JECP_SPM_Accredidation_Plan_Package_-_SOW.docx

DOCX document 39 KB Posted

Attached to
RESEARCH AND DEVELOPMENT
Solicitation number
N0017814Q4046
Issued by

About this file

PLAN PACKAGE

View the file

Other files

File Type Posted
DD2541.PDF PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JECP SPM ACCREDITATION PACKAGE

STATEMENT OF WORK

1.0 SCOPE

This statement of work (SOW) describes the requirements to support the initial phase effort required to support the accreditation of the Joint Expeditionary Collective Protection (JECP) System Performance Model (SPM) for its use in support of the developmental and operational testing and evaluation of the JECP products. In the Department of Defense (DoD), accreditation is defined as “the official certification that a model or simulation and its associated data are acceptable for use for a specific purpose”.

2.0 APPLICABLE DOCUMENTS

None

3.0 TECHNICAL REQUIREMENTS

The contractor shall perform the following tasks as follows:

3.1 Task 1 – Reports and Meeting Support

Prepare monthly reports; participate in JECP SPM Technical Working Group meetings and In Progress Reviews.

3.2 Task 2 – Accreditation Planning & Documentation

Plan the JECP SPM accreditation effort. This includes assessing the JECP SPM accreditation needs, developing the accreditation approach, preparing a draft of the JECP SPM accreditation plan, and evolving that plan from the input from the JECP Product Manager’s Office and Commander Operational Test and Evaluation Force (COMOPTEVFOR) until gaining the approval of the accreditation authorities.

3.3 Task 3 – JECP SPM Statement of Intended Use

Characterize the JECP SPM use. This includes developing relationships with the accreditation authorities, collecting the user's needs, documenting the intended use(s), developing consensus on the statement of intended use, and periodically updating the JECP SPM statement of intended use to reflect any changes in the user needs.

3.4 Task 4 – JECP SPM Acceptability Criteria

Develop the JECP SPM acceptability criteria. This includes building the draft acceptability criteria from the existing information on user needs and requirements, evolving the acceptability criteria until gaining the approval of the accreditation authorities, and periodically updating the JECP SPM acceptability criteria to reflect any changes in the user needs.

3.5 Task 5: Draft JECP SPM Referent Preparation

Develop a draft version of the referent against which to assess the accuracy of the JECP SPM. This includes determining the accuracy measurement needs from the JECP SPM acceptability criteria, identifying and collecting authoritative information on the phenomena that the SPM represents, integrating the collected information into an initial set of references for SPM state and behavior, and preparing a description of the resulting draft referent for preliminary review.

4.0 DELIVERABLES

The contractor shall provide the following deliverables to the Technical Point of Contact (TPOC) identified below:

4.1Monthly technical progress reports (CDRL A001);
4.2JECP SPM Accreditation Plan (CDRL A002);
4.3JECP SPM Statement of Intended Use (CDRL A003);
4.4JECP SPM Acceptability Criteria Verification Report (CDRL A004); and
4.5Draft JECP SPM Referent Description (CDRL A005).
5.0TRAVEL

The contractor will be required to travel in performance of this contract. The number of trips and types of personnel traveling shall be limited to the minimum required to accomplish work requirements and shall be coordinated with the technical point of contact. All travel shall be conducted in accordance with the FAR 31.205-46, “Travel Costs”, and the Federal Travel Regulations (FTR). The following travel is anticipated:

2 person-trips to the Naval Surface Warfare Center Dahlgren, Dahlgren, VA;

2 person-trips to the COMPOTEVFOR, Norfolk, VA; and 1 person-trip to IMC Headquarters, Dulles, VA.

6.0 SECURITY

The contractor shall maintain a SECRET facility clearance. All personnel performing work under this contract shall have a minimum of a Department of Defense (DoD) Secret security clearance. Personnel security clearances shall be verified by the Contractor in the Joint Personnel Adjudication system (JPAS). See attached DD254, Security Classification Specification, for security requirements.

7.0 TECHNICAL POINT OF CONTACT

Bruce J. Corso

NSWCDD Z20

Building 1480 Dahlgren, VA 22448 Phone: 540 284 0656 Email: bruce.corso@navy.mil

File details come from the government source that posted it. Updated .