ability to support emergent shipments of materials to submarines around the world. If vessels will be used for transport then only US Flag Vessels will be used.

The following is a list of potential destination for shipping services. Note: Not all of these destinations may be used during each period of performance for this contract, and other destinations may be added as a contract modification as the need arises. The total estimated number of shipments per month is 15-20 not to exceed 225 shipments per year. The most frequent destinations are the Persian Gulf, Mediterranean, and the United Kingdom. All shipments will be billed by destination and weight.

1) Faslane, Scotland

2) Rota, Spain

3) Crete, Greece

4) Sigonella, Italy

5) Bahrain

6) Naples, Italy

7) Portsmouth, England

8) Limassol, Cypress

9) Haifa, Israel

10) Jebel Ali

11) Gibraltar

B. The contractor shall provide pickup service from Naval Submarine Base, Groton, CT and shall also provide a Logistic Service Representative (LSR) who will be the primary point of contact for the Navy for handling shipment coordination. The LSR must be reachable 24/7 to coordinate evening and weekend shipments. The LSR does not have to be co located at the Naval Submarine Base, Groton, CT.

3.0 GOVERNMENT EQUIPMENT:

None of the shipments under this requirement will contain hazardous items (lithium batteries may be included as part of a shipment). All items will be shipped on US Flag Carriers. There will be no classified shipments within the scope of this requirement. Most material will be in small boxes but tools and equipment are loaded in job boxes that are approximately 36 inches long x 24 inches high x 24 inches deep and can weigh up to 300 lbs.

All customs and clearance paperwork shall be completed by the contractor for each shipment.

4.0 ADMINISTRATION

The government technical point of contact for this requirement is:

LCDR Matt Ellis

Matthew.r.ellis@navy.mil (860)-694-2789

Mr. Edward Collette

Edward.collette@navy.mil

(860) 694-1342

5.0 PAYMENT

All shipments will be paid for using the Government Purchase Card (GPC). The card holder will be identified in the contract award.

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN
INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
1001
Destination
Government
Destination
Government
2001
Destination
Government
Destination
Government
3001
Destination
Government
Destination
Government
4001
Destination
Government
Destination
Government
5001
Destination
Government
Destination
Government

DELIVERY INFORMATION

CLIN
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
UIC
1001
POP 01-SEP-2013 TO

31-AUG-2014

N/A
N/A
2001
POP 01-SEP-2014 TO

31-AUG-2015

N/A
N/A
3001
POP 01-SEP-2015 TO

31-AUG-2016

N/A
N/A
4001
POP 01-SEP-2016 TO

31-AUG-2017

N/A
N/A
5001
POP 01-SEP-2017 TO

31-AUG-2018

N/A
N/A

CLAUSES INCORPORATED BY REFERENCE

52.212-1
Instructions to Offerors--Commercial Items
FEB 2012
52.217-5
Evaluation Of Options
JUL 1990
52.225-13
Restrictions on Certain Foreign Purchases
JUN 2008
52.247-34
F.O.B. Destination
NOV 1991
252.204-7003
Control Of Government Personnel Work Product
APR 1992

CLAUSES INCORPORATED BY FULL TEXT

PROSPECTIVE CONTRACTOR RESPONSIBILITY

In accordance with Federal Acquisition Regulation (FAR) Part 9.1, the Contracting Officer shall award contracts only to responsible offerors. No purchase or award shall be made unless the contracting officer makes an affirmative determination of responsibility.

To be determined responsible, a prospective contractor must have adequate financial resources to perform the contract, or the ability to obtain them. The contracting officer shall require acceptable evidence of the prospective contractor's current sound financial status, as well as the ability to obtain required resources if the need arises. In regard to resources, the contractor must be prepared to present acceptable evidence of subcontracts, commitments or explicit arrangement that will be in existence at the time of contract award, to rent, purchase, or otherwise acquire the needed facilities, equipment, services, materials, other resources, or personnel. Consideration of a prime contractor's compliance with limitations on subcontracting shall be taken into account for the time period covered by the contract base period or quantities, plus option periods or quantities, if such options are considered when evaluating offers for award.

Pursuant to FAR 9.104-4, the Contracting Officer reserves the right to request adequate evidence of responsibility on the part of any prospective subcontractor(s).

In the absence of information clearly indicating that the prospective contractor is responsible, the contracting officer shall make a determination of non-responsibility.

