FAQ (betaSAM).pdf
PDF 225 KB Posted
- Attached to
- 0216-02 - UAS Ground Control System Federal contract opportunity
- Solicitation number
- N0017822Q6745
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Technical Reqts List.xlsx | XLSX spreadsheet | |
| SOW.pdf | ||
| N0017822Q6745 (SF18).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. What UAS platform will this Ground Station be utilized with? Assuming DJI based on the technical requirements.
If so, what model?
a. Multiple Platforms, DJI and non-DJI, all COTS versions in the Class with Phantoms, Mavics as examples.
2. Does the system require a UPS of any type or is direct power sufficient?
a. No UPS Required
3. In reference to the system operation and maintenance training, what level of documentation would you like.
Personally, I'd want to provide in-depth documentation, at least to the point that's applicable.
a. In-depth if fine, should be based on a trained/certified pilot being the operator.
4. Is there any software that requires license keys to run the UAS system that we will need to acquire from other companies. I see the DJI Interface, but is there any additional not listed? These could include things like autopilot, video software, etc.
a. No
5. In regards to network switches. How many free ports do you need for pushing video to other sources, adding in additional systems, etc?
a. 4
6. Will you be providing any Government Furnished Equipment that is specific to the UAS system that will need to be integrated (antennas, PGCS systems, etc)?
a. No, GCS will be integrated into a mobile command trailer with a dedicated operator station.
7. I don't see it listed, but do you need a Kraken or another type of video management system to compress and push video feed to other customers?
a. No
8. Do you want the computer system to have wifi capabilities?
a. No
9. If we can do it in a smaller configuration, is that acceptable or do you want/require the larger form factor?
a. GCS will be integrated into a mobile command trailer with a dedicated operator station, controls need to be able to be mounted on a desktop.