Amend_01_to_14-R-1010_TSM_Buoy.pdf
PDF 358 KB Posted
- Attached to
- 20 - Buoys Federal contract opportunity
- Solicitation number
- N00178-14-R-1010
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| TSM_CDRL_A008.pdf | ||
| TSM_CDRL_A006.pdf | ||
| TSM_CDRL_A003.pdf | ||
| SOLICITATION_N00178-14-R-1010.pdf | ||
| TSM_CDRL_A002.pdf | ||
| TSM_CDRL_A004.pdf | ||
| TSM_CDRL_A007.pdf | ||
| TSM_CDRL_A001.pdf | ||
| TSM_CDRL_A005.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
This amendment deletes the previous Statement of Work and replaces it w ith the enclosed Statement of Work.
The closing date for submission of offers shall be 21 JULY 2014 @ NOON.
Contract Data Requirements List (DD Form 1423-1) CDRL A008 “Corrosion Prevention and Control Plan is added to the requirement/solicitation as Exhibit H is attached to this amendment as enclosure (1).
1. CONTRACT ID CODE PAGE OF PAGES
1 9
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 03-Jul-2014
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N00178-14-R-1010
X 9B. DATED (SEE ITEM 11)
24-Apr-2014
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
03-Jul-2014
CODE
NSWCDD
ATTN: CS20-4
ROBERTA.MOSS@NAVY.MIL
17632 DAHLGREN ROAD STE 157
DAHLGREN VA 22448-5110
N00178 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N00178-14-R-1010
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
SPECIFICATIONS
PERFORMANCE WORK STATEMENT
SECTION C – DESCRIPTION/SPECIFICATION/WORK STATEMENT
C.1 SCOPE
This Statement of Work (SOW) defines the effort required for the design, development, manufacture and testing of a Spar - Tactical Sensor Mast (TSM), a moored sensor platform, with a backhaul data communication system. It includes associated program management, system documentation, and test support requirements.
C.1.1 BACKGROUND
The TSM is a moored sensor platform that hosts air, surface, and subsurface maritime domain awareness sensors at strategically important locations in coastal environments. The TSM will incorporate a passively stabilized mast with low pitch and roll motions to collect data from 30 pounds of sensors at a nominal elevation of 20 feet above sea level. A backhaul data communication system will be employed to offload a multitude of streaming data from the sensors through a standard Transmission Control Protocol/Internet Protocol Version 4 (TCP/IPv4) connection.
The TSM will provide enhanced maritime security at strategically and tactically important locations. The low pitch and roll motions enable high resolution air, surface and subsea data under varying environmental conditions. The low cost and high persistence of this system make it very attractive when compared with ship-based systems. The payoff is increased maritime domain awareness at reduced cost. Rapid global deployment is possible using existing Navy and commercial vessels.
The TSM will increase threat standoff, expand communications capabilities, enable earlier detection and support interdiction of threats, feed the larger global maritime domain awareness networks, and be the experimental platform from which a new generation of sensors and interdiction systems can be tested and ultimately fielded.
C.2 APPLICABLE DOCUMENTS
C.2.1 System Requirements Specification for the Spar – Tactical Sensor Mast (TSM) with Backhaul Data Communication System.
C.3 REQUIREMENTS
The work required by this contract will be performed in accordance with the System Requirements Specification for the Spar - Tactical Sensor Mast (TSM) with Backhaul Data Communication System, hereafter referred to as the System Specification, and this Statement of Work (SOW).
C.3.1 DESIGN, ENGINEERING AND FABRICATION
C.3.1.1 The contractor shall design and develop a prototype TSM equipped with a backhaul data communication system to meet the performance criteria specified by the System Specification.
C.3.1.2 The contractor shall determine all Coast Guard and other regulatory requirements for deployments of the TSM in a Continental United States (CONUS) coastal location and identify how the TSM will meet these requirements. (CDRL A001)
C.3.1.3 The contractor shall conduct a Critical Design Review (CDR) at its own facility. The CDR will be attended by up to ten (10) Government personnel. At the CDR, the contractor shall formally present the TSM design and any potential issues. The contractor shall incorporate all design changes approved during the CDR into the final design. (CDRL A002)
C.3.1.4 The contractor shall manufacture one (1) prototype TSM equipped with a backhaul data communication system according to the approved final design.
C.3.1.5 The contractor shall provide an official contractor certification that the TSM meets all Coast Guard and other regulatory requirements for deployment of the TSM in a CONUS coastal location
. (CDRL A003)
C.3.1.6 The contractor shall provide a Corrosion Prevention and Control Plan that describes the specific corrosion prevention and control measures to be implemented for the purpose of controlling corrosion of the TSM and the backhaul data communication system components. (CDRL A008)
C.3.2 FACTORY ACCEPTANCE TEST (FAT)
The contractor shall develop and execute a Factory Acceptance Test (FAT) for the TSM and backhaul system to demonstrate the key design elements of the TSM and the capability of the backhaul system.
The TSM shall be subjected to a FAT at the contractor’s location. The Government will install and operate sensor measurement devices and sensors on the TSM during the FAT. (CDRL A004, CDRL A005)
C.3.3 TSM DELIVERY
The contractor shall deliver the TSM and the backhaul data communication system to the Government upon completion of the Factory Acceptance Test (FAT).
C.3.4 SIX-MONTH FIELD TEST (OPTIONAL CLIN 2)
The Government shall have the option to obtain the contractor’s support during a six-month field test of the TSM. During this field test, the Government shall install up to 30 pounds of sensor equipment on the TSM, and shall operate and collect data from the sensors continuously for a period of six months. If this option is exercised, the following requirements shall apply.
C.3.4.1 Following the Government installation of sensors on the TSM, the contractor shall transport the TSM to the test site and moor the TSM in water at least 50 feet deep at a CONUS location selected by the contractor. The field test location must be approved by the Government to ensure that it adequately represents typical operating conditions for the TSM.
C.3.4.2 The contractor shall visit the TSM at least once every 30 days during the six-month test period to ensure that the TSM equipment and the backhaul data communication system equipment are operating properly, and to refuel the TSM if necessary. The contractor shall provide all fuel required by the TSM during the six-month test period.
C.3.4.3 The contractor shall participate in a 30-minute teleconference with the Government once per week during the six-month test period to review the TSM status and the backhaul data communication system status, and to address any technical issues.
C.3.4.4 Upon completion of the six-month field test, the contractor shall remove the TSM from the water and allow the Government to recover the sensor equipment. The contractor shall replace all mooring equipment on the TSM with new mooring equipment, and then return the TSM and the backhaul data communication system to the Government.
C.3.5 DOCUMENTATION
The contractor shall develop instructions for the operation, maintenance, transportation and deployment of the TSM including the backhaul data communication system, including any safety considerations. Operational instructions must include instructions for the TSM mooring, unmooring and mooring equipment replacement operations, as well as the typical time, manpower and tools/equipment required to replace the mooring equipment on the buoy. Transportation instructions must address loading, unloading and transporting the TSM on a flatbed truck, flatbed railcar, and the deck of a ship. Deployment instructions must address deploying the TSM from the shore and into the water, and removing the TSM from the water and onto the shore. (CDRL A006)
C.3.6 PROGRAM MANAGEMENT
The contractor shall monitor technical progress and schedule related to the project. (CDRL A007)
C.4 DELIVERY SCHEDULE
1. Critical Design Review 30 DAC
2. Construction Complete 120 DAC
3. Factory Acceptance Test (FAT) 150 DAC (Note: Government may postpone FAT up to 60 days to achieve better weather conditions for FAT)
4. Deliver TSM to Government 30 days after completion of FAT
5. Begin Six-Month Field Test 30 days after completion of FAT
6. Six-Month Field Test Complete 210 days after completion of FAT
SYSTEM REQUIREMENTS SPECIFICATION FOR THE
SPAR – TACTICAL SENSOR MAST (TSM) WITH BACKHAUL DATA COMMUNICATION SYSTEM
1. TACTICAL SENSOR MAST (TSM) REQUIREMENTS
1.1 The TSM shall have a vertical mast that supports 30 pounds of sensors on a platform at the top of the mast which is 20 feet above the water level.
1.2 The platform at the top of the mast shall have a sensor mounting plate that is 12 inches square, with a 10 inch square bolt pattern with 5/8 inch through bolts.
1.3 The buoy platform at the base of the mast shall be large enough to allow one 250 lb. person to walk safely completely around the mast. This buoy platform shall be equipped with four sensor mounting plates (one in each quadrant) which are identical in size and bolt pattern to the sensor mounting plate at the top of the mast.
1.4 The mast shall be telescoping to provide both a stowed configuration and a deployed configuration. In the stowed configuration, the height of the mast from the buoy platform to the sensor mounting plate shall be less than 5 feet. The mast shall be capable of being lowered to the stowed configuration while the buoy is in the water to allow for maintenance of the sensors on the sensor mounting plate.