As a minimum requirement, all offerors must submit, as part of the original proposal, the following:

(1) Company's Financial Statement which includes Balance Sheet and Income Statement; and

(2) Point of Contact from their Bank or any financial institution with which they transact business.

(End of provision)

52.212-4 CONTRACT TERMS AND CONDITIONS-- COMMERCIAL ITEMS (JUNE 2013)

(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights (1) within a reasonable time after the defect was discovered or should have been discovered; and (2) before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.

(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.

(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.

(d) Disputes. This contract is subject to the Contract Disputes Act of 1978, as amended (41 U.S.C. 601-613). Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at FAR 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.

(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.

(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement or any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.

(g) Invoice.

(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include--

(i) Name and address of the Contractor;

(ii) Invoice date and number;

(iii) Contract number, contract line item number and, if applicable, the order number;

(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;

(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;

(vi) Terms of any discount for prompt payment offered;

(vii) Name and address of official to whom payment is to be sent;

(viii) Name, title, and phone number of person to notify in event of defective invoice; and

(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.

(x) Electronic funds transfer (EFT) banking information.

(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.

(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer--Central Contractor Registration, or 52.232-34, Payment by Electronic

Funds Transfer--Other Than Central Contractor Registration), or applicable agency procedures.

(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.

(2) Invoices will be handled in accordance with the Prompt Payment Act (31 U.S.C. 3903) and Office of Management and Budget (OMB) prompt payment regulations at 5 CFR part 1315.

(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.

(i) Payment.--

(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.

(2) Prompt payment. The Government will make payment in accordance with the Prompt Payment Act (31 U.S.C. 3903) and prompt payment regulations at 5 CFR part 1315.

(3) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212-5(b) for the appropriate EFT clause.

(4) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.

(5) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall--

(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the--

(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);

(B) Affected contract number and delivery order number, if applicable;

(C) Affected contract line item or subline item, if applicable; and

(D) Contractor point of contact.

(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.

(6) Interest.

(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in Section 611 of the Contract Disputes Act of 1978 (Public Law 95-563), which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the Secretary until the amount is paid.

(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.

(iii) Final decisions. The Contracting Officer will issue a final decision as required by 33.211 if--

(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;

(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or

(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see 32.607-2).

(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.

(v) Amounts shall be due at the earliest of the following dates:

(A) The date fixed under this contract.

(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.

(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on--

(A) The date on which the designated office receives payment from the Contractor;

(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or

(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.

(vii) The interest charge made under this clause may be reduced under the procedures prescribed in 32.608-2 of the Federal Acquisition Regulation in effect on the date of this contract.

(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon:

(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or

(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.

(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.

(l) Termination for the Government's convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor's records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.

(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.

(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the Government upon acceptance, regardless of when or where the Government takes physical possession.

(o) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.

(p) Limitation of liability. Except as otherwise provided by an express warranty, the Contractor will not be liable to the Government for consequential damages resulting from any defect or deficiencies in accepted items.

(q) Other compliances. The Contractor shall comply with all applicable Federal, State and local laws, executive orders, rules and regulations applicable to its performance under this contract.

(r) Compliance with laws unique to Government contracts. The Contractor agrees to comply with 31 U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain Federal contracts; 18 U.S.C. 431 relating to officials not to benefit; 40 U.S.C. 3701, et seq., Contract Work Hours and Safety Standards Act; 41 U.S.C. 51-58, Anti-Kickback Act of 1986; 41 U.S.C. 265 and 10 U.S.C. 2409 relating to whistleblower protections; 49 U.S.C. 40118, Fly American; and 41 U.S.C. 423 relating to procurement integrity.

(s) Order of precedence. Any inconsistencies in this solicitation or contract shall be resolved by giving precedence in the following order: (1) the schedule of supplies/services; (2) The Assignments, Disputes, Payments, Invoice, Other

Compliances, Compliance with Laws Unique to Government Contracts, and Unauthorized Obligations paragraphs of this clause; (3) the clause at 52.212-5; (4) addenda to this solicitation or contract, including any license agreements for computer software; (5) solicitation provisions if this is a solicitation; (6) other paragraphs of this clause; (7) the Standard Form 1449; (8) other documents, exhibits, and attachments; and (9) the specification.

