N0017423R0063_Final.docx

DOCX document 115 KB Posted

Attached to
MK 85 Nozzle Assembly RFP Federal contract opportunity
Solicitation number
N0017423R0063
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This document outlines a request for proposal for MK 85 nozzle assemblies. The Naval Sea Systems Command is seeking proposals to manufacture nozzle assemblies, nozzle bodies, carbon inserts, and weather seals in accordance with provided technical drawings. The contractor will be responsible for first article testing, dimensional inspection, and providing certificates of compliance and analysis. The contract consists of a base year order of 550 nozzle assemblies with two option years that may include additional quantities. Proposals are due within 350 days of receipt for first article testing. Production delivery is required within 715 days of order and option years within 1080 days.

View the file

Other files for this federal contract opportunity

Other files attached to MK 85 Nozzle Assembly RFP, newest first.
File Type Posted
23R0063-00001.docx DOCX document
MK85_Nozzle_CDRL_A004_TestPlan_v1.pdf PDF
MK85_Nozzle_CDRL_A001_Progress_v1.pdf PDF
MK85_Nozzle_CDRL_A002_Risk_v1.pdf PDF
MK85_Nozzle_CDRL_A007_CoA_v1.pdf PDF
MK85_Nozzle_CDRL_A003_FACAR_v1.pdf PDF
MK85_Nozzle_CDRL_A008_QualCert_v1.pdf PDF
MK85_Nozzle_CDRL_A006_CoC_v1.pdf PDF
MK85_Nozzle_CDRL_A005_Inspection_v1.pdf PDF
PastPerformanceMatrixrev3.doc DOC document
Attachment-2_Past_Performance_Questionnaire.doc DOC document
Contract-Administration-Plan_N0017423R0063.docx DOCX document
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N0017423R0063

Section B - Supplies or Services and Prices

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
20
Each

First Article Test Sample

FFP

MK85 Nozzles including: 10 Nozzles, five (5) Nozzle bodies and five (5) Carbon inserts in accordance with the Statement of Work (SOW) and drawings.

FOB: Destination

PSC CD: 1340

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
550
Each

Nozzle Assembly (Base Year)

Production QTY (Base Year) In accordance with the SOW and drawings

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot

CDRLs (Base Year)

Contract Data Requirements List (CDRLS) in accordance with A001 through A008 and the SOW Not Separately Priced

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
550
Each
OPTION
Nozzle Assembly Option 1

FFP

Option 1: Production QTY in accordance with the SOW and drawings.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
2
Each
OPTION
Nozzle Bodies Option 1

FFP

Option 1: In accordance with the Statement of Work (SOW) and drawings.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
2
Each
OPTION
Carbon Inserts Option 1

FFP

Option 1: In accordance with the Statement of Work (SOW) and drawings.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot
OPTION
CDRLs (Option 1)

FFP

Contract Data Requirements List (CDRLS) in accordance with A001 through A008 and the SOW Not Separately Priced

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
550
Each
OPTION
Nozzle Assembly Option 2

FFP

Option 2: Production QTY (Base Year) In accordance with the SOW and drawings

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
2
Each
OPTION
Nozzle Bodies Option 2

FFP

Option 2: In accordance with the Statement of Work (SOW) and drawings.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
2
Each
OPTION
Carbon Inserts Option 2

FFP

Option 2: In accordance with the Statement of Work (SOW) and drawings.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot
OPTION
CDRLs (Option 2)

FFP

Contract Data Requirements List (CDRLS) in accordance with A001 through A008 and the SOW Not Separately Priced

NET AMT

Section C - Descriptions and Specifications

STATEMENT OF WORK

MANUFACTURING OF MK 85 NOZZLES USING NSWC IHD DRAWINGS

PERFORMANCE-BASED STATEMENT OF WORK

1.0 Scope of Work

The requirements in this document contain the information necessary for a Contractor to manufacture nozzles used for assembly in MK 85 Rocket-Assisted Takeoff Motor (RATO) at Naval Surface Warfare Center Indian Head Division (NSWC IHD).

2.0 Applicable Documents

2.1 General Specifications

American National Standards Institute (ANSI)/National Conference of Standards Laboratories (NCSL) Standards:

ANSI/NCSL Z540.3
Requirements for the Calibration of Measuring and Test Equipment

American Society for Testing and Materials Standards:

ASTM D3951
Standard Practice for Commercial Packaging

American Society of Mechanical Engineers Standards:

ASME B1.3
Screw Thread Gaging Systems for Acceptability: Inch and Metric Screw Threads

Code of Federal Regulations (CFR):

22 CFR 121
The United States Munitions List
22 CFR 122
Registration of Manufacturers and Exporters

Department of Defense (DoD) Directives:

5230.25
Withholding of Unclassified Technical Data From Public Disclosure

Department of Defense Military Standard:

MIL-A-46146
Adhesive-Sealant, Silicone
MIL-STD-1916
DoD Preferred Methods for Acceptance of Product

International Organization for Standardization (ISO)/International Electrotechnical Commission (IEC) Standards:

ISO 9001
Quality Management Systems
ISO/IEC 17025
General Requirements for the Competence of Testing and Calibration Laboratories

Society of Automotive Engineers (SAE) Standards:

SAE AS6174
Counterfeit Material; Assuring Acquisition of Authentic and Conforming Material

2.2 Technical Drawings

Department of the Navy Technical Drawings:

1638AS302
Nozzle Assembly
1638AS303
Nozzle Body
1638AS304
Carbon Insert
1638AS305
Weather-Seal
1638AS307
Carbon Graphite

2.3 Conflicting Document Requirements

If there are any conflicts between specifications, drawings, or requirements listed herein, the contractor shall notify the Contracting Officer (KO) and the Technical Point of Contact (TPOC), in writing for interpretation, clarification, and resolution.

