Solicitation - N0017426Q1122.pdf

PDF 1 MB Posted

Attached to
320lb Shock Test Change Containers
Solicitation number
N00174-26-SIMACQ-M41-0020
Issued by

About this file

This is a Request for Quotation (RFQ) issued by the Naval Surface Warfare Center Indian Head Division for the manufacturing of 320-pound Shock Test Charge (STC) Containers. The solicitation is not a small business set-aside and is being conducted as a firm fixed-price acquisition. The RFQ number is N0017426Q1122, issued on September 8, 2026, with quotations due by September 18, 2026. The contract requires delivery of 16 charge containers to Naval Surface Warfare Center Indian Head Division, Bldg. 116, Indian Head, Maryland 20640 by November 30, 2026, with a maximum lead time of 8 weeks from contract award.

The contractor must fabricate, inspect, test, and deliver components in accordance with Department of the Navy Technical Drawing 6086505D and applicable military specifications including ASTM A1011/A1011M, MIL-PRF-900, MIL-W-21157, and MIL-S-24235. Key deliverables include 16 charge containers (Line Item 0001) and Contract Data Requirements List items A001 through A005 (Line Item 0002), encompassing dimensional inspection reports, certificates of compliance and completion, program progress reports, requests for variance, and certificates of analysis. Quality control requirements mandate compliance with ISO 9001:2015 standards, 100% dimensional inspection conformance, and material traceability. Inspection and acceptance will occur at the destination facility using ASQ Z1.4 sampling procedures with critical defects at 100%, major defects at Level II, and minor defects at Level I. The contractor must maintain ITAR compliance for munitions components and CMMC Level 2 cybersecurity certification. The contract includes export control compliance, security requirements for facility access, and adherence to occupational safety and health standards including VPP participation requirements.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATION

(THIS IS NOT AN ORDER)

THIS RFQ IS IS NOT A SMALL BUSINESS SET-ASIDE

15. DATE OF QUOTATION

16. SIGNER

a. NAME (Type or print)

c. TITLE (Type or print)

b. TELEPHONE

AREA CODE

NUMBER

STANDARD FORM 18 (REV. 6-95)

Prescribed by GSA-FAR (48 CFR) 53.215-1(a)

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition not usable

8. TO:

b. COMPANYa. NAME

c. STREET ADDRESS

d. CITY e. STATE f. ZIP CODE

9. DESTINATION

a. NAME OF CONSIGNEE

b. STREET ADDRESS

c. CITY

d. STATE e. ZIP CODE

7. DELIVERY

FOB DESTINATION

OTHER

(See Schedule)

10. PLEASE FURNISH QUOTATIONS TO THE

ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS (Date)

IMPORTANT: This is a request for information and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or service. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotation must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State and local taxes)

ITEM NO.

(a)

SUPPLIES/ SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f)

12. DISCOUNT FOR PROMPT PAYMENT

a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS

NUMBER PERCENTAGE

NOTE: Additional provisions and representations are are not attached.

13. NAME AND ADDRESS OF QUOTER

a. NAME OF QUOTER

b. STREET ADDRESS

c. COUNTY

d. CITY e. STATE f. ZIP CODE

14. SIGNATURE OF PERSON AUTHORIZED TO

SIGN QUOTATION

PAGE OF PAGES

1. REQUEST NO. 2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT. DEF.

UNDER BDSA REG. 2

AND/OR DMS REG. 1

RATING

5a. ISSUED BY 6. DELIVER BY (Date)

5b. FOR INFORMATION CALL (NO COLLECT CALLS)

NAME TELEPHONE NUMBER

AREA CODE NUMBER

Created On:

08 Sep 2026, 17:26 PM Greenwich Mean Time

Section A - Solicitation/Contract Form

320lb Shock Test Charge Containers

N0017426Q1122

Section B - Supplies or Services & Prices or Costs

Additional Information/Notes

Item Supplies/Service Quantity Unit Unit Price Amount

0001 320 # Charging Containers

Pricing Arrangement: Firm Fixed Price

16 Each

0002 CDRL A001 thru A005

Pricing Arrangement: Firm Fixed Price

1 Each

Section C - Description/Specifications/Statement of Work

MANUFACTURING OF CHARGE CONTAINERS USING NSWC IHD DRAWINGS

STATEMENT OF WORK

1.0 Scope of Work

The requirements in this document contain the information necessary to manufacture charge containers for assembly in the 320lb Shock Test Charge (STC) program.

2.0 Applicable Documents

Department of the Navy (DON) Technical Drawings

6086505 D Charge Container (For Conventional 1/1 Ration Charge of 320lbs) (Empty)

American Society for Testing and Materials

ASTM A1011

/A1011M

Standard Specification for Steel, Sheet and Strip, Hot-Rolled, Carbon, Structural, High-Strength Low-Alloy, High Strength Low Alloy with Improved Formability, and Ultra-High Strength

Military Specifications

MIL-

PRF-

Rubber Gasket Material, 45 durometer hardness. This specification covers rubber gasket material for watertight and airtight closures, in the temperature range of -20 Deg. to 130 Deg. F (-28.9 Deg. to 54.4 Deg. C), and other uses.

MIL-

W- 21157

Weldment, Carbon and low alloy steel (yield strength 30,000 - 60,000 psi). This specification covers the requirements for steel weldments fabricated by metal electrode welding processes.

MIL-S-

24235

Stuffing Tubes, Metal, and Packing Assemblies for Electric Cables, General Specification for...

Federal Specifications

FED-STD-H28 Rev B Screw-Thread Standards for Federal Services

Data Item Descriptions

DI-NDTI-80809B Test/Inspection Report

DI-MISC-82386 Certification Data Report

DI-MGMT-80555A Program Progress Report

DI-SESS-80640 Request for Variance

DI-MISC-81020A Certification Data for Non-Nuclear Level I Material

2.1 General Specifications

American National Standards Institute (ANSI)/American Society for Quality (ASQ) Standards

ANSI/ASQ Z1.4 Sampling Procedures and Tables for Inspection by Attributes

Code of Federal Regulations (CFR)

22 CFR 121 The United States Munitions List

22 CFR 122 Registration of Manufacturers and Exporters

Military Specifications

MIL-STD-129R Military Marking for Shipment and Storage

MIL-STD-130N Identification Marking of U.S. Military Property

Department of Defense (DoD) Directives

5230.25 Withholding of Unclassified Technical Data From Public Disclosure

International Organization for Standardization (ISO)/International Electrotechnical Commission (IEC) Standards

ISO 9001 Quality Management Systems

ISO/IEC 17025 General Requirements for the Competence of Testing and Calibration Laboratories

2.2 Conflicting Document Requirements

If there are any conflicts between specifications, drawings, or requirements listed herein, the contractor shall notify the Contracting Officer (KO) and the Technical Point of Contact (TPOC), in writing for interpretation, clarification, and resolution.

3.0 Requirements

3.1 General Manufacturing

The contractor shall fabricate, inspect, test, and deliver components in accordance with the applicable drawings and specifications. The components shall be packaged by part number and ready for use, in accordance with paragraph 3.5 of this SOW. The contractor shall provide, design, and fabricate all necessary tooling to manufacture and dimensionally inspect the components, and provide data as classified herein.

The prime contractor shall bear the ultimate responsibility for all deliveries and performance of all requirements under this contract.

The prime contractor should monitor and maintain all subcontractor relationships. At the government's sole discretion, the government may apply quality and/or on-time delivery issues stemming from the work of a subcontractor to the prime contractor's quality performance metrics.

The contractor shall send partial deliveries of the production lot if units are completed, in accordance with the application drawings and specifications, prior to the max lead time of 20 weeks for the production lot. If the contractor cannot meet partial delivery schedules, the contractor must deliver the full production lot within 20 weeks.

3.2 Test and Inspection

The contractor shall maintain and control processes to inspect and test components as described in this SOW. These processes should cover all phases, from the ordering of the material to the government's acceptance of the finished product.

3.2.1 First Article Testing

Per the drawing 6086505D and NMD 142, no First Article Test (FAT) samples are required from the contractor under this contract. All FAT requirements are hereby waived.

3.2.2 Dimensional Inspection

The contractor is responsible for performing in-house inspections to ensure each production components and dimension conform 100% to the contract, SOW, and product dimensional requirements. The contractor shall provide copies of in process dimensional data and/or proof of inspections, such as floor shop travelers or final QA inspections, as requested by the government.

The contractor shall submit a Final Dimensional Inspection Report in accordance with DI-NDTI-80809B per Contract Data Requirements List (CDRL) A001 for each assembly deliverable line item. The final dimensional inspection report shall include either a list of all drawing dimensions and tolerances, and their actual measured values, or a marked-up copy of the drawing with actual measured values written in red next to the corresponding dimension.

3.2.3 Product Certification

The contractor shall submit the Certificate of Completion and Certificate of Compliance in accordance with DI-MISC- 82386 per CDRL A002, as required by Table 1 for the welding procedural work.

The contractor shall submit a Certificate of Personnel for the welder certification in accordance with DI-MISC-82386 per CDRL A002, as required by Table 1.

The contractor shall submit the Certificates of Analysis in accordance with DI-MISC-81020A per CDRL A005, as required by Table 1. The material certification data shall include quantitative chemical composition and mechanical properties required by specification and contract. Material certification test reports shall be traceable to the material through unique traceability codes marked on the material and on all test reports. The material traceability marking shall be maintained through all phases of fabrication and manufacturing.

All certificates, as a minimum, shall state the contractor's name, contract/order number, drawing or specification number, and date.

All certificates must be traceable to the material covered by the certificate. All certificates shall state above the signature of a legally authorized representative of the company, the following:

"This certification concerns a matter within the jurisdiction of an agency of the United States and making a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code 1001."

The certificates shall be provided to the government with every shipment. One (1) paper copy shall accompany each shipment, and one (1) digital copy shall be submitted via FIPS 140-2 approved encrypted email or DoD SAFE file transfer in Microsoft Office or PDF format to each addressee called out in block 14 of each Contract Data Requirements List (CDRL).

Table 1: Certification Requirements

Test Requirement Certificate

Dwg Location

Welding procedure 6086505D Notes #2 and #5 Completion and Compliance

Welder personnel qualification 6086505D Notes #2 and #5 Personnel

Container Material 6086505D Parts List Material Column Analysis

3.3 Quality Control

3.3.1 Quality System and Quality Control Processes

The contractor shall maintain a quality system which adheres, at minimum, to the requirements of ISO 9001:2015 standards.

The contractor quality management system shall ensure products are in compliance with the applicable drawings, specifications, and contract. The quality management system shall outline processes to identify, record, and disposition nonconforming material or other characteristic discrepancies for the entire duration of this contract. Procedures, planning, and all other relevant documentation and data which comprise the quality management system, if requested, shall be made available to the government for review.

3.3.2 Calibration of Measuring and Testing Equipment

Measuring and testing equipment used by the contractor shall, at a minimum, adhere to the requirements of ISO/IEC 17025:2017.

3.3.3 Acceptance of Product

Final acceptance of production deliverables will be determined by government dimensional inspection and certification verification at government destination for each deliverable line item. The government has 60 working days to complete testing upon receipt of all material deliverables and associated Contract Data Requirements Lists (paper and digital) for each shipment. Unless otherwise stated, the government sampling plan shall be in accordance with Table 2. The government reserves the right to perform additional inspection and testing of hardware to verify acceptability. This may include testing at other facilities.

Table 2: ACSI Sampling Plan

ASQ Z1.4 [ANSI/ASQ Z1.4-2003 (R2018):

Critical: 100%

Major: Level II

Minor: Level I

Features designated as "Majors" and "Criticals" may be subject to high-precision measurement techniques as part of the sampling plan identified above. The government shall inspect sampled products in accordance with Table 3.

Table 3: Inspection Criteria

DWG Requirement / Inspection Inspection Level Method

6086505D Per Note 4 Minor Measurement Tool, gage

6086505D Dimension M101 Major Measurement Tool, gage

3.3.4 Government-Identified Nonconformity Reporting Procedures

The Government shall alert the Contractor to any nonconforming deliverables within one (1) working day of identifying the nonconformity. The Contractor shall respond with their recommended disposition on the deliverables within ten

(10) working days.

3.3.5 Contractor-Identified Nonconformity Reporting & Request for Variance The Contractor shall alert the Government to any nonconforming deliverables within one (1) working day of identifying the nonconformity. If applicable, a request for variance must be submitted in accordance with DI-SESS-80640E per CDRL A004. The Government shall review and respond to the request for variance within fifteen (15) business days.

3.4 Export Control & Controlled Unclassified Information

The contractor shall comply with either one or both of the export control options below.

International Trafficking in Arms Regulations (ITAR) Compliance

The contractor shall maintain ITAR compliance through registration in accordance with 22 CFR 122 to export Category III and IV munitions components, as defined by 22 CFR 121.

Joint Certification Program (JCP) Registration

The contractor shall maintain JCP registration and a DD Form 2345 to comply with DoD Directive 5230.25.

Controlled Unclassified & Federal Contract Info

It is anticipated that the Contractor will require access to or create controlled unclassified information under this contract. The Contractor shall maintain Cybersecurity Maturity Model Certification (CMMC) Level 2 compliance through self-certification, in accordance with NIST SP 800-171 R2, as required by DFARS clause 252.204-7012, due to the inclusion of Federal Contract Information (FCI).

3.5 Preservation/Packaging

The contractor shall be responsible for packing and packaging of deliverables to prevent any potential damage during transport. The contractor, at minimum, shall label completed parts packaging to include component name, quantity, contract number, drawing number, revision, and manufacturer name and date.

Charging Container: The contractor shall be responsible for packaging deliverables, one container per individual packaging, to maintain integrity of the part during transportation to destination facility.

3.6 Administrative

3.6.1 Government Inspection of Facilities

The government, through any authorized representative, may visit/inspect the plant or plants of the contractor, or of any subcontractors, engaged in the performance of this contract.

3.6.2 Kickoff Meeting

A government/contractor kickoff meeting will be scheduled within 15 workings days after contract award, or as mutually agreed to by the government and the contractor. The meeting objective shall include team introduction, general program discussions, and address any outstanding questions that the government or contractor may have.

3.6.3 Progress Reports

The contractor shall submit monthly progress reports to the government in accordance with DI-MGMT-80555A per

CDRL A003.

4.0 Contract Data Requirements List (CDRL) Deliverables

The Technical Point of Contact (TPOC) and Contracting Officer (KO) for this contract will approve all deliverables as specified. The following Certificates shall include the signature of the contractor's representative authorized to make such certification.

Table 4: Contract Data Requirements List (CDRL)

Specification Section Title Sub Title

DI-NDTI-80809B 3.2.2 Test/Inspection Report Final Dimensional Inspection Report

DI-MISC-82386 3.2.3 Certification Data Report

Certificate of Completion

Certificate of Compliance

Certificate of Personnel

DI-MGMT-80555A 3.6.3 Program Progress Report N/A

DI-SESS-80640 3.3.5 Request for Variance (RFV) Request for Variance (RFV)

DI-MISC-81020A 3.2.3 Certification Data for Non-Nuclear Level I Material Certificate of Analysis

4.1 Hardware Deliverables

The contractor shall notify the Contracting Officer 30 days in advance if the contractor cannot meet the contract delivery schedule.

The contractor shall be responsible for coordinating and shipping all the units listed in Table 5 to the required destination. Lead time notates the max weeks acceptable from contract award to material being received onsite.

Table 5: Material Deliverables

Item Year Drawing Rev Nomenclature Qty UOI Lead Time

1 Base 6086505 D Charge Container 16 EA 8 weeks

Delivery address provided below:

Naval Surface Warfare Center Indian Head Division

ATTN: M41

4522 McMahon Road

Bldg. 116, Suite 100

Indian Head, MD 20640

5.0 Shipping

The contractor shall be responsible for delivery of material in appropriate shipping containers. The packaging shall prevent any damage which may occur during transit. Vendor paperwork shall state the contract number and lot number(s). Transportation shall comply with Department of Transportation regulations at Title 49, Code of Federal Regulations.

6.0 Government Furnished Information

The Government shall provide the appropriate information as required. All Government provided information is considered the property of the

Government and shall be used for no other purpose except as identified herein or in applicable technical instruction.

7.0 Place of Conformance:

The manufacturing of all requested products shall occur at the manufacturer's facility. The manufacturer shall provide all personnel, equipment, materials, parts, supplies and tools necessary for performance under this Statement of Work. The manufacturer shall complete the required task to meet the requirements listed in section 4.

8.0 Period of Performance:

The period of performance shall not exceed 12 months from the date of contract award.

9.0 Security

All contractors entering NSWC IHD must be U.S. citizens and must obtain a temporary identification badge from the Pass and Identification Office upon arrival. Drivers must show two forms of identification, proof of insurance, and registration documents to obtain a temporary identification badge. All base access and arrangements must be made by the vendor prior to providing services and deliveries.

Operations Security (OPSEC)

Contractor personnel are subject to applicable provisions of Department of Defense Manual 5205.02-M, Enclosure 6 and NSWC IHD 3070.3D OPSEC Program. Contractor personnel supporting this contract/task order must complete government approved or provided OPSEC awareness training. OPSEC education and training may be accomplished through established programs within the DoD Component, using external resources such as the Director of National Intelligence (DNI) and the Defense Security Service Academy, or a combination (i.e.

https://securityawareness.dcsa.mil/opsec/index.htm). Contractor personnel may have access to government Critical Information (CI), Indicators and Observables that may indirectly disclose CI. CI includes but is not limited to: Ship movements and schedules, weapons and sensor system installations, capabilities, and configurations; specific platform installations and characteristics, test schedules, deficiencies, and vulnerabilities.

Indicators and Observables may include but is not limited to: Outdoors system testing; ship's external hull or superstructure modifications;

shipboard equipment, ordnance, weapons, fuels, and/or stores loading/unloading operations, and/or personnel or aircraft embarkation. No CI, Indicators, or Observables may be divulged to third parties (including other company employees who are not subject to this contract) without approval of the local command Security Officer, OPSEC Officer, or the NSWC IHD OPSEC Program Manager.

10.0 Technical Point of Contact:

M41 Branch Manager Bryan Fiala Indian Head, MD 20640

Requirements 320lb Shock Test Charge Containers for Organization M41 FY: 2026, AMS: N00174-26-SIMACQ-M41-0020

Additional Regulation or Supplemental Clauses Incorporated by Full Text

C-204-H002 IMPLEMENTATION OF ENHANCED SECURITY CONTROLS ON SELECT

DEFENSE INDUSTRIAL BASE PARTNER NETWORKS

(Sep 2024)

1. System Security Plan and Plans of Action and Milestones (SSP/POAM) Reviews

a) Within thirty (30) days of contract award, the Contractor shall make its System Security Plan(s) (SSP(s)) for its covered contractor information system(s) available for review by the Government at the contractor's facility.

The SSP(s) shall implement the security requirements in Defense Federal Acquisition Regulation Supplement (DFARS) clause 252.204-7012, which is included in this contract. The Contractor shall fully cooperate in the Government's review of the SSPs at the Contractor's facility.

b) If the Government determines that the SSP(s) does not adequately implement the requirements of DFARS clause 252.204-7012 then the Government shall notify the Contractor of each identified deficiency. The Contractor shall correct any identified deficiencies within thirty (30) days of notification by the Government.

The contracting officer may provide for a correction period longer than thirty (30) days and, in such a case, may require the Contractor to submit a plan of action and milestones (POAM) for the correction of the identified deficiencies. The Contractor shall immediately notify the contracting officer of any failure or anticipated failure to meet a milestone in such a POAM.

c) Upon the conclusion of the correction period, the Government may conduct a follow-on review of the SSP(s) at the Contractor's facilities. The Government may continue to conduct follow-on reviews until the Government determines that the Contractor has corrected all identified deficiencies in the SSP(s).

d) The Government may, in its sole discretion, conduct subsequent reviews at the Contractor's site to verify the information in the SSP(s). The Government will conduct such reviews at least every three (3) years (measured from the date of contract award) and may conduct such reviews at any time upon thirty (30) days' notice to the Contractor.

2. Compliance to NIST 800-171

a) The Contractor shall fully implement the CUI Security Requirements (Requirements) and associated Relevant Security Controls (Controls) in NIST Special Publication 800-171 (Rev. 2) (NIST SP 800-171), or establish a SSP(s) and POA&Ms that varies from NIST 800-171 only in accordance with DFARS clause 252.204-7012(b) (2), for all covered contractor information systems affecting this contract.

b) Notwithstanding the allowance for such variation, the contractor shall identify in any SSP and POA&M their plans to implement the following, at a minimum:

(1) Implement Control 3.5.3 (Multi-factor authentication). This means that multi-factor authentication is required for all users, privileged and unprivileged accounts that log into a network. In other words, any system that is not standalone should be required to utilize acceptable multi-factor authentication. For legacy systems and systems that cannot support this requirement, such as CNC equipment, etc., a combination of physical and logical protections acceptable to the Government may be substituted;

(2) Implement Control 3.1.5 (least privilege) and associated Controls, and identify practices that the contractor implements to restrict the unnecessary sharing with, or flow of, covered defense information to its subcontractors, suppliers, or vendors based on need-to-know principles;

(3) Implement Control 3.1.12 (monitoring and control remote access sessions) - Require monitoring and controlling of remote access sessions and include mechanisms to audit the sessions and methods.

(4) Audit user privileges on at least an annual basis;

(5) Implement:

i. Control 3.13.11 (FIPS 140-2 validated cryptology or implementation of NSA or NIST approved algorithms (i.

e. FIPS 140-2 Annex A: AES or Triple DES) or compensating controls as documented in a SSP and POAM);

and,

ii. NIST Cryptographic Algorithm Validation Program (CAVP) (see https://csrc.nist.gov/projects/cryptographic-algorithm-validation-program);

(6) Implement Control 3.13.16 (Protect the confidentiality of CUI at rest) or provide a POAM for implementation which shall be evaluated by the Navy for risk acceptance.

(7) Implement Control 3.1.19 (encrypt CUI on mobile devices) or provide a plan of action for implementation which can be evaluated by the Government Program Manager for risk to the program.

3. Cyber Incident Response

a) The Contractor shall, within fifteen (15) days of discovering the cyber incident (inclusive of the 72-hour reporting period), deliver all data used in performance of the contract that the Contractor determines is impacted by the incident and begin assessment of potential warfighter/program impact.

b) Incident data shall be delivered in accordance with the Department of Defense Cyber Crimes Center (DC3) Instructions for Submitting Media available at http://www.acq.osd.mil/dpap/dars/pgi/docs /Instructions_for_Submitting_Media.docx. In delivery of the incident data, the Contractor shall, to the extent practical, remove contractor-owned information from Government covered defense information.

c) If the Contractor subsequently identifies any such data not previously delivered to DC3, then the Contractor shall immediately notify the contracting officer in writing and shall deliver the incident data within ten (10) days of identification. In such a case, the Contractor may request a delivery date later than ten (10) days after identification. The contracting officer will approve or disapprove the request after coordination with DC3.

4. Naval Criminal Investigative Service (NCIS) Outreach

The Contractor shall engage with NCIS industry outreach efforts and consider recommendations for hardening of covered contractor information systems affecting DON programs and technologies.

5. NCIS/Industry Monitoring

a) In the event of a cyber incident or at any time the Government has indication of a vulnerability or potential vulnerability, the Contractor shall cooperate with the Naval Criminal Investigative Service (NCIS), which may include cooperation related to: threat indicators; pre-determined incident information derived from the Contractor's infrastructure systems; and the continuous provision of all Contractor, subcontractor or vendor logs that show network activity, including any additional logs the contractor, subcontractor or vendor agrees to initiate as a result of the cyber incident or notice of actual or potential vulnerability.

b) If the Government determines that the collection of all logs does not adequately protect its interests, the Contractor and NCIS will work together to implement additional measures, which may include allowing the installation of an appropriate network device that is owned and maintained by NCIS, on the Contractor's information systems or information technology assets. The specific details (e.g., type of device, type of data gathered, monitoring period) regarding the installation of an NCIS network device shall be the subject of a separate agreement negotiated between NCIS and the Contractor. In the alternative, the Contractor may install network sensor capabilities or a network monitoring service, either of which must be reviewed for acceptability by NCIS. Use of this alternative approach shall also be the subject of a separate agreement negotiated between NCIS and the Contractor.

c) In all cases, the collection or provision of data and any activities associated with this statement of work shall be in accordance with federal, state, and non-US law.

(End of Text)

Section D - Packaging and Marking

Section E - Inspection and Acceptance

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

52.246-15 Certificate of Conformance. Apr 1984

Additional Regulation or Supplemental Clauses Incorporated by Full Text

E-246-H020 QUALITY MANAGEMENT SYSTEM REQUIREMENTS (NAVSEA) (OCT 2018) (Oct 2018)

The Contractor shall provide and maintain a quality management system that, as a minimum, adheres to the requirements of ASQ/ANSI/ISO 9001:

2015 "Quality Management Systems - Requirements" and supplemental requirements imposed by this contract. The quality management system procedures, planning, and all other documentation and data that comprise the quality management system shall be made available to the Government for review. Existing quality documents that meet the requirements of this contract may continue to be used. The Government may perform any necessary inspections, verifications, and evaluations to ascertain conformance to requirements and the adequacy of the implementing procedures. The Contractor shall flow down such standards, as applicable, to lower-tier subcontractors under instances covered in FAR 52.246-11(b) or at the direction of the Contracting Officer. The Government reserves the right to disapprove the quality management system or portions thereof when it fails to meet the contractual requirements.

(End of Text)

E-246-W001 CERTIFICATE OF ANALYSIS (NAVSEA) (OCT 2018) (Oct 2018)

(a) A certificate of analysis/test showing that the material has been sampled and/or tested and found to be within the minimum requirements of the specification/drawing/contract shall be submitted to the COR or TPOC. The certificate shall be maintained by the contractor for a minimum of one (l) year; one (1) copy to accompany the shipment (in the packing list envelope) and one (1) copy mailed at time of the shipment (mark the certificate to the attention of: Code 00Q).

(b) Each certificate must be traceable to the material covered by the certificate. The certificate shall state, above the signature of a legally authorized representative of the company the following:

This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code, Section 1001.

(c) Beneath the signature include the typed name of the individual signing this certificate.

(d) Certificate for shipments of bulk chemicals shall state contract number, drawing or specification number, lot number, rail car number if shipped by rail or trailer number if by truck, and the date of shipment.

(e) Any demurrage accrued as a result of detaining commercial carriers because of nonreceipt of the certificate shall be the responsibility of the Contractor.

(f) Failure to provide certification at the time of shipment may result in material being rejected and returned at the contractor's expense.

(g) The certificate shall read as follows:

I certify that on ___________ [insert date], the ______________________________ [insert Contractor's name] furnished the supplies called for by the Order/Contract No.___________________ via _________ [Carrier] on __________________ [identify the bill of lading or shipping document] in accordance with all applicable requirements. I further certify that the supplies have been sampled and/or tested and conform in all respects with the contract requirements, including specifications, drawings, preservation, packaging, packing, marking requirements, and physical item identification (part number), and are in the quantity shown on this or on the attached acceptance document.

Date of Execution: ________________________________

Signature: _______________________________________

Typed Name: ____________________________________

Title: ___________________________________________

(End of Text)

SAMPLING OF RECEIVED MATERIAL – ORDNANCE MATERIAL AND

E-246-W006 ORDNANCE COMPONENT PARTS (NAVSEA) (MAY 2021) (May 2021)

(a) When NAVSEA, Naval Surface Warfare Center Indian Head Division receipt inspects ordnance material and/or ordnance component parts, under this contract, for rockets, missiles and their related component parts; the sampling plan utilized shall be as outlined in the technical data package or as otherwise specified in other applicable controlling documentation. If the sampling plan is not specified within any applicable controlling documentation, the sampling plan and the sampling size shall be as outlined in the specification checked below:

ASQ Z1.4 (ANSI/ASQ Z1.4 - 2003 (R2018)):

Critical: 100%

Major: Level II

Minor: Level I

ASQ Z1.9 (ANSI/ASQ Z1.9 -2003 (R2018)):

Critical: 100%

Major:

Minor:

(DTD 1 APR 96 with NOTICE 2 DTD 5 JUN 14): MIL-STD-1916

Critical: 100%

Major:

Minor:

OTHER: [ ]Insert applicable specification

Critical: 100%

Major:

Minor:

(b) In all cases the acceptance number of defects will be ZERO (0), the entire lot will be rejected for any defect unless specifically otherwise specified by the inspection type and code.

(c) Notwithstanding the above, NAVSEA, Naval Surface Warfare Center Indian Head Division may, at its discretion, accept a defect on an approved waiver on a case-by-case basis.

(End of Text)

E-246-H022 INSPECTION AND TEST RECORDS (NAVSEA) (JAN 2019) (Jan 2019)

Inspection and test records shall, as a minimum, indicate the nature of the observations, number of observations made, and the number and type of deficiencies found. Data included in inspection and test records shall be complete and accurate, and shall be used for trend analysis and to assess corrective action and effectiveness. The data shall, on request, be identified and made available for on-site review by the Contracting Officer or designated Government representative.

(End of Text)

Overall Contract Inspection/Acceptance Locations

Inspection and Acceptance Location

Both Destination Instructions: Inspection and Acceptance Destination/Destination

DoDAAC: N00174 CountryCode: USA

NSWC INDIAN HEAD DIVISION

N0017426Q1122 https://quicksearch.dla.mil/qsDocDetails.aspx?ident_number=120287

4219 SOUTH PATTERSON ROAD, INDIAN HEAD MD 20640-1533

INDIAN HEAD, MD 20640-1533

UNITED STATES

Bryan Fiala, TPOC Email: bryan.c.fiala.civ@us.navy.mil

Section F - Deliveries or Performance

Overall Contract Delivery Period

Contractor Destination

Line Item Delivery Schedule Quantity Address and POC Special Handling/Notes

Delivery On Or Before Delivery Date 30 Nov

16 Each Ship To DoDAAC: N00174 CountryCode: USA

NSWC INDIAN HEAD DIVISION

NAVAL SURFACE WARFARE CENTER, 4522

MCMAHON ROAD

INDIAN HEAD, MD 20640-1525

UNITED STATES

Bryan Fiala, TPOC Email: bryan.c.fiala.civ@us.navy.mil

FoB Details Contractor Destination

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

52.242-17 Government Delay of Work. Apr 1984 52.247-34 F.o.b. Destination. Jan 1991

Section G - Contract Administration Data

DFARS Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018

DFARS Clauses Incorporated by Full Text

252.232-7006 Wide Area WorkFlow Payment Instructions. (Jan 2023)

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(a) As used in this clause- Definitions.

"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as Electronic invoicing.

authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) To access WAWF, the Contractor shall- WAWF access.

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice WAWF training.

Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/

(e) Document submissions may be via web entry, Electronic Data Interchange, or File Transfer WAWF methods of document submission.

Protocol.

(f) The Contractor shall use the following information when submitting payment requests and receiving reports WAWF payment instructions.

in WAWF for this contract or task or delivery order:

(1) The Contractor shall submit payment requests using the following document type(s): Document type.

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items-

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

Invoice and Receiving Report (Combo)

(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.)

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial financing, submit a commercial financing request.

(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]

(3) The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in Document routing.

WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC N62838

Issue By DoDAAC N00174

Admin DoDAAC N00174

Inspect By DoDAAC N00174

Ship To Code N00174

Ship From Code ____

Mark For Code ____

Service Approver (DoDAAC) ____

Service Acceptor (DoDAAC) ____

Accept at Other DoDAAC ____

LPO DoDAAC ____

DCAA Auditor DoDAAC ____

Other DoDAAC(s) ____

(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable.")

(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)

(4) The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in Payment request.

accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F. Receiving report.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

usn.south-potomac.nswc-ihd.mbx.vendor-pay@us.navy.mil

(Contracting Officer: Insert applicable information or "Not applicable.")

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of clause)

Additional Regulation or Supplemental Clauses Incorporated by Full Text

G-232-H005- SUPPLEMENTAL INSTRUCTIONS REGARDING INVOICING (NAVSEA) (JAN

2019)

(Jan 2019)

(a) For other than firm fixed priced contract line item numbers (CLINs), the Contractor agrees to segregate costs incurred under this contract/task order (TO), as applicable, at the lowest level of performance, either at the sub line item number (SLIN) or CLIN level, rather than at the total contract/TO level, and to submit invoices reflecting costs incurred at that level. Supporting documentation in Wide Area Workflow (WAWF) for invoices shall include summaries of work charged during the period covered as well as overall cumulative summaries by individual labor categories, rates, and hours (both straight time and overtime) invoiced; as well as, a cost break down of other direct costs (ODCs), materials, and travel, by technical instruction (TI), SLIN, or CLIN level. For other than firm fixed price subcontracts, subcontractors are also required to provide labor categories, rates, and hours (both straight time and overtime) invoiced; as well as, a cost breakdown of ODCs, materials, and travel invoiced. Supporting documentation may be encrypted before submission to the prime contractor for WAWF invoice submittal. Subcontractors may email encryption code information directly to the Contracting Officer and Contracting Officer Representative (COR). Shouldthe subcontractor lack encryption capability, the subcontractor may also email detailed supporting cost information directly to the Contracting Officer and COR; or other method as agreed to by the Contracting Officer.

(b) Contractors submitting payment requests and receiving reports to WAWF using either Electronic Data Interchange (EDI) or Secure File Transfer Protocol (SFTP) shall separately send an email notification to the COR and Contracting Officer on the same date they submit the invoice in WAWF. No payments shall be due if the contractor does not provide the COR and Contracting Officer email notification as required herein.

(End of Text)

G-242-H002 HOURS OF OPERATION AND HOLIDAY SCHEDULE (NAVSEA) (JUL 2021) (Jul 2021)

(a) The policy of this activity is to schedule periods of reduced operations or shutdown during holiday periods. Deliveries will not be accepted on Saturdays, Sundays or Holidays except as specifically requested by the [insert activity name]. All goods or services attempted to be delivered on a Saturday, Sunday or Holiday without specific instructions from the Contracting Officer or his duly appointed representative will be returned to the contractor at the contractor's expense with no cost or liability to the U.

S. Government.

(b) The federal Government observes public Holidays that have been established under 5 U.S.C. 6103. The actual date of observance for each of the holidays, for a specific calendar year, may be obtained from the OPM website at OPM.GOV or by using the following direct link: https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/.

(c) Delayed Opening, Early Dismissal and Closure of Government Facilities. When a Government facility has a delayed opening, is closed or Federal employees are dismissed early (due to severe weather, security threat, security exercise, or a facility related problem) that prevents personnel from working, onsite contractor personnel regularly assigned to work at that facility shall follow the same reporting and/or departure directions given to Government personnel. The contractor shall not direct charge to the contract for such time off, but shall follow parent company policies regarding taking leave (administrative or other). Non-essential contractor personnel, who are not required to remain at or report to the facility, shall follow their parent company policy regarding whether they should go/stay home or report to another company facility. Subsequent to an early

N0017426Q1122 https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/ https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays dismissal, delayed opening, or during periods of inclement weather, onsite contractors should monitor the OPM website as well as radio and television announcements before departing for work to determine if the facility is closed or operating on a delayed arrival basis.

(d) When Federal employees are excused from work due to a holiday or a special event (that is unrelated to severe weather, a security threat, or a facility related problem), on site contractors shall continue working established work hours or take leave in accordance with parent company policy. Those contractor employees who take leave shall not direct charge the non-working hours to the contract. Contractors are responsible for predetermining and disclosing their charging practices for early dismissal, delayed openings, or closings in accordance with the FAR, applicable cost accounting standards, and the company's established policy and procedures. Contractors shall follow their disclosed charging practices during the contract period of performance, and shall not follow any verbal directions to the contrary. The Contracting Officer will make the determination of cost allowability for time lost due to facility closure in accordance with FAR, applicable Cost Accounting Standards, and the Contractor's established accounting policy and procedures.

(e) If you intend to visit the Contracts Office, it is advised that you call for an appointment at least 24 hours in advance.

(f) The hours of operation are as follows:

AREA FROM TO

Bldg 116 0730-1130 and 1230-1530

(g) All deliveries to the Receiving Officer, , shall be made Monday through Friday from to , local time.Bldg 116 0730-1130 1230-1530 Deliveries will not be accepted after . No deliveries will be accepted on federal government holidays. 1530

(End of Text)

G-242-H001 - GOVERNMENT CONTRACTADMINISTRATION POINTS-OF-CONTACT AND

RESPONSIBILITIES (NAVSEA) (OCT 2023)

(Oct 2023)

(a) The Government reserves the right to administratively substitute any of the points of contact listed below at any time.

(b) The contracting officer is the only person authorized to change this contract or orders issued thereunder. The Contractor shall not comply with any order, direction or request of Government personnel - that would constitute a change - unless it is issued in writing and signed by the Contracting Officer or is pursuant to specific authority otherwise included as part of this contract. If, in the opinion of the contractor, an effort outside the existing scope of this contract is requested, the contractor shall promptly comply with the Notification of Changes clause of this contract.

(c) The points of contact are as follows:

(i) The Procuring Contracting Officer (PCO) is:

Name: Larry Connell Phone: (301) 751- 0053 E-mail: lawrence.j.connell.civ@us.navy.mil

(ii) The Contract Specialist is:

Name: Jodi Fields Phone: (240) 795- 0897 E-mail: jodi.l.fields.civ@us.navy.mil

(f) The Technical Point of Contact (TPOC) is the contracting officer's representative for technical matters when a COR is not appointed. The TPOC is responsible for technical issues of contract administration, such as providing all items of Government Furnished Information (GFI), Government Furnished Material (GFM) and Government Furnished Equipment (GFE) if specified in the contract as well as the inspection and acceptance of all contract deliverables.

The Technical Point of Contact (TPOC) is:

Name: [ * ] Address: [ *Street ] [ *City, State, Zip ] Phone: (Area Code) xxx- [xxxx] E-mail: [ * ]

(j) The Contractor's point of contact for performance under this contract is:

Name: [ * ] Address:

[ *Street ] [ *City, State, Zip ] Phone: (Area Code) xxx- [xxxx] E-mail: [ * ]

(End of Text)

Section H - Special Contract Requirements

1. Voluntary Protection Program:

1.1. In August 2006, Indian Head Division (IHD) Naval Surface Warfare Center (NSWC) was nominated to participate in the DoD Voluntary Protection Program Center of Excellence Implementation Initiative of the Defense Safety Oversight Council (DSOC). The Voluntary Protection Program (VPP) was established by the Occupational Safety and Health Administration (OSHA) in 1982 to recognize and promote effective worksite-based safety and health management systems. IHD NSWC, through the utilization of VPP, desires to be a model of safety and health excellence. VPP's emphasis on trust and cooperation between OSHA, the employer, employees, employees representatives, and contractors complements the Agency's enforcement activity but does not take its place. All parties, including Contractors, are to work together to identify and resolve any safety and health problems that may arise, yet obtain Contracting Officer approval of any changes that would impact the terms of the contract. IHD NSWC as the VPP participant develops and implements systems to effectively identify, evaluate, prevent, and control occupational hazards so that injuries and illnesses to employees and contractors are prevented. Contractor and sub-contractor personnel are subject to occupational safety and health oversight.

This oversight will be accomplished by IHD NSWC personnel and Contracting Officers. Contractors, sub-contractors, and their employees, while in performance of a contractual action on-site within the geographical boundaries of Naval Support Facility (NSF) Indian Head, shall be subject to the requirements of the IHDIVNAVSURFWARCENINST 5100.22, "Safety Manual" regardless of the type or duration of the contract.

Appendix 13-A, of the chapter 13 entitled "Contractor Safety Requirements When Performing Work at the Naval Support Facility (NSF) Indian Head, MD" shall be signed by the Contractor prior to commencement of services on-site at NSF Indian Head. The Contractor shall maintain one signed copy for future reference in educating its personnel and sub-contractors. A second signed copy shall be provided to the Contracting Officer to be maintained in the contract file. If an occupational safety or health related injury or illness occurs during the performance or as a result of this contractual action, the Contractor shall notify the Contracting Officer Representative (COR) as soon as practicable, who will notify the Safety Office and the Contracting Officer. 1.2 In support of VPP and in compliance with Chapter 13 of the Safety Manual, entitled "Contractor Safety," all Contractors performing on-site at NSF Indian Head shall comply with the following:

1.2.1 Public Law 91-596 (and Amendments), also known as the Occupational Safety and Health

Act of 1970, establishes that all employers, including Contractors, are responsible, as far as possible, for providing every employee a safe and healthful working environment.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .