FAST AIR TARGET ENCOUNTER PENETRATION (FATEPEN) IMPROVEMENT AND SUPPORT
STATEMENT OF WORK (SOW)
1.0 SCOPE
1.1 Background
Fast Air Target Encounter Penetration (FATEPEN) has been developed, supported, and maintained by the Joint Technical Coordinating Group for Munitions Effectiveness (JTCG/ME). FATEPEN is a ballistics impact model capable of predicting the penetration by warhead fragment and rod type impactors engaging fixed-wing aircraft, rotary-wing aircraft, missiles, ground-mobile, small watercraft, and similar light tactical targets. FATEPEN is the standard penetration methodology for assessing fragments against any foreign targets and is also the predominant methodology for evaluating survivability of US vehicles.
1.2 Objective
The objective of this task is to support the FATEPEN Model Manager (MM) in performing improvements to FATEPEN.
2.0 APPLICABLE DOCUMENTS:
None
3.0 REQUIREMENTS
3.1 The contractor shall provide the personnel, materials and equipment necessary to conduct the following tasks and subtasks:
3.1.1 Residual Speed Curve Correlation Review: The contractor shall provide a review of testing processes, definitions and data for the correlation of current residual methodology with focus on the intersection with the ballistic limit point.
3.1.2 The contractor shall ensure the review includes a review of accuracy of the residual velocity as it correlates with impact speed.
| 3.2 | On-going Methodology Improvements: The contractor shall respond to queries regarding issues and make on-going minor improvements to FATEPEN as identified by the MM during the course of the contract. |
| 3.2.1 | These improvements shall be adjustments or corrections to existing methodology and not implementation of new materials or failure mechanisms. |
| 3.2.2 | These improvements are estimated to be approximately four in number and are expected to require about a week to accomplish on average. |
| 3.3 | The contractor shall attend review meetings located in Dahlgren, Virginia. It is anticipated that a single meeting will be required. |
4.0 DELIVERABLES
The contractor shall provide the following data deliverables:
4.1 Contractor’s Progress, Status and Management Report (CDRL A001).
4.2 Scientific and Technical Reports (CDRL A002.)
4.4 Computer Software Product End Items (CDRL A003).
4.3 Briefing Materials (CDRL A004).
5.0 TRAVEL
The contractor will be required to travel in performance of this contract. The number of trips and types of personnel traveling shall be limited to the minimum required to accomplish work requirements and shall be coordinated with the technical point of contact. All travel shall be conducted in accordance with the FAR 31.205-46, “Travel Costs,” and the Federal Travel Regulations (FTR). The government anticipates one person to travel to Dahlgren, VA for three days.
6.0 PERIOD OF PERFORMANCE
The contractor shall complete all work not later than (NLT) 20 December 2014.