3.0 Requirements

3.1 General Manufacturing

The Contractor shall fabricate, inspect, test, and deliver complete Nozzle Assemblies in accordance with the drawing 1638AS302 Rev. B, packaged by part number, and ready for use. The Contractor shall provide or fabricate all the components in Table 1 below for each assembly. The Contractor shall provide, design, and fabricate all necessary tooling to manufacture and dimensionally inspect the components, and provide data as detailed herein.

Table 1: Single Nozzle Assembly Composition

Document
Rev
Description
Qty [-]
UOI [-]
MIL-A-46146, Group I, Type I
NR
Adhesive-Sealant, Silicone
As Required
1638AS303
B
Nozzle Body
1
EA
1638AS304
NR
Carbon Insert
1
EA
1638AS305
NR
Weather-Seal
1
EA

3.1.1 Subcontractor Management

The Prime Contractor shall bear the ultimate responsibility for all deliveries and performance of all requirements under this contract. The Prime Contractor shall monitor and maintain all subcontractor relationships. At the Government’s sole discretion, the Government may apply quality and/or on-time delivery issues stemming from the work of a subcontractor to the Prime Contractor’s quality performance metrics.

3.1.2 Kickoff Meeting

The Contractor shall host a Government/Contractor Kickoff Meeting or telecom to establish Government/Contractor interfaces within 15 workings days after contract award, or as mutually agreed to by the Government and the Contractor. The anticipated meeting objectives shall include team introduction, general program discussions, as well as more specific information in regards to the supported program.

3.1.3 Monthly Reports

The contractor shall submit progress reports in accordance with DI-MGMT-80555 per CDRL A001 and risk management status reports in accordance with DI-MGMT-81809 per CDRL A002 on the last working day of each month. Any sections deemed not applicable by the contractor shall be marked as such; a brief justification may be provided. Monthly reports shall be the vehicle whereby the government is apprised as to work accomplished, issues, risks, and other reporting requirements.

3.1.4 Failure Analysis and Corrective Action Report (FACAR)

The Government may request a FACAR from the Contractor in accordance with DI-SESS-81927 per CDRL A003 if it is determined a defect requires corrective action. The FACAR is due 30 working days after it is requested by the Government. The Government has 15 working days from receipt of draft to review and comment. The Contractor has 15 working days from receipt of Government comments to submit revisions

3.1.5 Lot Homogeneity

The term “lot” shall refer to an inspection lot, which is defined as one homogeneous quantity of components from which a representative sample is drawn and inspected to determine conformance of the lot with the requirements specified herein. Homogeneity shall be considered to exist provided the lot has been produced by one manufacturer, in one unchanged process, using the same materials and methods in accordance with the same drawings, same drawing revisions, same specifications, and same specification revisions. Materials shall be from one lot/heat of the same grade from one manufacturer. Changes to the process, specifications, or drawings not affecting safety, performance, interchangeability, or storage, as determined by the Government, shall not be deemed to alter the homogeneity of the lot

3.2 Test and Inspection

The Contractor shall maintain and control processes to inspect and test components as described in this SOW. These processes should cover all phases from the ordering of the material to the Government acceptance of the finished product.

3.2.1 First Article Testing

The Contractor shall submit First Article Test (FAT) samples to the Government if the Contractor has not provided contract deliverables for the same drawing numbers within the last 5 years.

The Contractor shall submit a First Article sample prior to the first delivery of any production hardware. The First Article units shall be fully representative of those proposed for production, and demonstrate the adequacy and suitability of the Contractor's processes and procedures in complying with the requirements set forth by the drawings and specifications

The Contractor shall submit an Inspection Test Plan in accordance with DI-QCIC-81110 per CDRL A004 to the Government for review and approval prior to first article manufacture and delivery. The Inspection Test Plans shall consist of shop travelers, flow charts, and final Quality Assurance (QA) inspection sheets for the Government to ensure Contractor in-process inspections capture all drawing and SOW requirements

Any production by the Contractor before formal acceptance of the First Article sample and First Article Tensile Test Samples (3.2.2) shall be at the Contractor’s cost risk.

3.2.2 Tensile Test Samples

The Contractor shall provide tensile sample bars in accordance with Note 4 of Drawing. 1638AS302 along with their first article nozzle samples and each production lot, fabricated from the manufactured nozzles. The Government will conduct tensile tests using these samples to verify Contractor compliance to Drawing. 1638AS302.

3.2.3 Dimensional Inspection

The Contractor is responsible for performing in-house inspections to ensure each component and dimension conforms 100% to the contract, SOW, and product dimensional requirements. All drawing dimensional requirements apply after plating. The Contractor shall provide copies of in-process dimensional data and/or proof of inspections, such as floor shop travelers or final Quality Assurance (QA) inspections, as requested by the Government.