1.5 The mast shall be passively stabilized to provide the following minimum requirements from Sea State 0 up to and including World Meteorological Organization (WMO) Sea State 4:
1.5.1 The mast shall not exceed 60 degrees per second in pitch, roll, or yaw speed.
1.5.2 The mast shall not exceed 60 degrees per second squared in pitch, roll, or yaw acceleration.
1.5.3 The mast shall not exceed an angle of more than 45 degrees in any direction with respect to horizon.
1.6 The TSM shall survive intact through World Meteorological Organization (WMO) Sea State 6. In the event that the TSM is damaged or sunk, the TSM shall be designed to be recoverable in order to minimize water hazards.
1.7 The TSM shall be equipped with shallow water mooring equipment, enabling it to be moored in water depths from 50 to 100 feet. The moorings shall be designed to hold the TSM in place through World Meteorological Organization (WMO) Sea State 6 conditions. The mooring equipment shall be easily replaceable with new mooring equipment.
1.8 The TSM shall provide a minimum of 1,000 watts (or 1 kilowatt) of continuous power for the sensors for at least 30 days without refueling. The TSM shall also be capable of producing a minimum of 6,000 watts (or 6 kilowatts) of power intermittently for at least 5% of the 30-day period without refueling.
1.9 The TSM shall provide both 12 VDC and 24 VDC outputs for the sensor equipment.
1.10 The TSM shall have an Operational Availability above 90% over one year.
1.11 The TSM shall be designed to operate for at least 30 days between any required maintenance or refueling operations.
1.12 The TSM shall provide protection to minimize water contamination in the event of corrosion or damage to fuel tanks or other buoy components.
1.13 The TSM shall meet all Coast Guard and other regulatory requirements for deployment of the TSM in a CONUS coastal location . Any required signage or lighting on the TSM shall not interfere with the mounting or operation of the sensors on the TSM.
1.14 The TSM shall be equipped with methods to minimize electrolysis and corrosion for a period of at least 6 months without maintenance.
1.15 The contractor shall provide an appropriate fixture for transporting the TSM on a flatbed truck, flatbed railcar, and the deck of a ship.
1.16 The TSM shall be designed such that it can be towed while in the water.
2. BACKHAUL DATA COMMUNICATION SYSTEM REQUIREMENTS
In addition to the physical construction of the TSM buoy, design and construction of a backhaul data communication system is also required. This backhaul system is necessary to offload a multitude of streaming data from various sensor arrays from various fielded TSM buoys through a TCP/IP connection utilizing a standard Ethernet port (RJ45 connector). The TSM buoys may be placed in a variety of locations around the globe ranging from just off shore to deep sea environments.
Two requirement scenarios are specified below. The first scenario allows for higher throughput when the TSM buoy is within Line of Sight (LoS) of the receiving ground station or another node in a mesh network configuration in which at least one part of the network is within LoS of the ground station.
Additional requirements are specified for the Non-Line of Sight (NLoS) scenario where a lower bandwidth is permitted as a tradeoff for global connectivity. A satellite communications (SATCOM) solution would be an example of a NLoS system.
The following requirements are necessary for the functionality, reliability and security of the backhaul data communication system.
2.1 GENERAL SYSTEM-WIDE REQUIREMENTS FOR BACKHAUL SYSTEM
2.1.1 The backhaul system shall provide the capability to be pre-configured before fielding, such that deployment of the system only requires the system to be powered on in order to connect and fully function.
2.1.2 The backhaul system shall not have any reoccurring license fees.
2.1.3 The backhaul system shall be configurable by the end user without the need for third party assistance.
2.1.4 The backhaul system shall be self-monitoring and provide Built-In Test (BIT) capabilities.
2.1.5 The backhaul system shall be FCC licensed prior to demonstration and/or delivery of the system.
2.1.6 The backhaul solution must utilize existing technology that has been fielded and which has demonstrated that it achieves its published performance characteristics under its advertised operational conditions. Emerging technologies and not-yet-mature technologies without a service record will not be considered a viable solution.
2.1.7 The backhaul system shall be properly shielded for continuous and prolonged exposure to seawater and weathering conditions in accordance with maritime environments up to and including World Meteorological Organization (WMO) Sea State 6.
2.1.8 In the event that both LoS and NLoS solutions are used to satisfy coverage and performance, the backhaul system shall automatically determine if a LoS route is available and give preference to that mode of communication. The system shall utilize a NLoS solution as an automatic backup should a LoS link not be available for any reason, without interrupting data connectivity and without any intervention from the user of the system past initial configuration.
2.1.9 The backhaul system shall provide a single data entry point on each end of the backhaul link utilizing a standard Ethernet connection. The Ethernet connection must support 100BASE-TX and 10BASE-T speeds utilizing an RJ45 Connector (Standard Ethernet pinout). This connection must support TCP/IPv4 with minimum link speeds of 10 Mbps and 100 Mbps capable. In utilizing both the LoS and NLoS solutions, selection and switching between LoS and NLoS shall be transparent to the devices connecting externally on each end of the backhaul link, and switching shall occur without service interruption. In the event that a single connection solution is used, that connection shall utilize the Ethernet connection described here. All Ethernet lines shall be certified CAT5e or CAT6 or above.
2.2 LINE OF SIGHT (LoS) REQUIREMENTS FOR BACKHAUL SYSTEM
A Line of Sight (LoS) radio frequency (RF) link depends on numerous unpredictable variables that cannot be specified without considering each individual setup. However, the following LoS requirements are necessary to provide the desired nominal distance performance of the backhaul data communication system.
2.2.1 The LoS system shall be capable of a minimum link distance of at least 10 km over sea water between any two devices, given clear atmospheric conditions and appropriate Line of Sight with or without the use of height enhancing structures on either end.
2.2.2 The LoS system shall employ a method of mesh network connectivity with other LoS systems of the same type.
2.2.3 The LoS system shall have a minimum link speed of 4.7 Mbps under optimum conditions.
2.2.5 The LoS system shall support externally connected antennas on the TSM in order to accommodate the flexible placement of said antennas on the TSM.
2.2.6 Given the LoS system has been pre-configured, the system shall be designed to come up to full operation upon the application of power to its power supply lines with no other interaction.
2.2.7 The LoS system shall be tolerant of sudden disconnection and reconnection of supply power as a regular means of powering down and powering up the system.
2.2.8 The LoS system shall be able to run continuously and indefinitely for the lifetime of the system given adequate power, with no more than one power cycle per 30 days to fix errors. A power cycle is defined as disconnecting power to the power source lines and after 5 seconds reconnecting the power source.
2.2.9 The LoS system shall be able to maintain a connection in conditions up to and including World Meteorological Organization (WMO) Sea State 4.
2.3 NON-LINE OF SIGHT (NLoS) REQUIREMENTS FOR BACKHAUL SYSTEM
2.3.1 The NLoS system shall be operational globally with the exception of arctic regions traditionally inaccessible by geosynchronous satellites due to angle of incidence to the earth’s surface from the satellites.
2.3.2 The NLoS system shall have a minimum link speed of 0.490 Mbps under optimal conditions.
2.3.3 Given the NLoS system has been pre-configured, the system shall be designed to come up to full operation upon the application of power to its power supply lines with no other interaction.
2.3.4 The NLoS system shall be tolerant of sudden disconnection and reconnection of supply power as a regular means of powering down and powering up the system.
2.3.5 The NLoS system shall be able to run continuously and indefinitely for the lifetime of the system given adequate power, with no more than one power cycle per 30 days to fix errors. A power cycle is defined as disconnecting power to the power source lines and after 5 seconds reconnecting the power source.
2.3.6 The NLoS system shall be able to maintain a connection in conditions up to and including World Meteorological Organization (WMO) Sea State 4.
Contract Data Requirements List (DD Form 1423-1) CDRL A008 “Corrosion Prevention and Control Plan is added to the requirement/solicitation as Exhibit H is attached to this amendment as enclosure (1)
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
Ddl-J10 LIST OF ATTACHMENTS
CDRLs for the TSM-Prototype Buoy
Exhibit A - DD FORM 1423-1 Contract Data Requirements List, DI-MISC-80508B, A001, Technical Reports –
Study/Services, 1 page
Exhibit B - DD FORM 1423-1 Contract Data Requirements List, DI-ADMIN-81373, A002, Presentation Material, 1 page
Exhibit C - DD FORM 1423-1 Contract Data Requirements List, DI-MISC-80678, A003, Certification/Data Report, 1 page
Exhibit D - DD FORM 1423-1 Contract Data Requirements List, DI-QCIC-80553A, A004, Acceptance Test Plan, 1
Exhibit E - DD FORM 1423-1 Contract Data Requirements List, DI-QCIC-81891, A005, Acceptance Test Report, 1
Exhibit F - DD FORM 1423-1 Contract Data Requirements List, DI-MISC-81414, A006, Operation and
Maintenance Instructions for Research and Development (R&D) Equipment, 1 page
Exhibit G - DD FORM 1423-1 Contract Data Requirements List, DI-MGMT-80368A, A007, Status Report, 1 page
Exhibit H – DD FORM 1423-1 Contract Data Requirements List, DI-MFFP-81403, Corrosion Prevention and
Control Plan, 1 page
(End of Summary of Changes)
File details come from the government source that posted it. Updated .