Solicitation Amendment N0017425Q11160001 SF 30.pdf
PDF 601 KB Posted
- Attached to
- Sleeve / Pin, Firing / Housing, Firing Pin
- Solicitation number
- N0017425Q1116
About this file
This document is a Performance Work Statement (PWS) for a federal contract modification to manufacture hardware for Aviation Critical Safety Items (ACSIs) at Naval Surface Warfare Center Indian Head Division (NSWC IHD). The amendment increases quantities for multiple line items: Housing, Firing Pin increased from 150 to 800 units, Pin, Firing increased from 1,100 to 1,600 units, and Sleeve increased from 150 to 800 units.
The contractor must manufacture components using NSWC IHD drawings, adhering to strict quality control standards including ISO 9001:2015 certification, first article testing, dimensional inspection, and product certification. Deliverables include 10 first article units and 800-1,600 production units of each component, to be shipped to Naval Surface Warfare Center Indian Head Division in Indian Head, Maryland. The contract requires compliance with export control regulations, handling of Controlled Unclassified Information, and Operations Security (OPSEC) requirements.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
Created On:
20 Nov 2025, 11:45 AM Greenwich Mean Time
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Section A - Solicitation/Contract Form
The following changes have been made:
INFORMATION FROM TO
Header only - Purchase Requisition Number AMS00595490
N0017425Q11160001
Section B - Supplies or Services & Prices or Costs
The following CLIN(s) / SLIN(s) / ELIN(s) were modified:
INFORMATION FROM TO CHANGED BY
Quantity 150 800 +650
INFORMATION FROM TO CHANGED BY
Quantity 1,100 1,600 +500
INFORMATION FROM TO CHANGED BY
Quantity 150 800 +650
Section C - Description/Specifications/Statement of Work
Miscellaneous text in this section has been modified to:
REVISED
MANUFACTURING OF Hardware USING NSWC IHD DRAWINGS
PERFORMANCE WORK STATEMENT
1.0 Scope of Work
The requirements in this document contain the information necessary to manufacture hardware for assembly in fleet-deliverable Aviation Critical Safety Items (ACSIs) at Naval Surface Warfare Center Indian Head Division
(NSWC IHD).
2.0 Applicable Documents
CCU-22 - CDRL A001 Inspection
CCU-22 - CDRL A002 CoC
CCU-22 - CDRL A003 CoA CCU-22 - CDRL A004 Inspection Test Plan
5184326 Rev. H Housing, Firing Pin
5184326 Form 43
512-174-0073 Rev. A Pin, Firing
512-174-0073 Form 43
11740614 Rev. F Sleeve
11740614 Form 43
ASTM A108-13
ASTM A29/A29M-12
AMS-QQ-P-416G
MIL-A-8625F
SAE AMS 4122L
SAE AMS 4122N
2.1 General Specifications
American National Standards Institute (ANSI)/American Society for Quality (ASQ) Standards:
ANSI/ASQ Z1.4 Sampling Procedures and Tables for Inspection by Attributes
Code of Federal Regulations (CFR):
22 CFR 121 The United States Munitions List
22 CFR 122 Registration of Manufacturers and Exporters
Department of Defense (DoD) Directives:
5230.25 Withholding of Unclassified Technical Data From Public Disclosure
International Organization for Standardization (ISO)/International Electrotechnical Commission (IEC) Standards:
ISO 9001 Quality Management Systems
ISO/IEC 17025 General Requirements for the Competence of Testing and Calibration Laboratories
Technical Drawings
Department of Defense Drawings:
5184326 Rev. H Housing, Firing Pin
11740614 Rev. F Sleeve
512-174-0073 Rev A Pin, Firing
2.2 Conflicting Document Requirements
If there are any conflicts between specifications, drawings, or requirements listed herein, the contractor shall notify the Contracting Officer (KO) and the Technical Point of Contact (TPOC), in writing for interpretation, clarification, and resolution.
3.0 Requirements
3.1 General Manufacturing
The Contractor shall fabricate, inspect, test, and deliver components in accordance with the applicable drawings and specifications. Components shall be packaged by part number and ready for use. The Contractor shall provide, design, and fabricate all necessary tooling to manufacture and dimensionally inspect the components, and provide data as detailed herein.
The Prime Contractor shall bear the ultimate responsibility for all deliveries and performance of all requirements under this contract. The Prime Contractor shall monitor and maintain all subcontractor relationships. At the Government's sole discretion, the Government may apply quality and/or on-time delivery issues stemming from the work of a subcontractor to the Prime Contractor's quality performance metrics.
3.2 Cadmium Plating
3.2.1 Specifications:
Unless otherwise specified, parts are to be cadmium plated to the requirements of SAE AMS-QQ-P-416, Revision G, plus the following.
3.2.2 Coverage:
There shall be no rack marks, air bubbles, pin holes nor any other bare areas, except those specifically denoted as such by the contract/purchase order/or bankcard order. All internal and external threads shall have at least a presence of plating (verifiable by visual examination) and a maximum coverage thickness of .
00040 inches. All surfaces not controlled for plating thickness by the contract/purchase order/or bankcard order shall have presence of plating (verifiable by visual inspection) and a maximum coverage thickness of .
00080 inches. These requirements shall be met regardless of part configuration, contour, part size, and any in-process controls needed to perform the plating. (This includes all internal and external surfaces.)
3.2.3 Adhesion:
Plating shall show no indication of separation from the base metal when tested in accordance with ASTM D3359-2023 and shall meet adhesion requirements of the governing plating specification.
3.2.4 Embrittlement Relief:
All cadmium plated parts, regardless of hardness, must be baked, after plating, but prior to chromate finish, as specified within SAE AMS-QQ-P-416G, Section 3.2.7.
3.2.5 Corrosion and Hydrogen Embrittlement Tests:
Although the vendor is not required to perform this test, the government reserves the right to perform the test at any time, at government expense.
3.3 Test and Inspection
The Contractor shall maintain and control processes to inspect and test components as described in this PWS.
These processes should cover all phases from the ordering of the material to the Government acceptance of the finished product.
3.3.1 First Article Testing
The Contractor shall submit First Article Test (FAT) samples to the Government if the Contractor has not provided contract deliverables for the same drawing numbers within the last 3 years.
The Contractor shall submit an Inspection Test Plan in accordance with DI-QCIC-81110 per CDRL A004 to the Government for review and approval prior to first article manufacture and delivery. The Contractor shall submit a first article sample of 5 EA complete units prior to the first delivery of any production hardware. The first article units shall be fully representative of those proposed for production, and demonstrate the adequacy and suitability of the Contractor's processes and procedures in complying with the requirements set forth by the drawings and specifications.
Any production by the Contractor before formal acceptance of the first article sample shall be at the Contractor's cost risk.
3.3.2 Dimensional Inspection
The Contractor is responsible for performing in-house inspections to ensure each first article or production component and dimension conforms 100% to the contract, PWS, and product dimensional requirements. The Contractor shall provide copies of in-process dimensional data and/or proof of inspections, such as floor shop travelers or final QA inspections, as requested by the Government.
The Contractor shall submit a Final Dimensional Inspection Report in accordance with DI-NDTI-80809 per CDRL A001 for each deliverable line item. The final dimensional inspection report shall include either a list of all drawing dimensions and tolerances, and their actual measured values, or a marked-up copy of the drawing with actual measured values written in red next to the corresponding dimension.
3.3.3 Product Certification
The Contractor shall submit a certificate of compliance in accordance with DI-MISC-81356A per CDRL A002 to accompany the shipment of each first article and production lot, as required by Table 3. The certificate shall state compliance of the material with its respective drawing or specification, and contract/order requirements.
The certificate shall as a minimum state the company name, contract/order number, drawing or specification number, and date.
The Contractor shall submit a certificate of analysis/test in accordance with DI-MISC-82386 per CDRL A003 showing the first article or production material has been sampled and/or tested and found to be within the minimum requirements of the specification/drawing/contract, as required by Table 1. The certificate shall be forwarded to the Government; one (1) copy to accompany the shipment (in the packing list envelope), and one
(1) copy mailed to arrive at time of receipt of the shipment (mark the certificate to the attention of the designated POC above). Each certificate must be traceable to the material covered by the certificate. The certificate shall state, above the signature of a legally authorized representative of the company the following:
Both Certificates of Analysis and Compliance shall state, above the signature of a legally authorized representative of the company, the following:
"This certification concerns a matter within the jurisdiction of an agency of the United States and making a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code 1001."
Table 1: Certification Requirements
Test Requirement Certificate
Dwg Location
Material 5184326 REV H Note 2 (M101) Analysis
Hardness 5184326 REV H Note 7 (M125) Analysis
Heat Treat 5184326 REV H Note 7 (M125) Compliance
Plating 5184326 REV H Note 5 (M102) & SOW section 3.2 Compliance
Material 11740614 REV F Note 2 (M106) Analysis
Plating 11740614 REV F Note 5 (M107) Compliance
Material 512-174-0073 REV A Note #6 (M101) Analysis
Hardness 512-174-0073 REV A Note #5 (M111) Analysis
Plating 512-174-0073 REV A Note #4 (M109) Compliance
3.4 Quality Control
3.4.1 Quality System and Quality Control Processes
The Contractor shall maintain a quality system which adheres, at minimum, to the requirements of ISO 9001:
2015 standards.