The Contractor shall submit a Final Dimensional Inspection Report in accordance with DI-NDTI-80809 per CDRL A005 for Nozzle Bodies and Carbon Inserts with each production hardware lot. The final dimensional inspection report shall include a list of all drawing dimensions and tolerances, and their actual measured values.

3.2.4 Product Certification

The Contractor shall submit a Certificates of Compliance in accordance with DI-QCIC-81356 per CDRL A006 to accompany the shipment of each lot, as required in Table 2 below. The certificate shall state compliance of the material with its respective drawing or specification, the approved acceptance test and inspection plans from SOW 3.2.1, and contract/order requirements. The certificate shall, as a minimum, state the company name, contract/order number, drawing or specification number, and date.

The Contractor shall submit a Certificates of Analysis in accordance with DI-MISC-80678 per CDRL A007, showing the material has been sampled and/or tested and found to be within the minimum requirements of the specification/drawing in SOW 3.2.1, and as required in Table 2 below. The certificate shall be forwarded to the Government; one (1) copy to accompany the shipment (in the packing list envelope), and one (1) copy mailed to arrive at time of receipt of the shipment (mark the certificate to the attention of the designated POC above). Each certificate must be traceable to the material lot covered by the certificate.

Both Certificates of Analysis and Compliance shall state, above the signature of a legally authorized representative of the company, the following:

“This certification concerns a matter within the jurisdiction of an agency of the United States and making a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code 1001.”

Table 2: Material Cert Requirements

Test
Requirement
Certificate
CDRL
Document
Location
Compliance – Nozzle Body
1638AS302
Find 1
Compliance
A006
Compliance – Carbon Insert
1638AS302
Find 2
Compliance
A006
Compliance – Weather-Seal
1638AS302
Find 3
Compliance
A006
Material – Sealant
1638AS302
Find 4
Compliance
A006
Leak
1638AS302
Note 3
Analysis
A007
Pressure Test
1638AS302
Note 5
Analysis
A007
Lot Number
1638AS302
Note 5
Compliance
A006
Material
1638AS303
Note 2
Analysis
A007
Cadmium Plate
1638AS303
Note 3
Compliance
A006
Magnetic Particle
1638AS303
Note 7
Analysis
A007
Material
1638AS304
Note 2
Analysis
A007
Material
1638AS305
Note 2
Compliance
A006
Material
1638AS307
Note 2
Compliance
A006

3.3 Quality Control

3.3.1 Quality System and Quality Control Processes

The Contractor shall maintain a quality system in compliance with ISO 9001:2015 standards, or equivalent, for the duration of the contract. The Contractor shall provide the Government a compliance certificate in accordance with DI-MISC-80678 per CDRL A008 within 15 working days of contract award. The Contractor shall submit a new compliance certificate to the Government within 15 working days of any subsequent certification changes.

The Contractor shall maintain quality control processes to ensure products are in compliance with the applicable drawings, specifications, and contract. The Contractor shall maintain documentation to identify, record, and track the disposition of nonconforming material or other discrepancies to material features for the entire duration of this contract.

3.3.2 Process Accreditation

The Contractor or its Suppliers shall be accredited by the National Aerospace and Defense Contractors Accreditation Program (NADCAP) to perform the processes in Table 3. The Contractor shall provide the Government an accreditation certificate in accordance with DI-MISC-80678 per CDRL A008 within 15 working days of contract award. The Contractor shall submit a new accreditation certificate to the Government within 15 working days of any subsequent accreditation changes.

Table 3: NADCAP Processes

Process
Requirement
Dwg
Location
Heat Treatment
1638AS303
Note 2
Magnetic Particle
1638AS303
Note 7
Plating
1638AS303
Note 3

3.3.3 Acceptance of Product

Final acceptance of first article samples and production deliverables will be determined by Government dimensional sample inspection of Nozzle Assemblies in accordance with the sampling plan in Table 4 below, as well as certification verification, at Government destination. First Article, Option Year 1, and Option Year 2 acceptance will also be determined by Government dimensional inspection of individual Nozzle Bodies and Carbon Inserts. The Government shall complete sample testing within 60 working days of receipt of deliverables and appropriate certificates. The Government reserves the right to perform similar inspection and testing of hardware to verify acceptability; this may include testing at other facilities.

Table 4: Acceptance Sample Plan

MIL-STD-1916:

Critical:
100%
Major:
Level III
Minor:
Level II

Features designated as “Majors” and “Criticals” may be subject to high-precision measurement techniques as part of the sampling plan identified in Table 4 above. Threaded features shall be inspected by the Government using gauges selected in accordance with ASME B1.3, System 21, unless another gauge is specified in the respective drawing.

3.3.4 Calibration System

Calibration of measuring and testing equipment shall, as a minimum, adhere to the requirements of either ANSI/NCSL Z540.3 or ISO/IEC 17025. The Contractor shall provide the Government a compliance certificate in accordance with DI-MISC-80678 per CDRL A008 within 15 working days of contract award. The Contractor shall submit a new compliance certificate to the Government within 15 working days of any subsequent certification changes.

3.3.5 Government-Identified Nonconformity Reporting Procedures The Government shall alert the Contractor to any nonconforming deliverables within one working day of identifying the nonconformity. The Contractor shall respond to with their recommended disposition on the deliverables within one working day. The Government reserves the right to deviate from the Contractor’s recommended disposition.

