400 FOOT TOWER REPAIRS & INSPECTION

STATEMENT OF WORK

1.0 INTRODUCTION

The Naval Surface Warfare System, Dahlgren Division (NSWCDD), has a requirement to replace the lighting system, safety climb, and perform annual inspection on existing 400-foot self-supporting tower.

2.0 APPLICABLE DOCUMENTS

2.1NSWCDD Ascending 400ft Tower Standard Operating Procedures (SOP) (attached for reference);
2.2Expected Visitor Form (attached);
2.3Access Vetting Form (attached); and
2.4Federal Aviation Administration (FAA) Advisory Circular (AC) 70/7460-1L, Subject: Obstruction Marking and Lighting, dated 17 August 2018 (attached for reference).
3.0REQUIREMENTS
3.1The contractor must complete the attached access/vetting forms and have them cleared through base security prior to gaining access to the base and commencing work.
3.2The contractor shall provide Lockout/Tagout (LOTO) procedures.
3.3The contractor shall provide documentation of fall training records, LOTO training records.
3.4The contractor shall provide current physical of all climbers that will be going aloft.
3.5The contractor shall provide all materials, personnel, and labor to complete the following:
3.5.1The contractor shall install new S.O cables (oil resistant service cord), to the new beacons and wire the cable to the new controllers to include attaching all cable to tower per manufactures recommendations.
3.5.2The contractor shall remove existing (non-OSHA compliant) rail system and replace with new safety climb system.
3.5.3The contractor shall perform annual safety inspection of the 400’ self-supporting tower.
3.5.4The contractor shall straighten all existing antennas due to storm damage.
3.5.5The contractor shall replace existing (non-working) lighting system with new LED dual beacons and new flash technology controllers.
3.6The contractor shall coordinate with the technical point of contact (TPOC) listed below for access to the site for work completion.
4.0DATA DELIVERABLES
4.1The contractor shall provide an Acceptance Inspection Equipment Report (CDRL A001); and
4.2The contractor shall provide a Repairable Item Inspection Report (CDRL A002).
5.0GOVERNMENT FURNISHED EQUIPMENT

The government will provide access to the NSWCDD tower site as required for work requirements to be completed.

6.0 TRAVEL

The contractor will be required to travel in performance of this contract. The number of trips and types of personnel traveling shall be limited to the minimum required to accomplish work requirements and shall be coordinated with the technical point of contact. All travel shall be conducted in accordance with Federal Travel Regulations (FTR). Travel for up to four (4) personnel to Dahlgren, Virginia throughout the period of performance is anticipated to complete the work.

7.0 TECHNICAL POINT OF CONTACT

To be provided at time of award.