The Contractor quality management system shall ensure products are in compliance with the applicable drawings, specifications, and contract. The quality management system shall outline processes to identify, record, and disposition nonconforming material or other characteristic discrepancies for the entire duration of this contract. P rocedures, planning, and all other relevant documentation and data which comprise the quality management system, if requested, shall be made available to the Government for review.
3.4.2 Calibration of Measuring and Testing Equipment
Measuring and testing equipment used by the contractor shall, at a minimum, adhere to the requirements of ISO
/IEC 17025:2017.
3.4.3 Acceptance of Product
Final acceptance of first article samples and production deliverables will be determined by Government dimensional inspection and certification verification at Government destination for each deliverable line item.
The Government shall complete sample testing within 60 days of receipt of all documentation and deliverables relevant to the relevant line item. Unless otherwise stated, the Government sampling plan shall be in accordance with Table 2. The Government reserves the right to perform additional inspection and testing of hardware to verify acceptability. This may include testing at other facilities.
Table 2: ACSI Sampling Plan
ASQ Z1.4 [ANSI/ASQ Z1.4-2003 (R2013) - October 2013]:
Critical: 100%
Major: Level II
Minor: Level I
3.4.4 Government-Identified Nonconformity Reporting Procedures
The Government shall alert the Contractor to any nonconforming deliverables within one (1) working day of identifying the nonconformity. The Contractor shall respond with their recommended disposition on the deliverables within one (1) working day.
3.5 Export Control
The Contractor shall comply with either one, or both, of the export control options below.
3.5.1 International Trafficking in Arms Regulations (ITAR) Compliance
The Contractor shall maintain ITAR compliance through registration in accordance with 22 CFR 122 to export Category III and IV munitions components, as defined by 22 CFR 121.
3.5.2 Joint Certification Program (JCP) Registration
The Contractor shall maintain JCP registration and a DD Form 2345 to comply with DoD Directive 5230.25.
The Contractor shall be responsible for packing and packaging of deliverables to prevent any potential damage during transport. The Contractor shall label completed parts packaging to include component name, quantity, contract number, drawing number, revision, and manufacturer name and date. Packaging quantities and methods shall be in accordance with applicable Form 43.
3.6 Preservation
The Contractor shall be responsible for packing and packaging of deliverables to prevent any potential damage during transport. The Contractor shall label completed parts packaging to include component name, quantity, contract number, drawing number, revision, and manufacturer name and date. Packaging quantities and methods shall be in accordance with applicable Form 43
4.0 Deliverables
The Technical Point of Contact and Contracting Officer (KO) for this contract will approve all deliverables as specified. The following Certificates shall include the signature of the Contractor's representative authorized to make such certification.
Table 3: Contract Data Requirements List
CDRL Spec Section Title
A001 DI-NDTI-80809 3.3.2 Final Dimensional Inspection Report
A002 DI-MISC-81356A 3.3.3 Certificate of Compliance
A003 DI-MISC-82386 3.3.3 Certificate of Analysis
A004 DI-QCIC-81110 3.3.1 Inspection Test Plan
4.1 Hardware Delivery
The Contractor shall notify the Contracting Officer 30 days in advance if the Contractor cannot meet the contract delivery schedule.
The Contractor shall be responsible for coordinating and shipping all the units below to the required destination.
Table 4: Hardware Deliverables
Item Year Drawing Rev Nomenclature Qty UOI
1 Base 5184326 H (FAT)Housing, Firing Pin 10 EA
2 Base 5184326 H Housing, Firing Pin 800 EA
3 Base 512-174-0073 A (FAT)Pin, Firing 10 EA
4 Base 512-174-0073 A Pin, Firing 1600 EA
5 Base 11740614 F (FAT)Sleeve 10 EA
6 Base 11740614 F Sleeve 800 EA
Delivery address provided below:
Naval Surface Warfare Center Indian Head Division
ATTN: David Dias/Sofia Garcia
4522 McMahon Road
Bldg. 116, Suite 100
Indian Head, MD 20640
5.0 ++*Controlled Unclassified Information (CUI)
The Contractor may be required to handle Controlled Unclassified Information (CUI). There are numerous types of CUI, e.g. documents with limited distribution statements, documents marked as For Official Use Only (FOUO), etc. The minimum level of protection for all CUI is adherence to FOUO protection standards.
Distribution Statements (DS) and warning labels, such as the Arms Export Control Act Warning, identify additional protection requirements for a given document. Minimum FOUO protection requirements/controls applicable to the performance of this contract for CUI are listed below. Additional protection requirements, as marked on a given CUI document, are in addition to the standards listed.
5.1 Handling/Storage: Access to FOUO is limited to those needing it to conduct official business for the Department of Defense (DoD). FOUO information is not classified information but requires extra precautions to ensure it is not released to the public. During business hours, reasonable steps shall be taken to minimize risk of access by unauthorized personnel. After business hours, FOUO information shall be stored in unlocked containers, desks, or cabinets if Government or Government-contracted building security is provided. If it is not, store in locked desks, file cabinets, bookcases, locked rooms, or similar items.
5.2 Transporting/Transmitting/Release/Destruction: FOUO information shall be transported in a manner that prevents disclosure of the contents. FOUO information may be sent via USPS first-class mail, parcel post, or - for bulk shipments - 4th class mail. Electronic transmission of FOUO information (voice, data, or facsimile) shall be by approved secure communications systems. Transmission via unsecure fax is acceptable if an authorized person is standing by on the receiving end to take custody. All emails containing FOUO or attachments with FOUO must be digitally signed and encrypted when transmitted within a Navy network or to an approved Contractor email address. Transmission of FOUO (i.e. any CUI) to personal email accounts (e.g.
AOL, Yahoo, Hotmail, Comcast, etc.) is strictly prohibited. FOUO sent out of the Contractor's facility electronically must be encrypted (DoD FIPS 140-2 standard). FOUO material shall not be released outside the Contractor's facility except to representatives of DoD. When no longer needed, destroy FOUO by a method that precludes its disclosure to unauthorized individuals.
5.3 Markings: Unclassified documents (paper or electronic) generated in support of this contract which contain FOUO are to be marked "For Official Use Only" at the bottom on the outside of the front cover (if any), on each page containing FOUO information, and on the outside of the back cover (if any). Each paragraph containing FOUO information shall be marked as such. Within a classified document, an individual page with both FOUO and classified information shall be marked at the top and bottom with the highest security classification of information appearing on the page. Individual paragraphs shall be marked at the appropriate classification level, as well as unclassified or FOUO, as appropriate. Within a classified document, an individual page that contains FOUO information, but no classified information shall be marked "For Official Use Only" at the top and bottom of the page, as well as each paragraph that contains FOUO information.
6.0 OPSEC
6.1 Operations Security (OPSEC) Requirements: Contractor personnel are subject to applicable provisions of Department of Defense Manual 5205.02-M, Enclosure 6 and NSWC IHEODTD 3070.3A OPSEC Program. Contractor personnel supporting this contract/task order must complete government approved or provided OPSEC awareness training. OPSEC education and training may be accomplished through established programs within the DoD Component, using external resources such as the Interagency OPSEC Support Staff (IOSS) and the Defense Security Service Academy, or a combination (i.e. https://securityawareness.usalearning.
gov/opsec/). Contractor personnel may have access to government Critical Information (CI), Indicators and Observables that may indirectly disclose CI. CI includes but is not limited to: Ship movements and schedules, weapons and sensor system installations, capabilities, and configurations; specific platform installations and characteristics, test schedules, deficiencies and vulnerabilities. Indicators and Observables may include but are not limited to: Outdoors system testing; ship's external hull or superstructure modifications; shipboard equipment, ordnance, weapons, fuels, and/or stores loading/unloading operations, and/or personnel or aircraft embarkation. No CI, Indicators, or Observables may be divulged to third parties (including other company employees who are not subject to this contract) without approval of the local command Security Officer, OPSEC Officer, or the NSWC IHD OPSEC Program Manager.
https://securityawareness.usalearning.gov https://securityawareness.usalearning.gov
| IDCode: J |
| Page: 1 |
| Pages: 19 |
| AmendNo: 0001 |
| EffDate: 17 Nov 2025 |
| ReqNo: See Continuation Sheet |
| ProjNo: |
| IssCode: N00174 |
| AdmCode: |
| IssuedBy: NSWC INDIAN HEAD DIVISION |
4219 SOUTH PATTERSON ROAD, INDIAN HEAD MD 20640-1533
INDIAN HEAD, MD 20640-1533
UNITED STATES
FRANCINE KEYS, Email: francine.l.keys.civ@us.navy.mil Telephone: 3017446687 AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: N0017425Q1116 |
| SolDate: 18 Sep 2025 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: 1 |
| OffrNoEx: Off |
| NoCopies: 1 |
| ApprData: See Section G - Contract Administration Data |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: The purpose of this modification is to change the quantity. |
| ContNameTitle: |
| CoNameTitle: |
| ContDate: |
| CODate: |
File details come from the government source that posted it. Updated .