(t) Central Contractor Registration (CCR). (1) Unless exempted by an addendum to this contract, the Contractor is responsible during performance and through final payment of any contract for the accuracy and completeness of the data within the CCR database, and for any liability resulting from the Government's reliance on inaccurate or incomplete data. To remain registered in the CCR database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the CCR database to ensure it is current, accurate and complete. Updating information in the CCR does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.

(2)(i) If a Contractor has legally changed its business name, “doing business as” name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in FAR subpart 42.12, the Contractor shall provide the responsible Contracting Officer a minimum of one business day's written notification of its intention to (A) change the name in the CCR database; (B) comply with the requirements of subpart 42.12; and (C) agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor must provide with the notification sufficient documentation to support the legally changed name.

(ii) If the Contractor fails to comply with the requirements of paragraph (t)(2)(i) of this clause, or fails to perform the agreement at paragraph (t)(2)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the CCR information that shows the Contractor to be other than the

Contractor indicated in the contract will be considered to be incorrect information within the meaning of the “Suspension of Payment” paragraph of the electronic funds transfer (EFT) clause of this contract.

(3) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in the CCR record to reflect an assignee for the purpose of assignment of claims (see Subpart 32.8, Assignment of Claims). Assignees shall be separately registered in the CCR database. Information provided to the Contractor's CCR record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the “Suspension of payment” paragraph of the EFT clause of this contract.

(4) Offerors and Contractors may obtain information on registration and annual confirmation requirements via CCR accessed through https://www.acquisition.gov or by calling 1-888-227-2423 or 269-961-5757.

(u) Unauthorized Obligations.

(1) Except as stated in paragraph (u)(2) of this clause, when any supply or service acquired under this contract is subject to any End User License Agreement (EULA), Terms of Service (TOS), or similar legal instrument or agreement, that includes any clause requiring the Government to indemnify the

Contractor or any person or entity for damages, costs, fees, or any other loss or liability that would create an Anti-Deficiency Act violation (31 U.S.C. 1341), the following shall govern:

(i) Any such clause is unenforceable against the Government.

(ii) Neither the Government nor any Government authorized end user shall be deemed to have agreed to such clause by virtue of it appearing in the EULA, TOS, or similar legal instrument or agreement. If the EULA, TOS, or similar legal instrument or agreement is invoked through an ``I agree'' click box or other comparable mechanism (e.g., ``click-wrap'' or ``browse-wrap'' agreements), execution does not bind the Government or any

Government authorized end user to such clause.

(iii) Any such clause is deemed to be stricken from the EULA, TOS, or similar legal instrument or agreement.

(2) Paragraph (u)(1) of this clause does not apply to indemnification by the Government that is expressly authorized by statute and specifically authorized under applicable agency regulations and procedures.

(End of clause)

52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS--COMMERCIAL ITEMS (JAN 2013)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(1) 52.222-50, Combating Trafficking in Persons (FEB 2009) (22 U.S.C. 7104(g)).

___ Alternate I (Aug 2007) of 52.222-50 (22 U.S.C. 7104(g)).

(2) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(3) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Pub. L. 108-77, 108-78).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)

___ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 253g and 10 U.S.C. 2402).

____ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Apr 2010) (Pub. L. 110-252, Title VI, Chapter 1 (41 U.S.C. 251 note)).

____ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (June 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

XX (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Aug 2012) (Pub. L. 109-282) (31 U.S.C. 6101 note).

___ (5) 52.204-11, American Recovery and Reinvestment Act—Reporting Requirements (Jul 2010) (Pub. L. 111-5).

XX (6) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Dec 2010) (31 U.S.C. 6101 note).

____ (7) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Feb 2012) (41 U.S.C. 2313).

____ (8) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (MAY 2012) (section 738 of Division C of Pub. L. 112-74, section 740 of Division C of Pub. L. 111-117, section 743 of Division D of Pub. L. 111-8, and section 745 of Division D of Pub. L. 110-161).

____ (9) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (NOV 2011) (15 U.S.C. 657a).

____ (10) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Jan 2011) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

____ (11) [Reserved]

____ (12)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2011) (15 U.S.C. 644).

____ (ii) Alternate I (NOV 2011).

____ (iii) Alternate II (NOV 2011).

____ (13)(i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).

____ (ii) Alternate I (Oct 1995) of 52.219-7.

____ (iii) Alternate II (Mar 2004) of 52.219-7.

____ (14) 52.219-8, Utilization of Small Business Concerns (Jan 2011) (15 U.S.C. 637(d)(2) and (3)).

____ (15)(i) 52.219-9, Small Business Subcontracting Plan (Jan 2011) (15 U.S.C. 637(d)(4)).

____ (ii) Alternate I (Oct 2001) of 52.219-9.

____ (iii) Alternate II (Oct 2001) of 52.219-9.

____ (iv) Alternate III (Jul 2010) of 52.219-9.

____ (16) 52.219-13, Notice of Set-Aside of Orders (NOV 2011) (15 U.S.C. 644(r)).

____ (17) 52.219-14, Limitations on Subcontracting (NOV 2011) (15 U.S.C. 637(a)(14)).

____ (18) 52.219-16, Liquidated Damages—Subcon-tracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)).

____ (19)(i) 52.219-23, Notice of Price Evaluation Adjustment for Small Disadvantaged Business Concerns (Oct 2008) (10 U.S.C. 2323) (if the offeror elects to waive the adjustment, it shall so indicate in its offer).

____ (ii) Alternate I (June 2003) of 52.219-23.

____ (20) 52.219-25, Small Disadvantaged Business Participation Program—Disadvantaged Status and Reporting (Dec 2010) (Pub. L. 103-355, section 7102, and 10 U.S.C. 2323).

____ (21) 52.219-26, Small Disadvantaged Business Participation Program— Incentive Subcontracting (Oct 2000) (Pub. L. 103-355, section 7102, and 10 U.S.C. 2323).

____ (22) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (NOV 2011) (15 U.S.C. 657f).

_XX_ (23) 52.219-28, Post Award Small Business Program Rerepresentation (Apr 2012) (15 U.S.C. 632(a)(2)).

____ (24) 52.219-29, Notice of Set-Aside for Economically Disadvantaged Women-Owned Small Business (EDWOSB) Concerns (APR 2012) (15 U.S.C. 637(m)).

____ (25) 52.219-30, Notice of Set-Aside for Women-Owned Small Business (WOSB) Concerns Eligible Under the WOSB Program (APR 2012) (15 U.S.C. 637(m)).

_XX_ (26) 52.222-3, Convict Labor (June 2003) (E.O. 11755).

_XX_ (27) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (MAR 2012) (E.O. 3126).

_XX_ (28) 52.222-21, Prohibition of Segregated Facilities (Feb 1999).

_XX_ (29) 52.222-26, Equal Opportunity (Mar 2007) (E.O. 11246).

____ (30) 52.222-35, Equal Opportunity for Veterans (Sep 2010)(38 U.S.C. 4212).

_XX_ (31) 52.222-36, Affirmative Action for Workers with Disabilities (Oct 2010) (29 U.S.C. 793).

____ (32) 52.222-37, Employment Reports on Veterans (Sep 2010) (38 U.S.C. 4212).

____ (33) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496).

____ (34) 52.222-54, Employment Eligibility Verification (Jul 2012). (Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)

____ (35)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (May 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

____ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

____ (36) 52.223-15, Energy Efficiency in Energy-Consuming Products (Dec 2007) (42 U.S.C. 8259b).

____ (37)(i) 52.223-16, IEEE 1680 Standard for the Environmental Assessment of Personal Computer Products (Dec 2007) (E.O. 13423).

____ (ii) Alternate I (Dec 2007) of 52.223-16.

_XX_ (38) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (Aug 2011) (E.O. 13513).

____ (39) 52.225-1, Buy American Act—Supplies (Feb 2009) (41 U.S.C. 10a-10d).

____(40)(i) 52.225-3, Buy American Act--Free Trade Agreements--Israeli Trade Act (NOV 2012) (41 U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43).

(ii) Alternate I (MAR 2012) of 52.225-3.

(iii) Alternate II (MAR 2012) of 52.225-3.

(iv) Alternate III (NOV 2012) of 52.225-3.

(41) 52.225-5, Trade Agreements (NOV 2012) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

____ (42) 52.225-13, Restrictions on Certain Foreign Purchases (June 2008) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

____ (43) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150

____ (44) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C. 5150).

____ (45) 52.232-29, Terms for Financing of Purchases of Commercial Items (Feb 2002) (41 U.S.C. 255(f), 10 U.S.C. 2307(f)).

____ (46) 52.232-30, Installment Payments for Commercial Items (Oct 1995) (41 U.S.C. 255(f), 10 U.S.C. 2307(f)).

_____(47) 52.232-33, Payment by Electronic Funds Transfer—Central Contractor Registration (Oct 2003) (31 U.S.C. 3332).

____ (48) 52.232-34, Payment by Electronic Funds Transfer—Other than Central Contractor Registration (May 1999) (31 U.S.C. 3332).

_XX_ (49) 52.232-36, Payment by Third Party (Feb 2010) (31 U.S.C. 3332).

____ (50) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).

____ (51)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631).

____ (ii) Alternate I (Apr 2003) of 52.247-64.

(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)

_____ (1) 52.222-41, Service Contract Act of 1965 (Nov 2007) (41 U.S.C. 351, et seq.).

_____ (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (May 1989) (29 U.S.C. 206 and 41 U.S.C. 351, et seq.).

_____ (3) 52.222-43, Fair Labor Standards Act and Service Contract Act—Price Adjustment (Multiple Year and Option Contracts) (Sep 2009) (29 U.S.C. 206 and 41 U.S.C. 351, et seq.).

_____ (4) 52.222-44, Fair Labor Standards Act and Service Contract Act—Price Adjustment (Sep 2009) (29 U.S.C. 206 and 41 U.S.C. 351, et seq.).

_____ (5) 52.222-51, Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment—Requirements (Nov 2007) (41 351, et seq.).

_____ (6) 52.222-53, Exemption from Application of the Service Contract Act to Contracts for Certain Services—Requirements (Feb 2009) (41 U.S.C. 351, et seq.).

_____ (7) 52.222-17, Nondisplacement of Qualified Workers (JAN 2013) (E.O.13495).

_____ (8) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (Mar 2009) (Pub. L. 110-247).

_____ (9) 52.237-11, Accepting and Dispensing of $1 Coin (Sept 2008) (31 U.S.C. 5112(p)(1)).

(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records--Negotiation.

(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor's directly pertinent records involving transactions related to this contract.

(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.

(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.

(e) (1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1)in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause—

(i) 52.203-13, Contractor Code of Business Ethics and Conduct (APR 2010) (Pub. L. 110-252, Title VI, Chapter 1 (41 U.S.C. 251 note).

(ii) 52.219-8, Utilization of Small Business Concerns (DEC 2010) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $650,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.

(iii) 52.222-17, Nondisplacement of Qualified Workers (JAN 2013) (E.O. 13495). Flow down required in accordance with paragraph (l) of FAR clause 52.222-17.

(iv) 52.222-26, Equal Opportunity (MAR 2007) (E.O. 11246).

(v) 52.222-35, Equal Opportunity for Veterans (SEP 2010) (38 U.S.C. 4212).

(vi) 52.222-36, Affirmative Action for Workers with Disabilities (OCT 1998) (29 U.S.C. 793).

(vii) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.

(viii) 52.222-41, Service Contract Act of 1965 (Nov 2007) (41 U.S.C. 351, et seq.).

(ix) 52.222-50, Combating Trafficking in Persons (FEB 2009) (22 U.S.C. 7104(g)).

Alternate I (AUG 2007) of 52.222-50 (22 U.S.C. 7104(g)).

(x) 52.222-51, Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (Nov 2007) (41 U.S.C. 351, et seq.).

(xi) 52.222-53, Exemption from Application of the Service Contract Act to Contracts for Certain Services--Requirements (FEB 2009) (41 U.S.C. 351, et seq.).

(xii) 52.222-54, Employment Eligibility Verification (JUL 2012).

(xiii) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations. (MAR 2009) (Pub. L. 110-247). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.

(xiv) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (FEB 2006) (46 U.S.C. Appx 1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.

(2) While not required, the contractor May include in its subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.

(End of clause)

52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)

The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 10 days prior to the expiration of the current contract period.

(End of clause)

52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)

(a) The Government may extend the term of this contract by written notice to the Contractor within 10 days; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 10 days before the contract expires. The preliminary notice does not commit the Government to an extension.

(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 66 months.

(End of clause)

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

FAR Clauses: http://acquisition.gov/comp/far/ DFARS Clauses: http://www.acq.osd.mil/dpap/dars/dfars/

(End of clause)

252.212-7001 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS APPLICABLE TO DEFENSE ACQUISITIONS OF COMMERCIAL ITEMS (MAY 2013)

(a) The Contractor agrees to comply with the following Federal Acquisition Regulation (FAR) clause which, if checked, is included in this contract by reference to implement a provision of law applicable to acquisitions of commercial items or components.

____ 52.203-3, Gratuities (APR 1984) (10 U.S.C. 2207).

(b) The Contractor agrees to comply with any clause that is checked on the following list of Defense FAR Supplement clauses which, if checked, is included in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items or components.

(1) _XX_ 252.203-7000, Requirements Relating to Compensation of Former DoD Officials (SEP 2011) (Section 847 of Pub. L. 110-181).

(2) ____ 252.203-7003, Agency Office of the Inspector General (DEC 2012)(section 6101 of Pub. L. 110-252, 41 U.S.C. 3509).

(3) ____ 252.205-7000, Provision of Information to Cooperative Agreement Holders (DEC 1991) (10 U.S.C. 2416).

(4) ____ 252.219-7003, Small Business Subcontracting Plan (DoD Contracts) (AUG 2012) (15 U.S.C. 637).

(5) ____ 252.219-7004, Small Business Subcontracting Plan (Test Program) (JAN 2011) (15 U.S.C. 637 note).

(6)(i) _XX___ 252.225-7001, Buy American and Balance of Payments Program (DEC 2012) (41 U.S.C. chapter 83, .O. 10582).

(ii) ____ Alternate I (OCT 2011) of 252.225-7001.

(7) ____ 252.225-7008, Restriction on Acquisition of Specialty Metals (MAR 2013) (10 U.S.C. 2533b).

(8) ____ 252.225-7009, Restriction on Acquisition of Certain Articles Containing Specialty Metals (MAR 2013) (10 U.S.C. 2533b).

(9) ____ 252.225-7012, Preference for Certain Domestic Commodities (FEB 2013) (10 U.S.C. 2533a).

(10) ____ 252.225-7015, Restriction on Acquisition of Hand or Measuring Tools (JUN 2005) (10 U.S.C. 2533a).

(11) ____ 252.225-7016, Restriction on Acquisition of Ball and Roller Bearings (JUN 2011) (Section 8065 of Pub. L. 107-117 and the same restriction in subsequent DoD appropriations acts).

12) ____ 252.225-7017, Photovoltaic Devices (DEC 2012) (Section 846 of Pub. L. 111-383).

13)(i) ____ 252.225-7021, Trade Agreements (DEC 2012) (19 U.S.C. 2501-2518 and 19 U.S.C. 3301 note).

(ii) ____ Alternate I (OCT 2011) of 252.225-7021.

(iii) ____ Alternate II (OCT 2011) of 252.225-7021.

(14) ____ 252.225-7027, Restriction on Contingent Fees for Foreign Military Sales (APR 2003) (22 U.S.C. 2779).

(15) ____ 252.225-7028, Exclusionary Policies and Practices of Foreign Governments (APR 2003) (22 U.S.C. 2755).

(16)(i) ____ 252.225-7036, Buy American Act—Free Trade Agreements—Balance of Payments Program (DEC 2012) (41 U.S.C. chapter 83 and 19 U.S.C. 3301 note).

(ii) ____ Alternate I (JUN 2012) of 252.225-7036.

(iii) ____ Alternate II (NOV 2012) of 252.225-7036.

(iv) ____ Alternate III (JUN 2012) of 252.225-7036.

(v) ____ Alternate IV (NOV 2012) of 252.225-7036.

(vi) ____Alternate V (NOV 2012) of 252.225-7036.

(17) ____ 252.225-7038, Restriction on Acquisition of Air Circuit Breakers (JUN 2005) (10 U.S.C. 2534(a)(3)).

(18) ____ 252.225-7039, Contractors Performing Private Security Functions (JUN 2012) (Section 862 of Pub. L. 110-181, as amended by section 853 of Pub. L. 110-417 and sections 831 and 832 of Pub. L. 111-383).

(19) ____ 252.226-7001, Utilization of Indian Organizations, Indian-Owned Economic Enterprises, and Native Hawaiian Small Business Concerns (SEP 2004) (Section 8021 of Pub. L. 107-248 and similar sections in subsequent DoD appropriations acts).

(20) ____ 252.227-7013, Rights in Technical Data--Noncommercial Items (MAY 2013), if applicable (see 227.7103-6(a)).

(21) ____ 252.227-7015, Technical Data—Commercial Items (MAY 2013) (10 U.S.C. 2320).

(22) ____ 252.227-7037, Validation of Restrictive Markings on Technical Data (JUN 2012), if applicable (see 227.7102-4(c)))(10 U.S.C. 2321).

(23) ____ 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports (MAR 2008) (10 U.S.C. 2227).

(24) ____ 252.237-7010, Prohibition on Interrogation of Detainees by Contractor Personnel (NOV 2010) (Section 1038 of Pub. L. 111-84)

(25) ____ 252.237-7019, Training for Contractor Personnel Interacting with Detainees (SEP 2006) (Section 1092 of Pub. L. 108-375).

(26) ____ 252.243-7002, Requests for Equitable Adjustment (DEC 2012) (10 U.S.C. 2410).

(27) ____ 252.246-7004, Safety of Facilities, Infrastructure, and Equipment For Military Operations (OCT 2010) (Section 807 of Pub. L. 111-84).

(28) ____ 252.247-7003, Pass-Through of Motor Carrier Fuel Surcharge Adjustment to the Cost Bearer (SEP 2010) (Section 884 of Pub. L. 110-417).

(29)(i) ____ 252.247-7023, Transportation of Supplies by Sea (MAY 2002) (10 U.S.C. 2631).

(ii) ____ Alternate I (MAR 2000) of 252.247-7023.

(iii) ____ Alternate II (MAR 2000) of 252.247-7023.

(iv) _XX_ Alternate III (MAY 2002) of 252.247-7023.

(30) ____ 252.247-7024, Notification of Transportation of Supplies by Sea (MAR (2000) (10 U.S.C. 2631).

(31) ____ 252.247-7027, Riding Gang Member Requirements (OCT 2011) (Section 3504 of Pub. L. 110-417).

c) In addition to the clauses listed in paragraph (e) of the Contract Terms and Conditions Required to Implement Statutes or Executive Orders--Commercial Items clause of this contract (FAR 52.212-5), the Contractor shall include the terms of the following clauses, if applicable, in subcontracts for commercial items or commercial components, awarded at any tier under this contract:

(1) 252.225-7039, Contractors Performing Private Security Functions (JUN 2012) (Section 862 of Pub. L. 110-181, as amended by section 853 of Pub. L. 110-417 and sections 831 and 832 of Pub. L. 111-383).

(2) 252.227-7013, Rights in Technical Data--Noncommercial Items (MAY 2013), if applicable (see 227.7103-6(a)).

(3) 252.227-7015, Technical Data--Commercial Items (MAY 2013), if applicable (see 227.7102-4(a)).

(4) 252.227-7037, Validation of Restrictive Markings on Technical Data (JUN 2012), if applicable (see 227.7102-4(c)).

(5) 252.237-7010, Prohibition on Interrogation of Detainees by Contractor Personnel (NOV 2010) (Section 1038 of Pub. L. 111-84).

(6) 252.237-7019, Training for Contractor Personnel Interacting with Detainees (SEP 2006) (Section 1092 of Pub. L. 108-375).

(7) 252.247-7003, Pass-Through of Motor Carrier Fuel Surcharge Adjustment to the Cost Bearer (SEP 2010) (Section 884 of Pub. L. 110-417).

(8) 252.247-7023, Transportation of Supplies by Sea (MAY 2002) (10 U.S.C. 2631).

(9) 252.247-7024, Notification of Transportation of Supplies by Sea (MAR 2000) (10 U.S.C. 2631).

(End of clause)

EVALUATION CRITERIA

Evaluation:

Contractors will be evaluated using the following criteria.

Technical: The contractor shall provide documentation with their quote showing how they plan to meet the following items.

1. Did the contractor provide proof that the carrier to be used to perform this effort is registered in the Civil Reserve Air Fleet (CFAR) Program.

2. Does contractor provide after hours and support Monday through Saturday.

3. Does contractor service all of the locations currently identified in the Statement of Work (SOW)

4. Does the contractor provide a Logistic Service Representative (LSR) or point of contact for coordination of shipments.

5. Does the contractor have 24/7 coordination capabilities.

6. Does the contractor have the capability to handle the weight requirements for this effort.

7. Does the contractor provide documentation showing that they can handle the total estimated number of shipments per month and per year.

8. Does the contractor accept Government Purchase Cards as a method of payment.

9. Is the…