Solicitation - N0017426Q1104.pdf
PDF 1 MB Posted
- Attached to
- Drying Ovens
- Solicitation number
- N0017426Q1104
About this file
Request for Quotation Summary
This is a Request for Quotation (RFQ) issued by the Naval Surface Warfare Center Indian Head Division for the procurement of explosive drying ovens and related equipment and services. The RFQ number is N0017426Q1104, issued on 20 July 2026, with quotations due by 05 August 2026. The contract is for firm fixed-price delivery to NSWC Indian Head in Maryland.
The primary deliverables consist of one Explosive Drying Oven (Line Item 0001) and one Granulation Dryer (Line Item 0002), both rated for Class 1 Division 1 Group D explosives with local and remote control capabilities. Both units must feature digital controls, ethernet/IP communication, thermostatic controls maintaining temperature within ±0.5°C, and high-level alarm systems. The Explosive Drying Oven requires minimum internal dimensions of 36" x 36" x 60" to accommodate roll-in carts with eight shelves at 50 pounds each; the Granulation Dryer requires minimum dimensions of 70" x 40" x 50" to hold two roll-in carts with 30 shelves each. Additional line items include Site Start-Up and Training (Line Item 0003), Freight and Shipping (Line Item 0004), and three non-separately-priced CDRLs: Operation Manuals (A001), Calibration Certificate/Report per ANSI/NCSL Z540.3 or ISO 17025 (A002), and Technical Data Package (A003). All equipment must comply with NFPA 70 and NFPA 86 standards, operate on 230V/240V 3-phase 60 Hz power, and deliver with calibration certificates and training manuals. Delivery is required by 19 August 2026. The contract includes extensive cybersecurity requirements (NIST SP 800-171 compliance, CMMC Level 1), safety compliance under OSHA VPP, item unique identification requirements under DFARS 252.211-7003, and standard FAR and DFARS clauses. Payment will be processed through Wide Area WorkFlow (WAWF) with invoicing to DoDAAC N62838, and all deliverables require inspection and acceptance at the destination facility in Indian Head, Maryland.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUOTATION
(THIS IS NOT AN ORDER)
THIS RFQ IS IS NOT A SMALL BUSINESS SET-ASIDE
15. DATE OF QUOTATION
16. SIGNER
a. NAME (Type or print)
c. TITLE (Type or print)
b. TELEPHONE
AREA CODE
NUMBER
STANDARD FORM 18 (REV. 6-95)
Prescribed by GSA-FAR (48 CFR) 53.215-1(a)
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition not usable
8. TO:
b. COMPANYa. NAME
c. STREET ADDRESS
d. CITY e. STATE f. ZIP CODE
9. DESTINATION
a. NAME OF CONSIGNEE
b. STREET ADDRESS
c. CITY
d. STATE e. ZIP CODE
7. DELIVERY
FOB DESTINATION
OTHER
(See Schedule)
10. PLEASE FURNISH QUOTATIONS TO THE
ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS (Date)
IMPORTANT: This is a request for information and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or service. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotation must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State and local taxes)
ITEM NO.
(a)
SUPPLIES/ SERVICES
(b)
QUANTITY
(c)
UNIT
(d)
UNIT PRICE
(e)
AMOUNT
(f)
12. DISCOUNT FOR PROMPT PAYMENT
a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS
NUMBER PERCENTAGE
NOTE: Additional provisions and representations are are not attached.
13. NAME AND ADDRESS OF QUOTER
a. NAME OF QUOTER
b. STREET ADDRESS
c. COUNTY
d. CITY e. STATE f. ZIP CODE
14. SIGNATURE OF PERSON AUTHORIZED TO
SIGN QUOTATION
PAGE OF PAGES
1. REQUEST NO. 2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT. DEF.
UNDER BDSA REG. 2
AND/OR DMS REG. 1
RATING
5a. ISSUED BY 6. DELIVER BY (Date)
5b. FOR INFORMATION CALL (NO COLLECT CALLS)
NAME TELEPHONE NUMBER
AREA CODE NUMBER
Created On:
20 Jul 2026, 15:38 PM Greenwich Mean Time
Section A - Solicitation/Contract Form
Explosive Drying Ovens
N0017426Q1104
Section B - Supplies or Services & Prices or Costs
Additional Information/Notes
Item Supplies/Service Quantity Unit Unit Price Amount
Explosive Drying Oven
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
Manufacturer's Part Number: TBD Pricing Arrangement: Firm Fixed Price
1 Each
Granulation Dryer
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
Manufacturer's Part Number: TBD Pricing Arrangement: Firm Fixed Price
1 Each
Site Start Up and Training for the Explosive Drying Oven and the Granulation Dryer
Pricing Arrangement: Firm Fixed Price
1 Job
0004 Freight and Shipping
Pricing Arrangement: Firm Fixed Price
1 Job
CDRL A001 - COMMERCIAL OFF-THE-SHELF MANUALS
Operation Manuals
*Not Separately Priced
Pricing Arrangement: Firm Fixed Price
CDRL A002 - CALIBRATION CERTIFICATE/REPORT
*Not Separately Priced
Pricing Arrangement: Firm Fixed Price
CDRL A003 - TECHNICAL DATA PACKAGE
*Not Separately Priced
Pricing Arrangement: Firm Fixed Price
Section C - Description/Specifications/Statement of Work
Intrinsically Safe Friction Aire ovens
STATEMENT OF WORK
1.0 Scope of Work
The work to be performed by the contractor is described as follows:
Produce and deliver to NSWC IHD a granulation dryer and an oven.