3.4 Preservation

The Contractor shall be responsible for packing, packaging, and marking of deliverables in accordance with ASTM D3951 to prevent any potential damage during transport. The Contractor shall label completed parts packaging to include:

· Component name

· Drawing number and revision

· Contract number

· Manufacturer name and date

· Quantity

3.5 Export Control

The Contractor shall comply with either one or both of the export control options below (3.5.1 and/or 3.5.2) for the duration of the contract. The Contractor shall provide the Government a compliance certificate for one or both options below in accordance with DI-MISC-80678 per CDRL A008 within 15 working days of contract award. The Contractor shall submit a new compliance certificate to the Government within 15 working days of any subsequent certification changes.

3.5.1 International Trafficking in Arms Regulations (ITAR) Compliance The Contractor shall maintain ITAR compliance through registration in accordance with 22 CFR 122 to export Category III and IV munitions components, as defined by 22 CFR 121.

3.5.2 Joint Certification Program (JCP) Registration

The Contractor shall maintain JCP registration and a DD Form 2345 to comply with DoD Directive 5230.25.

3.6 Counterfeit Material

The Contractor shall maintain a counterfeit material prevention program in accordance with SAE AS6174, or comparable, for the duration of the contract. The Contractor shall notify the KO within five working days if material cannot be obtained from an authorized supplier.

4.0 Deliverables

The TPOC and KO for this contract will approve all deliverables as specified. The following Certificates shall include the signature of the Contractor’s representative authorized to make such certification.

CDRL
Spec
Section
Title
A001
DI-MGMT-80555
3.1.3
Program Progress Report
A002
DI-MGMT-81809
3.1.3
Risk Management Status Report
A003
DI-SESS-81927
3.1.4
Failure Analysis and Corrective Action Report (FACAR)
A004
DI-QCIC-81110
3.2.1
Inspection Test Plan
A005
DI-NDTI-80809
3.2.3
Final Dimensional Inspection Report
A006
DI-MISC-81356
3.2.4
Certificate of Compliance
A007
DI-MISC-80678
3.2.4
Certificate of Analysis
A008
DI-MISC-80678
3.3.1 / 3.3.2 / 3.3.4 / 3.5
Qualification Certification

4.1 Hardware Delivery

The Contractor shall notify the KO 60 working days in advance, if the Contractor cannot meet the contract delivery schedule.

The Contractor shall be responsible for coordinating and shipping all the units below to the required destination. Lead times listed below represent the maximum allowable delivery timeframe; early deliveries are permitted.

Item
Year
Document
Rev
Nomenclature
Qty
UOI
Lead [wks]
1
FAT
1638AS302
B
Nozzle Assembly
10
EA
50 ARO
2
FAT
1638AS303
B
Nozzle Body
5
EA
50 ARO
3
FAT
1638AS304
NR
Carbon Insert
5
EA
50 ARO
4
Base
1638AS302
B
Nozzle Assembly
550
EA
50 AFA*
5
Option 1
1638AS302
B
Nozzle Assembly
550
EA
50 ARO
6
Option 1
1638AS303
B
Nozzle Body
5
EA
50 ARO
7
Option 1
1638AS304
NR
Carbon Insert
5
EA
50 ARO
8
Option 2
1638AS302
B
Nozzle Assembly
550
EA
50 ARO
9
Option 2
1638AS303
B
Nozzle Body
5
EA
50 ARO
10
Option 2
1638AS304
NR
Carbon Insert
5
EA
50 ARO

*ARO if FAT is waived

ARO – After receipt of order

AFA – After first article

CLAUSES INCORPORATED BY FULL TEXT

C-202-H001 ADDITIONAL DEFINITIONS–BASIC (NAVSEA) (OCT 2018)

(a) Department means the Department of the Navy.

(b) Commander, Naval Sea Systems Command means the Commander of the Naval Sea Systems Command of the Department of the Navy or his duly appointed successor.

(c) References to The Federal Acquisition Regulation (FAR) All references to the FAR in this contract shall be deemed to also reference the appropriate sections of the Defense FAR Supplement (DFARS), unless clearly indicated otherwise.

(d) National Stock Numbers Whenever the term Federal Item Identification Number and its acronym FIIN or the term Federal Stock Number and its acronym FSN appear in the contract, order or their cited specifications and standards, the terms and acronyms shall be interpreted as National Item Identification Number (NIIN) and National Stock Number (NSN) respectively which shall be defined as follows:

(1) National Item Identification Number (NIIN). The number assigned to each approved Item Identification under the Federal Cataloging Program. It consists of nine numeric characters, the first two of which are the National Codification Bureau (NCB) Code. The remaining positions consist of a seven digit nonsignificant number.

(2) National Stock Number (NSN). The National Stock Number (NSN) for an item of supply consists of the applicable four-position Federal Supply Class (FSC) plus the applicable nine-position NIIN assigned to the item of supply.

(End of text)

C-204-H001 USE OF NAVY SUPPORT CONTRACTORS FOR OFFICIAL CONTRACT FILES (NAVSEA) (OCT 2018)

(a) NAVSEA may use a file room management support contractor, hereinafter referred to as "the support contractor", to manage its file room, in which all official contract files, including the official file supporting this procurement, are retained. These official files may contain information that is considered a trade secret, proprietary, business sensitive or otherwise protected pursuant to law or regulation, hereinafter referred to as “protected information”. File room management services consist of any of the following: secretarial or clerical support; data entry; document reproduction, scanning, imaging, or destruction; operation, management, or maintenance of paper-based or electronic mail rooms, file rooms, or libraries; and supervision in connection with functions listed herein.

(b) The cognizant Contracting Officer will ensure that any NAVSEA contract under which these file room management services are acquired will contain a requirement that:

(1) The support contractor not disclose any information;

(2) Individual employees are to be instructed by the support contractor regarding the sensitivity of the official contract files;

(3) The support contractor performing these services be barred from providing any other supplies and/or services, or competing to do so, to NAVSEA for the period of performance of its contract and for an additional three years thereafter unless otherwise provided by law or regulation; and,

(4) In addition to any other rights the contractor may have, it is a third party beneficiary who has the right of direct action against the support contractor, or any person to whom the support contractor has released or disclosed protected information, for the unauthorized duplication, release, or disclosure of such protected information.

(c) Execution of this contract by the contractor is considered consent to NAVSEA's permitting access to any information, irrespective of restrictive markings or the nature of the information submitted, by its file room management support contractor for the limited purpose of executing its file room support contract responsibilities.

(d) NAVSEA may, without further notice, enter into contracts with other contractors for these services. Contractors should enter into separate non-disclosure agreements with the file room contractor. Contact the Procuring Contracting Officer for contractor specifics. However, any such agreement will not be considered a prerequisite before information submitted is stored in the file room or otherwise encumber the government.

C-209-H002 FIRST ARTICLE (GOVERNMENT TESTING) (NAVSEA) (OCT 2018)

(a) The First Article shall conform in every respect to the requirements of this contract. The First Article shall be manufactured with tools, materials, and methods which are the same as the tools, material and methods which will be used to manufacture the production units. All items delivered under the contract shall be manufactured under the same conditions and quality established by the First Article. Any changes to tools, material, or methods after the first article approval shall be documented by the contractor and approved by the Contracting Officer before they are used. The First Article shall not be delivered for first article approval tests as provided for in the clause of this contract entitled "First Article Approval--Government Testing" (FAR 52.209-4) until after the Contractor has fully tested it, at its expense, to determine compliance with said requirements.

(b) The Contractor shall make a record of all data obtained during such tests in a form similar to the guidance provided in MIL-HDBK-831A.

(c) Pursuant to paragraph (e) of the clause entitled "First Article Approval--Government Testing", the First Article shall not be delivered as part of the production quantity.

C-211-H017 UPDATING SPECIFICATIONS AND STANDARDS (NAVSEA) (DEC 2018)

The contractor may request that this contract be updated to include the current version of the applicable specification or standard if the update does not affect the form, fit or function of any deliverable item or increase the cost/price of the item to the Government. The contractor should submit update requests to the Procuring Contracting Officer with copies to the Administrative Contracting Officer and cognizant program office representative for approval. The contractor shall perform the contract in accordance with the existing specifications and standards until notified of approval/disapproval of its request to update by the Procuring Contracting Officer. Any approved alternate specifications or standards will be incorporated into the contract.

C-211-H018 APPROVAL BY THE GOVERNMENT (NAVSEA) (JAN 2019)

Approval by the Government as required under this contract and applicable specifications shall not relieve the Contractor of its obligation to comply with the specifications and with all other requirements of the contract, nor shall it impose upon the Government any liability it would not have had in the absence of such approval.

C-242-H001 EXPEDITING CONTRACT CLOSEOUT (NAVSEA) (OCT 2018)

(a) As part of the negotiated fixed price or total estimated amount of this contract, both the Government and the Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $1,000 or less at the time of final contract closeout. The term "residual dollar amount" shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party may be considered to the extent permitted by law.

(b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered.

C-246-H002 GOVERNMENT USE OF CONTRACTOR’S INSPECTION EQUIPMENT (NAVSEA) (OCT 2018)

The contractor's gages, measuring, and testing devices shall be made available to the Government when required to determine contractor conformance with contract requirements. If conditions warrant, the contractor’s personnel shall be made available for operation of such devices and for verification of their accuracy and condition.

Section D - Packaging and Marking

D-211-H005 IDENTIFICATION MARKING OF PARTS – ALTERNATE I (NAVSEA) (OCT 2018)

(a) For all parts not subject to the marking requirements in DFARS 252.211-7003 – Item Unique Identification and Valuation, marking shall be accomplished in accordance with the following:

(1) Parts not manufactured to Government specifications shall be marked in accordance with generally accepted commercial practice.

(2) Parts manufactured to Government specifications shall be marked as follows:

(i) Electrical Parts - that is, all parts in electrical equipment and electrical parts when used in equipment which are not electrical in nature (e.g., electric controls and motors in a hydraulic system) - shall be identified and marked in accordance with MIL-STD-1285D(2) dated 22 June 2018, or, where MIL-STD-1285D(2) does not cover such a part, in accordance with MIL-STD-130N(1) dated 16 November 2012. Requirements of MIL-STD-1686C dated 25 October 1995 for Electrostatic Discharge Control shall be addressed.

(ii) Electronic Parts - that is, all parts in electronic equipment and electronic parts when used in equipment which are not electronic in nature (e.g., electronic fuel controls in some engines) - shall be identified and marked in accordance with Requirement 67 of MIL-HDBK-454B dated 15 April 2007 with Notice 1 dated 12 December 2012. Requirements of MIL-STD-1686C for Electrostatic Discharge Control shall be addressed.

(iii) Parts other than electrical or electronic parts (as described above) shall be identified and marked in accordance with MIL-STD-130N(1).

(b) In cases where parts are so small as not to permit identification marking as provided above, such parts shall be appropriately coded so as to permit ready identification.

(End of Text)

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN
INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
0001
Destination
Government
Destination
Government
0002
Destination
Government
Destination
Government
0003
N/A
N/A
N/A
Government
0004
Destination
Government
Destination
Government
0005
Destination
Government
Destination
Government
0006
Destination
Government
Destination
Government
0007
N/A
N/A
N/A
Government
0008
Destination
Government
Destination
Government
0009
Destination
Government
Destination
Government
0010
Destination
Government
Destination
Government
0011
N/A
N/A
N/A
Government

CLAUSES INCORPORATED BY REFERENCE

52.246-2
Inspection Of Supplies--Fixed Price
AUG 1996

E-246-H013 INSPECTION AND ACCEPTANCE OF DATA (NAVSEA) (OCT 2018)

Inspection and acceptance of all data shall be as specified on the attached Contract Data Requirements List(s), DD Form 1423.

E-246-H020 QUALITY MANAGEMENT SYSTEM REQUIREMENTS (NAVSEA) (OCT 2018)

The Contractor shall provide and maintain a quality management system that, as a minimum, adheres to the requirements of ASQ/ANSI/ISO 9001:2015 “Quality Management Systems – Requirements” and supplemental requirements imposed by this contract. The quality management system procedures, planning, and all other documentation and data that comprise the quality management system shall be made available to the Government for review. Existing quality documents that meet the requirements of this contract may continue to be used. The Government may perform any necessary inspections, verifications, and evaluations to ascertain conformance to requirements and the adequacy of the implementing procedures. The Contractor shall flow down such standards, as applicable, to lower-tier subcontractors under instances covered in FAR 52.246-11(b) or at the direction of the Contracting Officer. The Government reserves the right to disapprove the quality management system or portions thereof when it fails to meet the contractual requirements.

E-246-H022 INSPECTION AND TEST RECORDS (NAVSEA) (JAN 2019)

Inspection and test records shall, as a minimum, indicate the nature of the observations, number of observations made, and the number and type of deficiencies found. Data included in inspection and test records shall be complete and accurate, and shall be used for trend analysis and to assess corrective action and effectiveness. The data shall, on request, be identified and made available for on-site review by the Contracting Officer or designated Government representative.

E-246-W001 CERTIFICATE OF ANALYSIS (NAVSEA) (OCT 2018)

(a) A certificate of analysis/test showing that the material has been sampled and/or tested and found to be within the minimum requirements of the specification/drawing/contract shall be submitted to the COR or TPOC. The certificate shall be maintained by the contractor for a minimum of one (l) year; one (1) copy to accompany the shipment (in the packing list envelope) and one (1) copy mailed at time of the shipment (mark the certificate to the attention of: Code 00Q).

(b) Each certificate must be traceable to the material covered by the certificate. The certificate shall state, above the signature of a legally authorized representative of the company the following:

This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code, Section 1001.

(c) Beneath the signature include the typed name of the individual signing this certificate.

(d) Certificate for shipments of bulk chemicals shall state contract number, drawing or specification number, lot number, rail car number if shipped by rail or trailer number if by truck, and the date of shipment.

(e) Any demurrage accrued as a result of detaining commercial carriers because of nonreceipt of the certificate shall be the responsibility of the Contractor.

(f) Failure to provide certification at the time of shipment may result in material being rejected and returned at the contractor's expense.

(g) The certificate shall read as follows:

I certify that on ______ [insert date], the ____ [insert Contractor’s name] furnished the supplies called for by the Order/Contract No._____ via ____ [Carrier] on ________ [identify the bill of lading or shipping document] in accordance with all applicable requirements. I further certify that the supplies have been sampled and/or tested and conform in all respects with the contract requirements, including specifications, drawings, preservation, packaging, packing, marking requirements, and physical item identification (part number), and are in the quantity shown on this or on the attached acceptance document.

Date of Execution: ________________________________ Signature: _______________________________________ Typed Name: ____________________________________ Title: ___________________________________________

E-246-W006 SAMPLING OF RECEIVED MATERIAL – ORDNANCE MATERIAL AND ORDNANCE COMPONENT PARTS (NAVSEA) (MAY 2021)

(a) When NAVSEA, Naval Surface Warfare Center Indian Head Division receipt inspects ordnance material and/or ordnance component parts, under this contract, for rockets, missiles and their related component parts; the sampling plan utilized shall be as outlined in the technical data package or as otherwise specified in other applicable controlling documentation. If the sampling plan is not specified within any applicable controlling documentation, the sampling plan and the sampling size shall be as outlined in the specification checked below:

|X| ASQ Z1.4 (ANSI/ASQ Z1.4 -2003 (R2018):

Critical: 100% Major:

Minor:

|_| ASQ Z1.9 (ANSI/ASQ Z1.9 -2003 (R2018)):

Critical: 100% Major:

Minor:

|X| MIL-STD-1916 (DTD 1 APR 96 with NOTICE 2 DTD 5 JUN 14):

Critical: 100% Major:

Minor:

|_| OTHER: [Insert Applicable Specification] Critical: 100% Major:

Minor:

(b) In all cases the acceptance number of defects will be ZERO (0), the entire lot will be rejected for any defect unless specifically otherwise specified by the inspection type and code.

(c) Notwithstanding the above, NAVSEA, Naval Surface Warfare Center Indian Head Division may, at its discretion, accept a defect on an approved waiver on a case-by-case basis.

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE
0001
350 dys. ADC
20
NAVSEA INDIAN HEAD

EXPLOSIVE SCALE FACILITY

ATTN: CAD TEST BLDG 1576

5021 SAFE HAVEN WAY, BLDG 1104

INDIAN HEAD MD 20640

301/744-4666

N00174

0002
715 dys. ADC
550
(SAME AS PREVIOUS LOCATION)

N00174

0003
350 dys. ADC
1
NAVAL SURFACE WARFARE CENTER INDIAN HEAD

ROBERT HOWELL

4895 MCMAHON RD.

BLDG. 526

INDIAN HEAD MD 20640

3017442972

N00174

0004
715 dys. ADC
550
NAVSEA INDIAN HEAD

EXPLOSIVE SCALE FACILITY

ATTN: CAD TEST BLDG 1576

5021 SAFE HAVEN WAY, BLDG 1104

INDIAN HEAD MD 20640

301/744-4666

N00174

0005
715 dys. ADC
2
(SAME AS PREVIOUS LOCATION)

N00174

0006
715 dys. ADC
2
(SAME AS PREVIOUS LOCATION)

N00174

0007
715 dys. ADC
1
NAVAL SURFACE WARFARE CENTER INDIAN HEAD

ROBERT HOWELL

4895 MCMAHON RD.

BLDG. 526

INDIAN HEAD MD 20640

3017442972

N00174

0008
1080 dys. ADC
550
NAVSEA INDIAN HEAD

EXPLOSIVE SCALE FACILITY

ATTN: CAD TEST BLDG 1576

5021 SAFE HAVEN WAY, BLDG 1104

INDIAN HEAD MD 20640

301/744-4666

N00174

0009
1080 dys. ADC
2
(SAME AS PREVIOUS LOCATION)

N00174

0010
1080 dys. ADC
2
(SAME AS PREVIOUS LOCATION)

N00174

0011
1080 dys. ADC
1
NAVAL SURFACE WARFARE CENTER INDIAN HEAD

ROBERT HOWELL

4895 MCMAHON RD.

BLDG. 526

INDIAN HEAD MD 20640

3017442972

N00174

52.211-17
Delivery of Excess Quantities
SEP 1989
52.242-15
Stop-Work Order
AUG 1989
52.242-17
Government Delay Of Work
APR 1984
52.247-34
F.O.B. Destination
NOV 1991
52.247-58
Loading, Blocking, And Bracing Of Freight Car Shipment
APR 1984

F-247-H001 DELIVERY OF DATA (NAVSEA) (OCT 2018)

All data to be furnished under this contract shall be delivered prepaid to the destination(s) and at the time(s) specified on the Contract Data Requirements List(s), DD Form 1423.

(End of Text)

Section G - Contract Administration Data

252.204-7006
Billing Instructions
OCT 2005

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(a) Definitions. As used in this clause—

“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall—

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items—

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

Invoice 2In1

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

N/A

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial financing, submit a commercial financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table* *To be filled in at time of award

Field Name in WAWF
Data to be entered in WAWF
Pay Official DoDAAC
____
Issue By DoDAAC
____
Admin DoDAAC**
____
Inspect By DoDAAC
____
Ship To Code
____
Ship From Code
____
Mark For Code
____
Service Approver (DoDAAC)
____
Service Acceptor (DoDAAC)
____
Accept at Other DoDAAC
____
LPO DoDAAC
____
DCAA Auditor DoDAAC
____
Other DoDAAC(s)
____

(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert “See Schedule” or “Not applicable.”) (**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.

(Contracting Officer: Insert applicable information or “Not applicable.”)

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of clause)

G-216-H002 ORDERS (NAVSEA) (MAR 2019)

(a) General. Orders for supplies or services specified in Section B of the Schedule may be issued by the Contracting Officer at any time during the effective period of this agreement. Except as otherwise provided in paragraph (d) below, the Contractor agrees to accept and perform orders issued by the Contracting Officer within the scope of this agreement. It is understood and agreed that the Government has no obligation under the terms of this agreement to issue any orders. Except as otherwise provided in any order, the Contractor shall furnish all materials and services necessary to accomplish the work specified in each order issued hereunder; provided, however, that this agreement shall not be used for the furnishing of supplies or services which are covered by any "guaranty" or "warranty" clause(s) of the contract(s) under which the supplies were manufactured. In the event of any inconsistency between any order and this agreement, this agreement shall take precedence. All requirements of this agreement shall be applicable to all orders issued hereunder. Wherever the word "contract" appears in this agreement, it shall be deemed to include within its meaning the word "order", and each order shall be considered a separate binding contract as of its effective date. The Contractor shall segregate the costs incurred in the performance of any order issued hereunder from the costs of all other orders issued under this agreement.

(b) Ordering. Orders and revisions thereto shall be made in writing and be signed by any authorized Contracting Officer for activities cited in paragraph (i). Each order shall:

(1) set forth detailed specifications or requirements for the supplies or services being ordered, (or reference applicable specifications or requirements in Section C of this agreement), and, shall refer to the appropriate item under Section B of this agreement;

(2) set forth quantities being ordered;

(3) set forth preservation, packaging and packing instructions, if any;

(4) set forth delivery or performance dates;

(5)designate the place(s) where inspection and acceptance will be made
by the Government;

(6) set forth either the amount or, in the case of an undefinitized order, the definitization schedule and both the monetary limitation on Government liability for the undefinitized order and the maximum ceiling amount at which the order may be definitized;

(7) set forth appropriation and accounting data for the work being ordered;

(8) set forth any discount offered for prompt payment;

(9) be dated;

(10) be identified by number in accordance with DFARS 204.7004;

(11) set forth the property, if any, to be furnished by the Government and the date(s) such property is to be delivered to the Contractor;

(12) set forth the disbursing office where payment is to be made and other applicable contract administration data;

(13) cite the applicable circumstance or exception and the justification control number. Orders for items not identified in the class justification, or an individual justification, and the basic ordering agreement are unauthorized (applies to BOA orders only);

(14) be issued on an SF 26 or a DD Form 1155; and

(15) set forth any other pertinent information.

(c) Orders. Orders may be issued on a fixed price or cost reimbursable basis at the discretion of the Contracting Officer to the extent permitted by the CLIN structure. Except as otherwise provided in paragraph (e) below, the Contractor shall not begin any work on an order until a firm priced order or an estimated cost and fixed fee order is issued by the Contracting Officer. Upon receipt of a proposed order, the Contractor shall promptly submit to the Contracting Officer a proposal for the work specified in the order. The Contractor agrees that it will submit such cost or pricing data as the Contracting Officer may require. Promptly after receipt of the Contractor's proposal and supporting cost or pricing data, if required, the Contractor and the Contracting Officer shall negotiate and agree upon a price and delivery schedule for the work being ordered. The price and delivery schedule, as agreed upon, shall be set forth in the priced order and the order shall be signed by both the Contracting Officer and the Contractor. Upon receipt of the order, the Contractor shall promptly commence work and shall diligently complete it.

(d) Rejection of Unilateral Orders. The Contractor may reject any unilateral order if the Contractor determines it cannot feasibly perform the order, or if it does not concur with the maximum ceiling amount. However, each unilateral order shall be deemed to have been accepted by the Contractor unless within fifteen (15) days of issuance of the order the Contractor notifies the Contracting Officer in writing of its rejection of the order.

(e) Undefinitized Orders. Whenever the Contracting Officer determines that urgent demands or requirements prevent the issuance of a definitized order, the Contracting Officer may issue an unpriced order. Such order may be unilateral or bilateral and shall establish a limitation on Government liability, a maximum ceiling amount and a schedule for definitization, as described in subparagraph (f)(2) below. Upon request, the Contractor shall submit a maximum ceiling amount proposal before the undefinitized order is issued. The maximum ceiling amount is the maximum price at which the order may be definitized. Except as provided in paragraph (d) above, the Contractor shall commence performance of the order upon receipt. The clause entitled "Contract Definitization" (DFARS 252.2177027) shall be included in any undefinitized order.

(f) Definitization of Undefinitized Orders.

(l) The Contractor agrees that following the issuance of an undefinitized order, it will promptly begin negotiating with the Contracting Officer the price and terms of a definitive order that will include: (A) all clauses required by regulation on the date of the order; (B) all clauses required by law on the date of execution of the definitive order; and, (C) other mutually agreeable clauses, terms and/or conditions. No later than sixty (60) days after the undefinitized order is issued, the Contractor shall submit a cost proposal with sufficient data to support the accuracy and derivation of its price; and, when required by FAR or the Contracting Officer, cost or pricing data. If additional cost information is available prior to the conclusion of negotiations, the Contractor shall provide that information to the Contracting Officer. The amount agreed upon shall be set forth in a bilateral modification to the order. In no event shall the amount exceed the maximum ceiling amount specified in the undefinitized order.

(2) Each undefinitized order shall contain a schedule for definitization which shall include a target date for definitization and dates for submission of a qualifying proposal, beginning of negotiations and, if appropriate, submission of makeorbuy and subcontracting plans and cost or pricing data. Submission of a qualifying proposal in accordance with the definitization schedule is a material element of the order. The schedule shall provide for definitization of the order by the earlier of:

(i) specified target date which is not more than 180 days after the issuance of the undefinitized order. However, that target date may be extended by the Contracting Officer for up to l80 days after the Contractor submits a qualifying proposal as defined in DFARS 2l7.740l; or

(ii) the date on which the amount of funds obligated by the Government under the undefinitized order exceeds fifty percent (50%) of the order's maximum ceiling amount.

(3) If agreement on a definitive order is not reached within the time provided pursuant to subparagraph (f)(2) above, the Contracting Officer may, with the approval of the Head of the Contracting Activity, determine a reasonable amount in accordance with Subpart l5.4 and Part 3l of the FAR, and issue a unilateral order subject to Contractor appeal as provided in the "Disputes" clause (FAR 52.2331). In any event, the Contractor shall proceed with completion of the order, subject to the "Limitation of Government Liability" clause (FAR 52.21624).

(g) Limitation of Government Liability.

(l) Each undefinitized order shall set forth the limitation of Government liability, which shall be the maximum amount that the Government will be obligated to pay the Contractor for performance of the order until the order is definitized. The Contractor is not authorized to make expenditures or incur obligations exceeding the limitation of Government liability set forth in the order.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .