N00183-13-T-0068_Amendment_0001.doc

DOC document 136 KB Posted

Attached to
Contractor shall provide maintenance and repair services for Ophthalmology equipment located at the Naval Hospital, Camp Lejeune, NC.
Solicitation number
N00183-13-T-0068
Issued by

About this file

The purpose of amendment N00183-13-T-0068-0001 is to revise the description. All else shall remain the same.

View the file

Other files

File Type Posted
N00183-13-T-0068-0002.doc DOC document
N00183-13-T-0068.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from Contractor shall provide maintenance and repair services for the equipment listed in Section C, Statement of Work. Maintenance and repair services shall be provided in accordance with Section C, Statement of Work. Contractor's quoted price shall be inclusive of all cost including labor, material, repair parts, at least two preventive maintenance visits annually, travel and shipping.Equipment location: Naval Hospital, Camp Lejeune, NC. POP: 10 Dec 2012 - 09 Dec 2013Billing/Payment in Arrears Monthly or Quarterly. to Contractor shall provide maintenance and repair services for the equipment listed in Section C, Statement of Work. Maintenance and repair services shall be provided in accordance with Section C, Statement of Work. Equipment is located at the Naval Hospital, Camp Lejeune, NC. Contractor's quoted price shall be inclusive of all cost including labor, material, repair parts, at least one preventative maintenance visit annually for the microscopes and at least two preventive maintenance visits annually for the phoropters and slit-lamps, travel and shipping.POP: 10 Dec 2012 - 09 Dec 2013Billing/Payment in Arrears Monthly or Quarterly..

CLIN 0002

The CLIN extended description has changed from Contractor shall provide maintenance and repair services for the equipment listed in Section C, Statement of Work. Maintenance and repair services shall be provided in accordance with Section C, Statement of Work. Contractor's quoted price shall be inclusive of all cost including labor, material, repair parts, at least two preventive maintenance visits annually, travel and shipping.Equipment location: Naval Hospital, Camp Lejeune, NC. POP: 10 Dec 2013 - 09 Dec 2014Billing/Payment in Arrears Monthly or Quarterly. to Contractor shall provide maintenance and repair services for the equipment listed in Section C, Statement of Work. Maintenance and repair services shall be provided in accordance with Section C, Statement of Work. Equipment is located at the Naval Hospital, Camp Lejeune, NC. Contractor's quoted price shall be inclusive of all cost including labor, material, repair parts, at least one preventative maintenance visit annually for the microscopes and at least two preventive maintenance visits annually for the phoropters and slit-lamps, travel and shipping.POP: 10 Dec 2013 - 09 Dec 2014Billing/Payment in Arrears Monthly or Quarterly..

CLIN 0003

The CLIN extended description has changed from Contractor shall provide maintenance and repair services for the equipment listed in Section C, Statement of Work. Maintenance and repair services shall be provided in accordance with Section C, Statement of Work. Contractor's quoted price shall be inclusive of all cost including labor, material, repair parts, at least two preventive maintenance visits annually, travel and shipping.Equipment location: Naval Hospital, Camp Lejeune, NC. POP: 10 Dec 2014 - 09 Dec 2015Billing/Payment in Arrears Monthly or Quarterly. to Contractor shall provide maintenance and repair services for the equipment listed in Section C, Statement of Work. Maintenance and repair services shall be provided in accordance with Section C, Statement of Work. Equipment is located at the Naval Hospital, Camp Lejeune, NC. Contractor's quoted price shall be inclusive of all cost including labor, material, repair parts, at least one preventative maintenance visit annually for the microscopes and at least two preventive maintenance visits annually for the phoropters and slit-lamps, travel and shipping.POP: 10 Dec 2014 - 09 Dec 2015Billing/Payment in Arrears Monthly or Quarterly..

CLIN 0004

The CLIN extended description has changed from Contractor shall provide maintenance and repair services for the equipment listed in Section C, Statement of Work. Maintenance and repair services shall be provided in accordance with Section C, Statement of Work. Contractor's quoted price shall be inclusive of all cost including labor, material, repair parts, at least two preventive maintenance visits annually, travel and shipping.Equipment location: Naval Hospital, Camp Lejeune, NC. POP: 10 Dec 2015 - 09 Dec 2016Billing/Payment in Arrears Monthly or Quarterly. to Contractor shall provide maintenance and repair services for the equipment listed in Section C, Statement of Work. Maintenance and repair services shall be provided in accordance with Section C, Statement of Work. Equipment is located at the Naval Hospital, Camp Lejeune, NC. Contractor's quoted price shall be inclusive of all cost including labor, material, repair parts, at least one preventative maintenance visit annually for the microscopes and at least two preventive maintenance visits annually for the phoropters and slit-lamps, travel and shipping.POP: 10 Dec 2015 - 09 Dec 2016Billing/Payment in Arrears Monthly or Quarterly..

CLIN 0005

The CLIN extended description has changed from Contractor shall provide maintenance and repair services for the equipment listed in Section C, Statement of Work. Maintenance and repair services shall be provided in accordance with Section C, Statement of Work. Contractor's quoted price shall be inclusive of all cost including labor, material, repair parts, at least two preventive maintenance visits annually, travel and shipping.Equipment location: Naval Hospital, Camp Lejeune, NC. POP: 10 Dec 2016 - 09 Dec 2017Billing/Payment in Arrears Monthly or Quarterly. to Contractor shall provide maintenance and repair services for the equipment listed in Section C, Statement of Work. Maintenance and repair services shall be provided in accordance with Section C, Statement of Work. Equipment is located at the Naval Hospital, Camp Lejeune, NC. Contractor's quoted price shall be inclusive of all cost including labor, material, repair parts, at least one preventative maintenance visit annually for the microscopes and at least two preventive maintenance visits annually for the phoropters and slit-lamps, travel and shipping.POP: 10 Dec 2016 - 09 Dec 2017Billing/Payment in Arrears Monthly or Quarterly..

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

STATEMENT OF WORK

Contractor shall provide maintenance and repair services for all items listed in Section B. Services shall include on-site corrective repairs during normal working hour coverage from (8:00 A.M. to 4:30 P.M. Monday through Friday excluding Federal holidays), 24-hour emergency service, installation of engineering updates and preventive maintenance services as recommended by the ORIGINAL EQUIPMENT MANUFACTURER (OEM) to clean, test and maintain Department of Defense owned equipment and/or system per OEM operating standards. Maintenance and repair services shall include all systems,, subsystem components, and assemblies, (i.e.: contractor shall be responsible for total maintenance of entire system). All replacement and repair parts shall be manufactured by the OEM. Substituted replacement and repair parts ARE NOT acceptable.

1. General

a. The Contractor shall comply with Federal, State, and Local Laws, plus any Federal Regulations as applicable to the performance of this contract.

b. The Contractor shall not accept any instructions issued by any person employed by the U. S. Government, other than: the Contracting Officer (KO) or designated representative all acting within the limits of their authority.

c. The Contractor shall be qualified / authorized by the Original Equipment Manufacturer (OEM) in the repair of all equipment listed within this contract. Contractor shall maintain qualifications throughout entire contract period. Qualification includes, but is not limited to, the certification of all repair persons and repair facilities by the OEM as being trained / qualified to perform required repairs. Qualifications must be current (within 2 years). The Government shall maintain the right to seek proof of qualification prior to award and anytime during contract period of performance.

2. Scope of Work

a. The Contractor shall provide trained, experienced, English speaking personnel, labor, tools, diagnostic equipment, software, test phantoms, material, supplies, transportation, parts and equipment necessary to perform Preventive Maintenance (PM), Calibration (CAL), Safety testing (ST) and corrective maintenance.

b. The Contractor shall provide telephonic communications with the Government to discuss technical matters relating to the performance of this contract. A systems operator will be made available to answer technical questions regarding system operations and applications.

c. Equipment listed in this contract will be maintained to meet the original equipment manufacturer’s (OEM’s) specifications.

d. Equipment and associated components shall be serviced as listed on: DD Form 1155, “Order for Supplies or Services”.

e. The Contractor Point of Contact (POC). The Contractor shall provide in writing the name and telephone number of a primary and alternate English-speaking individual to act as their representative for the scheduling and coordination of service calls, and to be responsible for the coordination of the contract with the Government.

3. Government furnished property, Materials and Services

a. The Contractor representative(s) at each site is encouraged to request a pre-maintenance inspection prior to the onset of the contract. As all apparent discrepancies must be identified upon submittal of quote, any and all claims must be received within 30 days of contract award or prior to contract start which ever occurs first. All non-apparent / hidden discrepancies must be identified no later that the first scheduled preventative maintenance.

Any claims resulting from hidden defects must be received within 30 days of first scheduled preventative maintenance. Any equipment found to be inoperable during this pre-maintenance inspection would be repaired using a separate purchase order. The cost of repairs shall not exceed contractor’s normal retail rate for required repairs. The government certifies that the equipment to be maintained under this contract will be in good operating condition on the effective date of this contract. For the purpose of this contract, the clause, “good operating condition” means the conditions necessary for the equipment to function as intended without corrective maintenance. The Contractor agrees to leave the equipment in good operating condition at the expiration of this contract. During the final week of this contract, the Government will make final inspection of the equipment. Any correction of deficiencies noted during this inspection shall be resolved prior to contract end. The Government reserves the right to request the repair (at no additional cost to the Government) of items identified with latten defects after contract termination, when it has been determined that defects either are a result of contractor’s performance or should have been discovered during normal performance of work under this contract.

b. The government will be responsible for maintaining the proper environment, including utilities and site requirements necessary for the system to function properly as specified by the OEM.

c. The Government will operate the system in accordance with the instruction manual provided by the OEM.

d. The Government will not be responsible for the damage or loss due to fire, theft, accident, or other disaster of Contractor supplies, materials, or for the personal belongings brought onto Government property by Contractor’s personnel.

4. Contractor Furnished Property and Material

a. The Contractor shall provide all service literature, reference publications, laptop computers and diagnostic software to be used by the contractor service technicians and as required for the completion of the services in accordance with this contract.

5. Replacement Parts

a. The Contractor shall have ready access to unique and/or high mortality replacement parts. All parts supplied shall be compatible with the existing system. In the event that replacements parts are required to be shipped. Shipping shall be performed in the fastest reasonable means possible (i.e., next day air) at no additional cost to the Government.

b. The Contractor shall at their expense; replace all worn or defective parts necessary to restore the equipment to 100% operational condition as specified by the OEM.

c. Contractor installed replacement parts shall become the property of the Government and the replaced malfunctioning part shall become the property of the Contractor. Replaced items shall be properly disposed of at no additional cost to the Government (contractor to pay all “environmental fees” where required).

d. Freight, postage, and storage charges associated with shipment and receipt of replacement parts, and the return of parts shall be the responsibility of the Contractor.

e. All replacement parts shall be new and certified as OEM replacement parts. In the event that new parts are not available, rebuilt parts and sub-assemblies are allowed provided that they are warranted to be free of defects for a period of time that meets or exceeds warranties of similar replacement parts. The contractor shall specifically annotate on the final Field Service report the use and identification of rebuilt parts and the period of warranty. When discrepancies occur, the Government will make the final determination on whether a replacement part is of equal or better quality.

f. The Contractor must include software revisions and updates (field service changes), which are required due to FDA, or manufacturer announced safety-hazard recall, to include FDA Year 2000 Compliance Directive, as part of the contract at no additional cost to the Government. Updates shall be performed as soon as possible after release, but no later than the first scheduled Preventative Maintenance Inspection after release. For any updates that have been identified as critical, or required for the proper operation of equipment by the OEM, contractor shall provide installation within 30 days of release regardless of Preventative Maintenance Schedules.

6. Contractor Report Requirements

a. During normal duty hours, Contracted Field Service Engineer (FSE) personnel shall check-in with the Biomedical Engineering Division upon arrival at the Government site and again prior to departure. (Biomedical Engineering located in Build-NH-100 1st floor; 910-450-4944). The Contractor FSEs shall personally notify Biomedical Engineering (BME) of problems that result in the equipment being left disabled upon their departure. After normal duty hours, Contractor FSE’s shall notify the Officer of the Day Desk (Bldg NH-100, Quarterdeck, 1st Floor) and the systems operator designated by BME.

b. The Contractor shall provide to BME a full service report within two (2) days after completion of all service performed. The service report shall include, but not be limited to: contract number, equipment description (model, serial number, equipment control number) contractor’s log number, detailed description of the service(s) performed, replacement part(s) information (part number, part value, nomenclature, unit price, manufacturer, if not OEM, and whether the part is new/used/reconditioned), the completion date and time, man-hours expended and the hourly rate normally charged for the type of service performed, model and serial numbers, and the name of the FSE performing the service. In the event that agents / sub-contractor’s are used in the performance of repairs, said agent shall be identified on the service report by company name and contact information (i.e., telephone number). Additionally contractor will be required to affix a tag on equipment upon the completion of a preventative maintenance inspection. Tag may either be a “sticker” or “hanging tag”. As a minimum the tag shall contain: the name of the contractor, technician performing inspection and date of inspection legibly printed.

7. Contractor Responsibility

a. The Contractor shall be responsible for the repair/replacement of damaged Government owned equipment and property due to the negligence of the Contractor or his representatives. All such replacement or repair shall be at the Contractor’s expense and shall be inspected to the satisfaction of the KO or appointed representative.

8. Preventive Maintenance Services

a. In accordance with Naval Medical Logistics Command (NAVMEDLOGCOM) Risk Assessment Criteria, preventive maintenance shall be performed in accordance with the Original Equipment Manufacturers (OEM) recommendations.

b. Preventive maintenance visits shall be performed as specified in Section B or as mutually agreed upon between the Government and the Contractor. The Contractor shall schedule and complete preventive maintenance services prior to the 15th of the selected month.

c. All test equipment used in the performance of this contract must be calibrated (if required / as required by manufacture of test equipment) and shall be in compliance with Joint Commission on Accreditation of Healthcare Organizations (JCAHO), Original Equipment Manufacturer (OEM) and Federal Drug Administration (FDA) standards as required.

9. Corrective Maintenance

a. Normal Working Hour Maintenance Coverage will be Monday through Friday, between 8:00 A.M. to 4:30 P.M. A contractor Service Tech shall respond via telephone within 2 hours after receipt of trouble call, and provide on-site service.

a. In the event that emergency service outside the normal working hours are required by the Government, additional work shall be billable to the Government at published commercial rates, and negotiated and approved by a Contracting Officer prior to services rendered.

b. Government request for corrective maintenance will be placed by BME, to the Contractor’s POC. Corrective Maintenance shall be completed during the hours specified in the contract.

c. The Contractor shall assign a unique Log/Reference Number to each Government request for corrective Maintenance.

d. Contractor’s response to requests for service may include telephone consultation with the equipment user/operator and a Contractor FSE. Telephone consultation shall: 1) provide instruction in determining operator error; 2) to determine the most likely cause of the problem; 3) to determine if resolution of the problem requires the dispatch of a FSE; and 4) to identify replacement parts likely to be required in order to return the equipment to 100% operational condition as specified by the OEM.

e. Contractor’s pricing shall be inclusive of all cost including parts, labor, travel and shipping, unless otherwise indicated. Any/all exclusions are listed as follows:

f. The Contractor shall have his/her own service manuals, specifications, schematic diagrams, and parts lists to assist in the evaluation/repair of all equipment included in this contract.

10. Removal of Government Property

a. Whenever the repair of equipment cannot be performed at the Government site as determined by the Contractor, the Contractor shall notify BME who will make arrangements for the Contractor to remove the item from Naval Hospital Camp Lejeune (i.e. obtain property pass for material) to the Contractor’s designated site. The Contractor may be required to sign a Government form accepting responsibility for the Government equipment. The Contractor shall provide a detailed description of removed items. For associated items / accessories, contractor to provide a detailed description and quantities of items to be removed. Description to include as a minimum manufacturers serial numbers and equipment control number (ECN) of all equipment / items removed. In the event that items / sub-assemblies / accessories are repaired via “Repair by Replacement” a detailed description of replaced items is to be included upon return of repaired components.

b. All charges resulting from a Contractor determined requirement to transport Government owned property, covered by this contract, to and from an alternate repair location shall be the responsibility of the Contractor.

11. Equipment Modification Upgrades

a. The Contractor shall only incorporate OEM specified modifications, alterations and upgrades. Approval shall be obtained from BME prior to the Contractor installation of any modification, alteration, or upgrades.

b. The Contractor shall maintain contact with the OEM to determine the requirement for field modifications and to ensure accomplishment of these modifications in accordance with the time schedule set forth by the OEM.

c. The Government shall not alter the system without prior notification to the Contractor.

d. The Contractor at no additional cost shall provide software updates to the Government. Installation of updates will be left to the discretion of the Government. All supplied software is to be warranted current and free of defects such as viruses.

12. Service Beyond the Scope of the Contract

a. The Contractor shall immediately, but not later than 24 consecutive hours after discovery, notify BME, in writing, of the existence or the development of any defects in, or repair required to the scheduled equipment, which the Contractor considers they are not responsible for under the terms of this contract.

b. At the same time of the notification, the Contractor shall furnish BME with written estimate of the cost to make the necessary repairs. Repairs considered by the Contracting Officer to be outside the scope of this contract shall not be covered under this contract, but shall be ordered under a separate purchase order.

13. Equipment list as follows:

a. The Contractor shall provide annual pricing to provide maintenance and repair services for the following equipment. Pricing quoted by the Contractor shall be incluside of all services requested in Section B and Section C.

Equipment
Hospital ECN
Model Number
Serial Number
Equipment Location
Qty
Annual Cost
Microscope
096728
E400
670964
Camp Johnson
1
Microscope
0M0616
BH2
224802
Wayne Caron
1
Microscope
093521
E400
675487
French Creek
1
Microscope
093367
Axioskop 40
3308003047
MCAS
1
Microscope
084398
E200
761836
Camp Geiger
1
Microscope
0M0691
Labophot-2
436310
Camp Johnson
1
Microscope
0M0932
CHS
9K0092
Ind Hy
1
Microscope
085250
BX-51
3D10696
Ind Hy
1
Microscope
096379
SZ40
33C0776
Ind Hy
1
Microscope
093360
Axioskop 40
3308003017
Prev Med
1
Microscope
0M1528
Labophot-2
451616
Prev Med
1
Microscope
091219
BX45TF
4J20497
Prev Med
1
Microscope
106296
CX41RF
9L06325
Nursery
1
Microscope
091619
BX41
5B20144
Nursery
1
Microscope
083781
BX40F-3
5M04119
BDC
1
Microscope
099252
BX40F
4H06851
Fam Prac
1
Microscope
100142
30025
70010
Fam Prac
1
Microscope
0M0867
410
18004-2
Gyn Clinic
1
Microscope
083585
BH-2
229215
Derm
1
Microscope
099964
M4000D
020224H
Derm
1
Microscope
083586
BH-2
228060
Derm
1
Microscope
0M0054
Labophot-2
442184
Derm
1
Microscope
092431
BX45TF
5E18802
Lab
1
Microscope
0M1532
BX40F
3H08009
Lab
1
Microscope
0M0366
BH2
228561
Lab
1
Microscope
0M0505
XSG-109L
S980458
Lab
1
Microscope
0M0571
Alphaphoto-2
U1104781
Lab
1
Microscope
094061
Axioskop 40
3308002050
Lab
1
Microscope
093428
BX51TF
5H20697
Lab
1
Microscope
092434
BX45TF
5E21106
Lab
1
Microscope
0M1525
Labophot-2
451727
Lab
1
Microscope
092435
BX45TF
5E16006
Lab
1
Microscope
093863
Axioskop 40
3308003118
Lab
1
Microscope
087627
BX45TF
4D16722
Lab
1
Microscope
092524
BX51TF
5E18552
Lab
1
Microscope
093427
BX51TF
5J18600
Lab
1
Microscope
093864
Axioskop 40
3308002076
Lab
1
Microscope
107588
BX41TF
0L52544
Lab
1
Microscope
107260
BX41TF
0J66415
Lab
1
Microscope
108255
BX51TF
1D04945
Lab
1
Microscope
093362
Axioskop 40
3308003026
Lab
1
Microscope
107283
BX41TF
0J66040
Lab
1
Microscope
107261
BX41TF
0J66420
Lab
1
Microscope
107589
BX41TF
0L53368
Lab
1
Phoropter
096141
11625B
37550-01
Eye Clinic
2
Phoropter
0M1495
11625
8A35213
Eye Clinic
2
Phoropter
0M1519
11325
8A35207
Eye Clinic
2
Slit Lamp
084259
900
900.2.1.90080
Eye Clinic
2
Slit Lamp
084735
900
900.2.1.91064
Eye Clinic
2
Slit Lamp
084787
900
900.2.1.88966
Eye Clinic
2
Slit Lamp
097805
900
11297
Eye Clinic
2
Slit Lamp
097806
900
11296
Eye Clinic
2
Slit Lamp
097807
900
11293
Eye Clinic
2
Slit Lamp
0M1504
900
B90039718
Eye Clinic
2
Slit Lamp
107443
G-5
09D0016
Bldg 15
1
Slit Lamp
107488
G-5
10D0078
Bldg 15
1
Slit Lamp
107629
G-5
07H0128
Bldg 15
1
Slit Lamp
107647
G-5
07H0127
Bldg 15
1
Slit Lamp
098146
G-5
0710K12
MCAS
1

(End of Summary of Changes)

File details come from the government source that posted it. Updated .