The granulation dryer will include the following tasks:
- Process and Instrumentation Drawings of the oven system and controls
- Drawings of the oven system and control parts
- Bill of Materials of the oven system and control parts
- Manual for operation and maintenance of the granulation dryer
- Explosion proof dryer capable of holding Class 1 Division 1 Group D explosives with both local and remote control
- Training for operation and maintenance of the granulation dryer
The oven will include the following tasks:
- Process and Instrumentation Drawings of the oven system and controls
- Drawings of the oven system and control parts
- Bill of Materials of the oven system and control parts
- Manual for operation and maintenance of the oven
- Explosion proof oven capable of holding Class 1 Division 1 Group D explosives with both local and remote control
- Training for operation and maintenance of the oven
2.0 Applicable Document(s)
2.1 General Specifications
American National Standards Institute (ANSI)/National Conference of Standards Laboratories (NCSL) Standards:
ANSI/NCSL Z540.3 Requirements for the Calibration of Measuring and Test Equipment
International Organization for Standardization (ISO)/International Electrotechnical Commission (IEC) Standards:
ISO 9001 Quality Management Systems
ISO/IEC 17025 General Requirements for the Competence of Testing and Calibration Laboratories
Naval Sea Systems Command Publications:
NAVSEA OP 5
Ammunition and Explosives Batch Ashore
Other Publications:
NFPA 70
NFPA 86
National Fire Protection Association; National Electrical Code
National Fire Protection Association; Class A Ovens and Furnaces
MIL-STD-1916 Department of Defense Preferred Methods for Acceptance of Product
2.2 Pre-Existing Building Plans
If electrical and building plans are required for design and installation, the contractor may use electrical and building plans of NSWC Indian Head. When the contractor is finished, they shall either return the electrical and building plans of NSWC Indian Head or shred them.
2.3 Conflicting Document Requirements
If there are any conflicts between specifications, drawings, or requirements listed herein, the contractor shall notify the Contracting Officer (KO) and the Technical Point of Contact (TPOC), in writing for interpretation, clarification, and resolution.
3.0 Requirements
3.1 Operational Envelope
The safe temperature for drying each material shall be established and then not exceeded during drying processes. The effect of impurities should be carefully considered when establishing safe drying temperatures.
The allowable drift for both the granulation dryer and oven shall be at:
- +50C: 1.0C
- +100C: 0.75C
At a minimum, calibration must show that the ovens can keep a consistent temperature at the allowable drift, ranging from 50 above ambient to 100, for 10 hours.
3.2 Controls
The granulation dryer and oven shall each be equipped with thermostatic controls which automatically adjust the internal oven temperature mid-cycle to the nearest 0.5C. In addition, the granulation dryer and oven shall each have a controller that always displays the temperature of the granulation dryer and oven, respectively, when in use. The granulation dryer and oven shall each display the temperature on both the granulation dryer/oven and their respective control box. Operator shall record the oven temperature at adjustable intervals as specified by the appropriate Project Work Order (PWO). The granulation dryer and oven shall each be equipped with controls for an oven watch system, including digital controls and ethernet or IP communication, where one can monitor the temperature of the oven from another building. Manual checks shall be done when remote monitoring is non-operational.
The control box for the oven shall be remote mounted in a nearby non-classified area.
The control box for the granulation dryer shall be remote mounted in a nearby non-classified area.
3.2.1 Alarm Notification
The oven and granulation dryer shall have adjustable high-level alarms that consists of an amber-colored flashing LED and a loud beeper which are activated once the maximum threshold is exceeded. Additionally, the high-level alarm shall shut off the blower if triggered and require a manual reset to restart the oven and granulation dryer.
3.3 Equipment Requirements
Open and sealed flame units are prohibited.
Both the ovens must have digital controls and ethernet and/or IP communication.
3.3.1 Power Supply
All equipment shall be capable of operating from a 230V/240V 3 Phase 60 Hz power supply or otherwise applicable power supply to the specified building.
3.3.2 Electrical Classification
In accordance with article 501 of NFPA 70, all associated equipment for the ovens shall be approved for use in Class 1 Division 1 Group D environment.
3.3.3 Physical Footprint
The oven shall not exceed an outside physical dimension of 100" x 70" x 100" (L x W x H).
The granulation dryer shall not exceed an outside physical dimension of 14.5' x 6.5' x 8.25' (L x W x H).
3.4 Oven Internal Specifications
3.4.1 Oven Internal Capacity
The oven shall have a minimum internal capacity of 36 x 36 x 60 (L x W x H inches) with the capability to hold a roll-in cart of at least eight shelves with a maximum powder weight of 50 pounds each.
The granulation dryer shall have a minimum internal capacity of 70 x 40 x 50 (L x W x H inches) with the capability to hold at least 2 roll-in carts with at least 30 shelves each that can hold trays with a maximum powder weight of 50 pounds each.
3.4.2 Oven Tray Requirements
Each tray shall be roughly 30 x 20 x 2 (inches), and capable of safely holding 50 pounds. The weight will consist of beakers containing powder or powder by itself. Each tray shall be grounded in accordance to
NAVSEA OP-5.
3.4.3 Door Style
The oven shall be front-loaded with door(s) abiding with safe egress and with roll-in capability.
The granulation dryer shall be front-loaded with double doors with the left door having a left hand door hinge and the right hand door having a right hand door hinge. The oven shall also have roll-in capability.
3.5 Training
The contractor shall complete form SECNAV 5512 and send it to the designated Government personnel. Once approved, the contractor will provide on-site training for Government personnel, in accordance with company and industry standards. Training shall occur within 1-2 weeks of system delivery to the Government.
3.5.1 Training Manuals
The contractor shall provide training manuals for Government personnel to keep in accordance with DI-TMSS- 80527 per CDRL A001.
3.6 Calibration
The contractor shall provide a calibration certificate for the system in accordance with either ANSI/NCSL Z540.
3 or ISO 17025 in accordance with DI-QCIC-80798 per CDRL A002.
3.7 Installation
The Government shall install the system in accordance with company and industry standards within 1-2 weeks of system delivery to the Government. The Contractor shall be available and provide assistance upon request by the Government. The Government shall ensure the site is prepared for system install in accordance with
NAVSEA OP-5.
3.8 Shipping and Preservation
The Contractor shall be responsible for shipping container design, and purchase of all packing and packaging materials. The packing shall prevent any damage which may occur during transit. The Contractor shall label completed parts packaging to include component name, quantity, contract number, drawing number, revision, and manufacturer name and date.
4.0 Deliverable
The TPOC and KO for this contract will approve all deliverables as specified herein.
4.1 Documentation
All certificates shall include the signature of the Contractor's representative authorized to make such certification. The Government reserves the right to reject defective hardware submitted if the hardware or documentation does not successfully pass Government inspection or testing. The Contractor shall in such event promptly replace, correct, or repair the rejected hardware at the Contractor's expense.
CDRL Spec Section Title
A001 DI-TMSS-80527 0 Operation Manual
A002 DI-QCIC-80798 3.6 Calibration Certificate
A003 DI-SESS-80776 1.0 Technical Data Package
4.2 Deliverables
The Contractor shall notify the Contracting Officer 30 days in advance if the Contractor cannot meet the contract delivery schedule. The Contractor shall be responsible for coordinating and shipping all the units below to the required destination.
Item Year Nomenclature Quantity UOI
1 2026 Oven 1 EA
2 2026 Granulation Dryer 1 EA
Upon delivery of the material and Certificate of Compliance to the Government and once acceptance has been provided then the final payment will be made to the Contractor.
Delivery address provided below:
Naval Surface Warfare Center Indian Head Division
4522 McMahon Road
Bldg. 116, Suite 100
Indian Head, MD 20640
5.0 Controlled Unclassified Information (CUI)
The Contractor may be required to handle Controlled Unclassified Information (CUI). There are numerous types of CUI, e.g. documents with limited distribution statements, documents marked as For Official Use Only (FOUO), etc. The minimum level of protection for all CUI is adherence to FOUO protection standards.
Distribution Statements (DS) and warning labels, such as the Arms Export Control Act Warning, identify additional protection requirements for a given document. Minimum FOUO protection requirements/controls applicable to the performance of this contract for CUI are listed below. Additional protection requirements, as marked on a given CUI document, are in addition to the standards listed.
5.1 Handling/Storage: Access to FOUO is limited to those needing it to conduct official business for the Department of Defense (DoD). FOUO information is not classified information but requires extra precautions to ensure it is not released to the public. During business hours, reasonable steps shall be taken to minimize risk of access by unauthorized personnel. After business hours, FOUO information shall be stored in unlocked containers, desks, or cabinets if Government or Government-contracted building security is provided. If it is not, store in locked desks, file cabinets, bookcases, locked rooms, or similar items.
5.2 Transporting/Transmitting/Release/Destruction: FOUO information shall be transported in a manner that prevents disclosure of the contents. FOUO information may be sent via USPS first-class mail, parcel post, or - for bulk shipments - 4th class mail. Electronic transmission of FOUO information (voice, data, or facsimile) shall be by approved secure communications systems. Transmission via unsecure fax is acceptable if an authorized person is standing by on the receiving end to take custody. All emails containing FOUO or attachments with FOUO must be digitally signed and encrypted when transmitted within a Navy network or to an approved Contractor email address. Transmission of FOUO (i.e. any CUI) to personal email accounts (e.g.
AOL, Yahoo, Hotmail, Comcast, etc.) is strictly prohibited. FOUO sent out of the Contractor's facility electronically must be encrypted (DoD FIPS 140-2 standard). FOUO material shall not be released outside the Contractor's facility except to representatives of DoD. When no longer needed, destroy FOUO by a method that precludes its disclosure to unauthorized individuals.
5.3 Markings: Unclassified documents (paper or electronic) generated in support of this contract which contain FOUO are to be marked "For Official Use Only" at the bottom on the outside of the front cover (if any), on each page containing FOUO information, and on the outside of the back cover (if any). Each paragraph containing FOUO information shall be marked as such. Within a classified document, an individual page with both FOUO and classified information shall be marked at the top and bottom with the highest security classification of information appearing on the page. Individual paragraphs shall be marked at the appropriate classification level, as well as unclassified or FOUO, as appropriate. Within a classified document, an individual page that contains FOUO information, but no classified information shall be marked "For Official Use Only" at the top and bottom of the page, as well as each paragraph that contains FOUO information.
Requirements Replace explosive drying ovens for Organization M41 FY: 2026, AMS: N00174-26-SIMACQ-M41-0008
Additional Regulation or Supplemental Clauses Incorporated by Full Text
C-204-H002 IMPLEMENTATION OF ENHANCED SECURITY CONTROLS ON SELECT
DEFENSE INDUSTRIAL BASE PARTNER NETWORKS
(Sep 2024)
1. System Security Plan and Plans of Action and Milestones (SSP/POAM) Reviews
a) Within thirty (30) days of contract award, the Contractor shall make its System Security Plan(s) (SSP(s)) for its covered contractor information system(s) available for review by the Government at the contractor's facility.
The SSP(s) shall implement the security requirements in Defense Federal Acquisition Regulation Supplement (DFARS) clause 252.204-7012, which is included in this contract. The Contractor shall fully cooperate in the Government's review of the SSPs at the Contractor's facility.
b) If the Government determines that the SSP(s) does not adequately implement the requirements of DFARS clause 252.204-7012 then the Government shall notify the Contractor of each identified deficiency. The Contractor shall correct any identified deficiencies within thirty (30) days of notification by the Government.
The contracting officer may provide for a correction period longer than thirty (30) days and, in such a case, may require the Contractor to submit a plan of action and milestones (POAM) for the correction of the identified deficiencies. The Contractor shall immediately notify the contracting officer of any failure or anticipated failure to meet a milestone in such a POAM.
c) Upon the conclusion of the correction period, the Government may conduct a follow-on review of the SSP(s) at the Contractor's facilities. The Government may continue to conduct follow-on reviews until the Government determines that the Contractor has corrected all identified deficiencies in the SSP(s).
d) The Government may, in its sole discretion, conduct subsequent reviews at the Contractor's site to verify the information in the SSP(s). The Government will conduct such reviews at least every three (3) years (measured from the date of contract award) and may conduct such reviews at any time upon thirty (30) days' notice to the Contractor.
2. Compliance to NIST 800-171
a) The Contractor shall fully implement the CUI Security Requirements (Requirements) and associated Relevant Security Controls (Controls) in NIST Special Publication 800-171 (Rev. 2) (NIST SP 800-171), or establish a SSP(s) and POA&Ms that varies from NIST 800-171 only in accordance with DFARS clause 252.204-7012(b) (2), for all covered contractor information systems affecting this contract.
b) Notwithstanding the allowance for such variation, the contractor shall identify in any SSP and POA&M their plans to implement the following, at a minimum:
(1) Implement Control 3.5.3 (Multi-factor authentication). This means that multi-factor authentication is required for all users, privileged and unprivileged accounts that log into a network. In other words, any system that is not standalone should be required to utilize acceptable multi-factor authentication. For legacy systems and systems that cannot support this requirement, such as CNC equipment, etc., a combination of physical and logical protections acceptable to the Government may be substituted;
(2) Implement Control 3.1.5 (least privilege) and associated Controls, and identify practices that the contractor implements to restrict the unnecessary sharing with, or flow of, covered defense information to its subcontractors, suppliers, or vendors based on need-to-know principles;
(3) Implement Control 3.1.12 (monitoring and control remote access sessions) - Require monitoring and controlling of remote access sessions and include mechanisms to audit the sessions and methods.
(4) Audit user privileges on at least an annual basis;
(5) Implement:
i. Control 3.13.11 (FIPS 140-2 validated cryptology or implementation of NSA or NIST approved algorithms (i.
e. FIPS 140-2 Annex A: AES or Triple DES) or compensating controls as documented in a SSP and POAM);
and,
ii. NIST Cryptographic Algorithm Validation Program (CAVP) (see https://csrc.nist.gov/projects/cryptographic-algorithm-validation-program);
(6) Implement Control 3.13.16 (Protect the confidentiality of CUI at rest) or provide a POAM for implementation which shall be evaluated by the Navy for risk acceptance.
(7) Implement Control 3.1.19 (encrypt CUI on mobile devices) or provide a plan of action for implementation which can be evaluated by the Government Program Manager for risk to the program.
3. Cyber Incident Response
a) The Contractor shall, within fifteen (15) days of discovering the cyber incident (inclusive of the 72-hour reporting period), deliver all data used in performance of the contract that the Contractor determines is impacted by the incident and begin assessment of potential warfighter/program impact.
b) Incident data shall be delivered in accordance with the Department of Defense Cyber Crimes Center (DC3) Instructions for Submitting Media available at http://www.acq.osd.mil/dpap/dars/pgi/docs /Instructions_for_Submitting_Media.docx. In delivery of the incident data, the Contractor shall, to the extent practical, remove contractor-owned information from Government covered defense information.
c) If the Contractor subsequently identifies any such data not previously delivered to DC3, then the Contractor shall immediately notify the contracting officer in writing and shall deliver the incident data within ten (10) days of identification. In such a case, the Contractor may request a delivery date later than ten (10) days after identification. The contracting officer will approve or disapprove the request after coordination with DC3.
4. Naval Criminal Investigative Service (NCIS) Outreach
The Contractor shall engage with NCIS industry outreach efforts and consider recommendations for hardening of covered contractor information systems affecting DON programs and technologies.
5. NCIS/Industry Monitoring
a) In the event of a cyber incident or at any time the Government has indication of a vulnerability or potential vulnerability, the Contractor shall cooperate with the Naval Criminal Investigative Service (NCIS), which may include cooperation related to: threat indicators; pre-determined incident information derived from the Contractor's infrastructure systems; and the continuous provision of all Contractor, subcontractor or vendor logs that show network activity, including any additional logs the contractor, subcontractor or vendor agrees to initiate as a result of the cyber incident or notice of actual or potential vulnerability.
b) If the Government determines that the collection of all logs does not adequately protect its interests, the Contractor and NCIS will work together to implement additional measures, which may include allowing the installation of an appropriate network device that is owned and maintained by NCIS, on the Contractor's information systems or information technology assets. The specific details (e.g., type of device, type of data gathered, monitoring period) regarding the installation of an NCIS network device shall be the subject of a separate agreement negotiated between NCIS and the Contractor. In the alternative, the Contractor may install network sensor capabilities or a network monitoring service, either of which must be reviewed for acceptability by NCIS. Use of this alternative approach shall also be the subject of a separate agreement negotiated between NCIS and the Contractor.
c) In all cases, the collection or provision of data and any activities associated with this statement of work shall be in accordance with federal, state, and non-US law.
(End of Text)
Section D - Packaging and Marking
Section E - Inspection and Acceptance
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
52.246-2 Inspection of Supplies-Fixed-Price. Aug 1996
Overall Contract Inspection/Acceptance Locations
Inspection and Acceptance Location
Both Destination Instructions: Inspect/Accept at Destination
DoDAAC: N00174 CountryCode: USA
NSWC INDIAN HEAD DIVISION
4219 SOUTH PATTERSON ROAD, INDIAN HEAD MD 20640-1533
INDIAN HEAD, MD 20640-1533
UNITED STATES
Christopher Harriott, Technical POC Email: christropher.e.harriott2.civ@us.navy.mil
Inspection and Acceptance Location
Both Destination Instructions: Inspect/Accept at Destination
DoDAAC: N00174 CountryCode: USA
NSWC INDIAN HEAD DIVISION
4219 SOUTH PATTERSON ROAD, INDIAN HEAD MD 20640-1533
INDIAN HEAD, MD 20640-1533
UNITED STATES
Christopher Harriott, Technical POC Email: christropher.e.harriott2.civ@us.navy.mil
Inspection and Acceptance Location
Both Destination Instructions: Inspect/Accept at Destination
DoDAAC: N00174 CountryCode: USA
NSWC INDIAN HEAD DIVISION
4219 SOUTH PATTERSON ROAD, INDIAN HEAD MD 20640-1533
INDIAN HEAD, MD 20640-1533
UNITED STATES
Christopher Harriott, Technical POC Email: christropher.e.harriott2.civ@us.navy.mil
Inspection and Acceptance Location
Both Destination Instructions: Inspect/Accept at Destination
DoDAAC: N00174 CountryCode: USA
NSWC INDIAN HEAD DIVISION
4219 SOUTH PATTERSON ROAD, INDIAN HEAD MD 20640-1533
INDIAN HEAD, MD 20640-1533
UNITED STATES
Christopher Harriott, Technical POC Email: christropher.e.harriott2.civ@us.navy.mil
Section F - Deliveries or Performance
Overall Contract Delivery Period
Contractor Destination
Line Item Delivery Schedule Quantity Address and POC Special Handling/Notes
Delivery Estimated By Delivery Date 19 Aug 2026
1 Each Ship To DoDAAC: N00174 CountryCode: USA
NSWC INDIAN HEAD DIVISION
NAVAL SURFACE WARFARE
CENTER, 4522 MCMAHON ROAD
INDIAN HEAD, MD 20640-1525
UNITED STATES
Christopher Harriott, Technical POC Email: christropher.e.harriott2.civ@us.
navy.mil
FoB Details Contractor Destination
Delivery Estimated By Delivery Date 19 Aug 2026
1 Each Ship To DoDAAC: N00174 CountryCode: USA
NSWC INDIAN HEAD DIVISION
NAVAL SURFACE WARFARE
CENTER, 4522 MCMAHON ROAD
INDIAN HEAD, MD 20640-1525
UNITED STATES
Christopher Harriott, Technical POC Email: christropher.e.harriott2.civ@us.
navy.mil
FoB Details Contractor Destination
Delivery Schedule From date of lead time event to completion of performance 10 Weeks Date of Award
Period of Performance From 10 Jun 2026 To 19 Aug 2026
1 Job Place of Performance DoDAAC: N00174 CountryCode: USA
NSWC INDIAN HEAD DIVISION
NAVAL SURFACE WARFARE
CENTER, 4522 MCMAHON ROAD
INDIAN HEAD, MD 20640-1525
UNITED STATES
Christopher Harriott, Technical POC Email: christropher.e.harriott2.civ@us.
navy.mil
Delivery Schedule From date of lead time event to completion of performance 10 Weeks Date of Award
1 Job Place of Performance DoDAAC: N00174 CountryCode: USA
NSWC INDIAN HEAD DIVISION
NAVAL SURFACE WARFARE
CENTER, 4522 MCMAHON ROAD
INDIAN HEAD, MD 20640-1525
UNITED STATES
Period of Performance From 10 Jun 2026 To 19 Aug 2026
Christopher Harriott, Technical POC Email: christropher.e.harriott2.civ@us.
navy.mil
FoB Details Contractor Destination
FoB Details Contractor Destination
FoB Details Contractor Destination
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
52.242-17 Government Delay of Work. Apr 1984 52.247-34 F.o.b. Destination. Jan 1991
Section G - Contract Administration Data
DFARS Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018
DFARS Clauses Incorporated by Full Text
252.232-7006 Wide Area WorkFlow Payment Instructions. (Jan 2023)
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) As used in this clause- Definitions.
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as Electronic invoicing.
authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) To access WAWF, the Contractor shall- WAWF access.
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice WAWF training.
Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/
(e) Document submissions may be via web entry, Electronic Data Interchange, or File Transfer WAWF methods of document submission.
Protocol.
(f) The Contractor shall use the following information when submitting payment requests and receiving reports WAWF payment instructions.
in WAWF for this contract or task or delivery order:
(1) The Contractor shall submit payment requests using the following document type(s): Document type.
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items-
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
Invoice and Receiving Report (COMBO) Destination / Destination
(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
Invoice and Receiving Report (COMBO) Destination / Destination
(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]
(3) The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in Document routing.
WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC N62838
Issue By DoDAAC N00174
Admin DoDAAC N00174
Inspect By DoDAAC N00174
Ship To Code N00174
Ship From Code ____
Mark For Code ____
Service Approver (DoDAAC) ____
Service Acceptor (DoDAAC) ____
Accept at Other DoDAAC ____
LPO DoDAAC ____
DCAA Auditor DoDAAC ____
Other DoDAAC(s) ____
(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable.")
(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)
(4) The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in Payment request.
accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F. Receiving report.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
usn.ncr.sea-01.mbx.wawf-hq-functional-mail-box@us.navy.mil
(Contracting Officer: Insert applicable information or "Not applicable.")
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
Additional Regulation or Supplemental Clauses Incorporated by Full Text
G-232-H005 SUPPLEMENTAL INSTRUCTIONS REGARDING INVOICING (NAVSEA) (JAN
2019)
(Jan 2019)
(a) For other than firm fixed priced contract line item numbers (CLINs), the Contractor agrees to segregate costs incurred under this contract/task order (TO), as applicable, at the lowest level of performance, either at the sub line item number (SLIN) or CLIN level, rather than at the total contract/TO level, and to submit invoices reflecting costs incurred at that level. Supporting documentation in Wide Area Workflow (WAWF) for invoices shall include summaries of work charged during the period covered as well as overall cumulative summaries by individual labor categories, rates, and hours (both straight time and overtime) invoiced; as well as, a cost break down of other direct costs (ODCs), materials, and travel, by technical instruction (TI), SLIN, or CLIN level. For other than firm fixed price subcontracts, subcontractors are also required to provide labor categories, rates, and hours (both straight time and overtime) invoiced; as well as, a cost breakdown of ODCs, materials, and travel invoiced. Supporting documentation may be encrypted before submission to the prime contractor for WAWF invoice submittal. Subcontractors may email encryption code information directly to the Contracting Officer and Contracting Officer Representative (COR). Shouldthe subcontractor lack encryption capability, the subcontractor may also email detailed supporting cost information directly to the Contracting Officer and COR; or other method as agreed to by the Contracting Officer.
(b) Contractors submitting payment requests and receiving reports to WAWF using either Electronic Data Interchange (EDI) or Secure File Transfer Protocol (SFTP) shall separately send an email notification to the COR and Contracting Officer on the same date they submit the invoice in WAWF. No payments shall be due if the contractor does not provide the COR and Contracting Officer email notification as required herein.
(End of Text)
G-242-H001 GOVERNMENT CONTRACTADMINISTRATION POINTS-OF-CONTACT AND
RESPONSIBILITIES (NAVSEA) (OCT 2023)
(Oct 2023)
(a) The Government reserves the right to administratively substitute any of the points of contact listed below at any time.
(b) The contracting officer is the only person authorized to change this contract or orders issued thereunder. The Contractor shall not comply with any order, direction or request of Government personnel - that would constitute a change - unless it is issued in writing and signed by the Contracting Officer or is pursuant to specific authority otherwise included as part of this contract. If, in the opinion of the contractor, an effort outside the existing scope of this contract is requested, the contractor shall promptly comply with the Notification of Changes clause of this contract.
(c) The points of contact are as follows:
(i) The Procuring Contracting Officer (PCO) is:
Name: Marlene Ridgell Phone: (301) 635-8463 E-mail: marlene.l.ridgell.civ@us.navy.mil
(ii) The Contract Specialist is:
Name: Latrice Whitfield E-mail: latrice.t.whitfield.civ@us.navy.mil
(d) The Contracting Officer's Representative (COR) is the contracting officer's appointed representative for technical matters. The COR is not a contracting officer and does not have the authority to direct the accomplishment of effort which is beyond the scope of the contract or to otherwise change any contract requirements. An informational copy of the COR appointment letter, which provides a delineation of COR authority and responsibilities, will be provided upon award of this contract.
The Contracting Officer's Representative (COR) is:
Name: [ * ] Address:
[ *Street ] [ *City, State, Zip ] Phone: (Area Code) xxx- [xxxx] E-mail: [ * ]
(e) The Alternate Contracting Officer's Representative (ACOR) is responsible for COR responsibilities and functions in the event that the COR is unavailable due to leave, illness, or other official business. The ACOR is appointed by the contracting officer; a copy of the ACOR appointment will be provided upon award of this contract.
The Alternate Contracting Officer's Representative (ACOR) is:
Name: [ * ] Address:
[ *City, State, Zip ] Phone: (Area Code) xxx- [xxxx] E-mail: [ * ]
(f) The Technical Point of Contact (TPOC) is the contracting officer's representative for technical matters when a COR is not appointed. The TPOC is responsible for technical issues of contract administration, such as providing all items of Government Furnished Information (GFI), Government Furnished Material (GFM) and Government Furnished Equipment (GFE) if specified in the contract as well as the inspection and acceptance of all contract deliverables.
The Technical Point of Contact (TPOC) is:
Name: [ * ] Address: [ *Street ] [ *City, State, Zip ] Phone: (Area Code) xxx- [xxxx] E-mail: [ * ]
(g) The Alternate Technical Point of Contact (ATPOC) is responsible for TPOC responsibilities and functions in the event that the TPOC is unavailable due to leave, illness, or other official business.
The Alternate Technical Point of Contact (ATPOC) is:
Name: [ * ] Address:
[ *City, State, Zip ] Phone: (Area Code) xxx- [xxxx] E-mail: [ * ]
(h) The Authorized Ordering Person(s) for Per-Call Maintenance is responsible for issuing and maintaining records for any per-call orders for remedial maintenance placed under this contract. No per-call order shall be placed outside the scope of this contract and the cumulative total of all orders shall not be in excess of any not-to-exceed amount specified in the contract. Per-call orders shall not, in any way, modify any terms and conditions of the contract.
(i) The Authorized Ordering Person(s) for Per-Call Maintenance is:
Name: [ * ] Address:
[ *Street ] [ *City, State, Zip ] Phone: (Area Code) xxx- [xxxx];
E-mail: [ * ]
(j) The Contractor's point of contact for performance under this contract is:
Name: [ * ] Address:
[ *Street ] [ *City, State, Zip ] Phone: (Area Code) xxx- [xxxx] E-mail: [ * ]
[ * ] To be completed at contract award
(End of Text)
G-242-H002 HOURS OF OPERATION AND HOLIDAY SCHEDULE (NAVSEA) (JUL 2021) (Jul 2021)
(a) The policy of this activity is to schedule periods of reduced operations or shutdown during holiday periods. Deliveries will not be accepted on Saturdays, Sundays or Holidays except as specifically requested by the [insert activity name]. All goods or services attempted to be delivered on a Saturday, Sunday or Holiday without specific instructions from the Contracting Officer or his duly appointed representative will be returned to the contractor at the contractor's expense with no cost or liability to the U.
S. Government.
(b) The federal Government observes public Holidays that have been established under 5 U.S.C. 6103. The actual date of observance for each of the holidays, for a specific calendar year, may be obtained from the OPM website at OPM.GOV or by using the following direct link: https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/.
(c) Delayed Opening, Early Dismissal and Closure of Government Facilities. When a Government facility has a delayed opening, is closed or Federal employees are dismissed early (due to severe weather, security threat, security exercise, or a facility related problem) that prevents personnel from working, onsite contractor personnel regularly assigned to work at that facility shall follow the same reporting and/or departure directions given to Government personnel. The contractor shall not direct charge to the contract for such time off, but shall follow parent company policies regarding taking leave (administrative or other). Non-essential contractor personnel, who are not required to remain at or report to the facility, shall follow their parent company policy regarding whether they should go/stay home or report to another company facility. Subsequent to an early dismissal, delayed opening, or during periods of inclement weather, onsite contractors should monitor the OPM website as well as radio and television announcements before departing for work to determine if the facility is closed or operating on a delayed arrival basis.
(d) When Federal employees are excused from work due to a holiday or a special event (that is unrelated to severe weather, a security threat, or a facility related problem), on site contractors shall continue working established work hours or take leave in accordance with parent company policy. Those contractor employees who take leave shall not direct charge the non-working hours to the contract. Contractors are responsible for predetermining and disclosing their charging practices for early dismissal, delayed openings, or closings in accordance with the FAR, applicable cost accounting standards, and the company's established policy and procedures. Contractors shall follow their disclosed charging practices during the contract period of performance, and shall not follow any verbal directions to the contrary. The Contracting Officer will make the determination of cost allowability for time lost due to facility closure in accordance with FAR, applicable Cost Accounting Standards, and the Contractor's established accounting policy and procedures.
(e) If you intend to visit the Contracts Office, it is advised that you call for an appointment at least 24 hours in advance.
(f) The hours of operation are as follows:
N0017426Q1104 https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/ https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays
AREA FROM TO
Building 116 0730 - 1130 1230 - 1530
(g) All deliveries to the Receiving Officer, Building 116 ,shall be made Monday through Friday from to , local 0730 - 1130 1230 - 1530 time. Deliveries will not be accepted after . No deliveries will be accepted on federal government holidays. 1530
(End of Text)
Section H - Special Contract Requirements
1. Voluntary Protection Program:
1.1. In August 2006, Indian Head Division (IHD) Naval Surface Warfare Center (NSWC) was nominated to participate in the DoD Voluntary Protection Program Center of Excellence Implementation Initiative of the Defense Safety Oversight Council (DSOC). The Voluntary Protection Program (VPP) was established by the Occupational Safety and Health Administration (OSHA) in 1982 to recognize and promote effective worksite-based safety and health management systems. IHD NSWC, through the utilization of VPP, desires to be a model of safety and health excellence. VPP's emphasis on trust and cooperation between OSHA, the employer, employees, employees representatives, and contractors complements the Agency's enforcement activity but does not take its place. All parties, including Contractors, are to work together to identify and resolve any safety and health problems that may arise, yet obtain Contracting Officer approval of any changes that would impact the terms of the contract. IHD NSWC as the VPP participant develops and implements systems to effectively identify, evaluate, prevent, and control occupational hazards so that injuries and illnesses to employees and contractors are prevented. Contractor and sub-contractor personnel are subject to occupational safety and health oversight. This oversight will be accomplished by IHD NSWC personnel and Contracting Officers. Contractors, sub-contractors, and their employees, while in performance of a contractual action on-site within the geographical boundaries of Naval Support Facility (NSF) Indian Head, shall be subject to the requirements of the IHDIVNAVSURFWARCENINST 5100.22, "Safety Manual" regardless of the type or duration of the contract.
Appendix 13-A, of the chapter 13 entitled "Contractor Safety Requirements When Performing Work at the Naval Support Facility (NSF) Indian Head, MD" shall be signed by the Contractor prior to commencement of services on-site at NSF Indian Head. The Contractor shall maintain one signed copy for future reference in educating its personnel and sub-contractors. A second signed copy shall be provided to the Contracting Officer to be maintained in the contract file. If an occupational safety or health related injury or illness occurs during the performance or as a result of this contractual action, the Contractor shall notify the Contracting Officer Representative (COR) as soon as practicable, who will notify the Safety Office and the Contracting Officer. 1.2 In support of VPP and in compliance with Chapter 13 of the Safety Manual, entitled "Contractor Safety," all Contractors performing on-site at NSF Indian Head shall comply with the following:
1.2.1 Public Law 91-596 (and Amendments), also known as the Occupational Safety and Health
Act of 1970, establishes that all employers, including Contractors, are responsible, as far as possible, for providing every employee a safe and healthful working environment. All employers, including Contractors, shall conform to the standards as issued by OSHA. Contractors are responsible for complying with safety requirements specified in the contract as well as all
Federal, State, and local safety and security regulations. Non-compliance may be cause for the removal of a Contractor or any Contractor employee from the activity and such non-compliance may form the basis for contractual action, up to and including termination for default.
1.2.2 Contractor personnel shall participate in basic safety awareness and hazard identification training offered by the Government activity at the work area they are supporting. Contractors performing on-site shall attend area weekly safety meetings and annual safety stand-downs, as determined by the COR.
1.3 The best Safety and Health Programs involve every level of the organization, instilling a safety culture that reduces accidents for workers and improves the bottom line for managers. When Safety and Health are part of the organization and a way of life, everyone wins. IHD NSWC is committed to safety excellence. The Contractor shall familiarize itself with the IHDIVNAVSURFWARCENINST 5100.22, "Safety Manual," Appendix 13-C entitled
"OSHA Voluntary Protection program (VPP) Fundamentals Training for Contractors".
2. Contractor On Site Training:
2.1 A Contractor providing support on-site at any IHD NSWC site may be required to have its on-site Contractor personnel participate in training covering rules, practices, procedures, equipment and systems, as needed, based on the type of support being provided. This training may include, but is not limited to: Operation Security training (OPSEC); Personally Identifiable Information training; DoD Information Assurance Awareness training; Information Technology Security; Voluntary Protection Program (VPP) training; and Personnel Security training.
2.1.2 This training will be provided at no cost by the IHD NSWC site and will take place on-site during normal contract working hours without any additional compensation for the Contractor. This training does not relieve the Contractor of its responsibility to train its employees in such areas as environment, health, safety, security, sexual harassment, ethics, etc. to ensure compliance with all federal, state, and local laws and DoD regulations.
Additional Regulation or Supplemental Clauses Incorporated by Full Text
H-246-H001 CALIBRATION SYSTEM REQUIREMENTS (NAVSEA) (FEB 2023) (Feb 2023)
(a) Definitions:
(1) All definitions, with the exception of Commercial Service Provider, are found in OPNAVINST3960.16 (series).
(2) Commercial Service Providers. Suppliers of tools, instruments, fixtures, test, measurement, and diagnostic equipment, including original equipment manufacturers, who may calibrate their own products but are not engaged in calibration as a major line of business, and other commercial laboratories that provide either calibration services in support of Navy contracts, or low volume, model specific, or unique parameter calibration services.
(b) The accuracy of Navy and Contractor calibrated equipment used for quantitative and qualitative measurements are ensured through measurement traceability. The Contractor is required to ensure that all calibrated equipment used for quantitative or qualitative measurements required for the research, design, test, production, and maintenance of NAVSEA systems will be maintained and calibrated in accordance with references OPNAVINST 3960.16 and NAVSEAINST 4734.1. Calibration sources shall be accredited by a U.S.
based, Navy approved accreditation body to U.S. national standards:
(1) ANSI/NCSL Z540.3, Requirements for the Calibration of Measuring and Test Equipment, dated 3 Aug 2006; or
(2) ISO/IEC 17025:2017, General Requirements for the Competence of Testing and Calibration Laboratories (3rd Edition), dated 29 Nov 2017; or
(3) Certified by the U.S. Navy to NAVSEA 04-4734, Navy and Marine Corps Calibration Laboratory Audit /Certification Manual.
(c) ISO/IEC 17025:2017 and ANSI/NCSL Z540.3 accreditations must be performed by a U.S. based accreditation body. Calibration accreditation must include the parameters required to execute the calibration at appropriate ranges and tolerances. A calibration certificate meeting the requirements of ANSI/NCSL Z540.3 or
ISO/IEC 17025:2017 must be provided with the returned calibrated unit. The calibration certificate must be evaluated to confirm that the calibration was performed within the laboratory's accreditation scope and that each calibration measurement met or exceeded a 4:1 Test Uncertainty Ratio (TUR).
(d) Certification to Navy standard NAVSEA 04-4734, is acceptable in place of ANSI/NCSL Z540.3 and ISO…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .