N0017423Q0047
N0017423SIMACQM10019
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to add an Revised Statement od Work and to extend the closing date until 25 May 2023
1. CONTRACT ID CODE PAGE OF PAGES
1 8
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-May-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N0017423Q0047
X 9B. DATED (SEE ITEM 11)
04-Apr-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-May-2023
CODE
NSWC IHD
4801 NORTH JACKSON ROAD
BUILDING 841, ROOM 20
INDIAN HEAD MD 20640
N00174 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
francine.l.keys.civ@us.navy.milEMAIL:301-744-6687TEL:
FRANCINE L KEYS / CONTRACTS
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been added by full text:
REVISED STATEMENT OF WORK
MANUFACTURING OF HARDWARE USING NSWC IHD DRAWINGS
PERFORMANCE WORK STATEMENT
1.0 Scope of Work
The requirements in this document contain the information necessary to manufacture hardware for assembly in fleet-deliverable Aviation Critical Safety Items (ACSIs) at Naval Surface Warfare Center Indian Head Division (NSWC IHD).
2.0 Applicable Documents
M31 - CDRL_A001_Inspection M31 - CDRL_A002_ CoC M31 – CDRL_A003_CoA
8594744 Rev J – Pin, Firing 8594744 Rev J Form 16 8594744 Form 43 8594857 Rev J – Pin, Firing 8594857 Rev J Form 16 8594857 Form 43 8594858 Rev H – Housing, Firing Pin 8594858 Rev H Form 16 8594858 Form 43 8594860 Rev H – Retainer, Cartridge 8594860 Rev H Form 16 8594860 Form 43 8595254 Rev E – Cap 8595254 Rev E Form 16 8595254 Form 43
SAE AMS S 5626 REV E
SAE AMS S 5000 REV A
SAE AMS S 6049 REV B
SAE AMS6349 REV E
SAE AMS6382 REV R
SAE AMS6758 REV B
SAE AMS6415 REV U
SAE AMS6484 REV E
SAE AMS6327 REV L
SAE AMS-QQ-P-416 REV F
SAE AMS H 6875 REV C
MIL-DTL-14857 REV B
MIL-STD-171 REV F
ASME Y14.5M-1994
ASME Y14.5-2009
ASME Y14.100-2004
ASME Y14.100-2013
2.1 General Specifications
American National Standards Institute (ANSI)/American Society for Quality (ASQ) Standards:
ANSI/ASQ Z1.4 Sampling Procedures and Tables for Inspection by Attributes
Code of Federal Regulations (CFR):
22 CFR 121 The United States Munitions List 22 CFR 122 Registration of Manufacturers and Exporters
Department of Defense (DoD) Directives:
5230.25 Withholding of Unclassified Technical Data From Public Disclosure
International Organization for Standardization (ISO)/International Electrotechnical Commission (IEC) Standards:
ISO 9001 Quality Management Systems ISO/IEC 17025 General Requirements for the Competence of Testing and Calibration
Laboratories
2.2 Technical Drawings
Department of Defense Drawings:
8594744 Rev J Pin, Firing 8594857 Rev J Chamber, Initiator 8594858 Rev H Housing, Firing Pin 8594860 Rev H Retainer, Cartridge 8595254 Rev E Cap
2.3 Conflicting Document Requirements
If there are any conflicts between specifications, drawings, or requirements listed herein, the contractor shall notify the Contracting Officer (KO) and the Technical Point of Contact (TPOC), in writing for interpretation, clarification, and resolution.
3.0 Requirements
3.1 General Manufacturing
The Contractor shall fabricate, inspect, test, and deliver components in accordance with the applicable drawings and specifications. Components shall be packaged by part number and ready for use. The Contractor shall provide, design, and fabricate all necessary tooling to manufacture and dimensionally inspect the components, and provide data as detailed herein.
The Prime Contractor shall bear the ultimate responsibility for all deliveries and performance of all requirements under this contract. The Prime Contractor shall monitor and maintain all subcontractor relationships. At the Government’s sole discretion, the Government may apply quality and/or on-time delivery issues stemming from the work of a subcontractor to the Prime Contractor’s quality performance metrics.
3.2 Test and Inspection
The Contractor shall maintain and control processes to inspect and test components as described in this PWS. These processes should cover all phases from the ordering of the material to the Government acceptance of the finished product.
3.2.1 First Article Testing
The Contractor shall submit First Article Test (FAT) samples to the Government if the Contractor has not provided contract deliverables for the same drawing numbers within the last 3 years.
The Contractor shall submit a first article sample of 5EA complete units prior to the first delivery of any production hardware. The first article units shall be fully representative of those proposed for production, and demonstrate the adequacy and suitability of the Contractor's processes and procedures in complying with the requirements set forth by the drawings and specifications.
Any production by the Contractor before formal acceptance of the first article sample shall be at the Contractor’s cost risk.
3.2.2 Dimensional Inspection
The Contractor is responsible for performing in-house inspections to ensure each production component and dimension conforms 100% to the contract, PWS, and product dimensional requirements. The Contractor shall provide copies of in-process dimensional data and/or proof of inspections, such as floor shop travelers or final QA inspections, as requested by the Government.
3.2.2.1 Hydrostatic Testing Requirement
Hydrostatic testing shall be done IAW MIL-DTL-14857 REV B Section 3.2, 4.5.1 &
6.3.1, yielding no damage to the threads or sealing surfaces of 8595254 REV E and 8594857 REV J. Per MIL-DTL-14857, 8595254 REV E and 8594857 REV J shall withstand a hydrostatic pressure of 5500 to 6500 pounds per square inch (psi) for 15 seconds, minimum, without deformation or mechanical failure. This characteristic is considered critical and requires 100% testing across all first article and production quantities.
The Contractor shall submit a Final Dimensional Inspection Report in accordance with DI- NDTI-80809 per CDRL A001 for each deliverable line item. The final dimensional inspection report shall include either a list of all drawing dimensions and tolerances, and their actual measured values, or a marked-up copy of the drawing with actual measured values written in red next to the corresponding dimension
3.2.3 Product Certification
The Contractor shall submit a certificate of compliance in accordance with DI-QCIC-81356 per CDRL A002 to accompany the shipment of each first article and production lot, as required by Table 3. The certificate shall state compliance of the material with its respective drawing or specification, and contract/order requirements. The certificate shall as a minimum state the company name, contract/order number, drawing or specification number, and date.
The Contractor shall submit a certificate of analysis/test in accordance with DI-MISC-82386, per CDRL A003, showing the first article or production material has been sampled and/or tested and found to be within the minimum requirements of the specification/drawing/contract, as required by Table 1. The certificate shall be forwarded to the Government; one (1) copy to accompany the shipment (in the packing list envelope), and one (1) copy mailed to arrive at time of receipt of the shipment (mark the certificate to the attention of the designated POC above). Each certificate must be traceable to the material covered by the certificate. The certificate shall state, above the signature of a legally authorized representative of the company the following:
Both Certificates of Analysis and Compliance shall state, above the signature of a legally authorized representative of the company, the following:
“This certification concerns a matter within the jurisdiction of an agency of the United States and making a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code 1001.”
Test Requirement
Certificate Dwg Location
Material 8594744 REV J Note #2 (M112) Analysis Hardness 8594744 REV J Note #2 (M112) Analysis Heat Treat 8594744 REV J Note #2 (M112) Compliance Plating 8594744 REV J Note #4 (M114) &
SOWCADPLATE
Compliance
Visual 8594744 REV J Note #5 Compliance Material 8594857 REV J Note #2 (M114) Analysis Hardness 8594857 REV J Note #2 (M114) Analysis Heat Treat 8594857 REV J Note #2 (M114) Compliance Hydrostatic (Critical sampling rate.)
8594857 REV J MIL-DTL-14857
REV B Section 3.2,
4.5.1 & 6.3.1
Compliance
Plating 8594857 REV J Note #4 (M115) &
SOWCADPLATE
Compliance
Visual 8594857 REV J Note #5 & #9 (C1) Compliance Material 8594858 REV H Note #2 (M101) Analysis Hardness 8594858 REV H Note #10 Analysis Heat Treat 8594858 REV H Note #10 Compliance Plating 8594858 REV H Note #4 (M102) &
SOWCADPLATE
Compliance
Surface Finish 8594858 REV H Note #5 (C1) Compliance Visual 8594858 REV H Note #6 Compliance Material 8594860 REV H Note #2 (M119) Analysis Hardness 8594860 REV H Note #2 (M119) Analysis Heat Treat 8594860 REV H Note #2 (M119) Compliance Plating 8594860 REV H Note #4 (M115) &
SOWCADPLATE
Compliance
Visual 8594860 REV H Note #5 & Note #10 Compliance Material 8595254 REV E Note #2 (M113) Analysis Hardness 8595254 REV E Note #5 Hydrostatic (Critical sampling rate.)
8595254 REV E MIL-DTL-14857
REV B Section 3.2,
4.5.1 & 6.3.1
Compliance
Heat Treat 8595254 REV E Note #5 Compliance Plating 8595254 REV E Note #4 (M114) &
SOWCADPLATE
Compliance
Table 1: Certification Requirements
3.3 Quality Control
3.3.1 Quality System and Quality Control Processes
The Contractor shall maintain a quality system which adheres, at minimum, to the requirements of ISO 9001:2015 standards.
The Contractor quality management system shall ensure products are in compliance with the applicable drawings, specifications, and contract. The quality management system shall outline processes to identify, record, and disposition nonconforming material or other characteristic discrepancies for the entire duration of this contract. Procedures, planning, and all other relevant documentation and data which comprise the quality management system, if requested, shall be made available to the Government for review.
3.3.2 Calibration of Measuring and Testing Equipment
Measuring and testing equipment used by the contractor shall, at a minimum, adhere to the requirements of ISO/IEC 17025:2017.
3.3.3 Acceptance of Product
Final acceptance of first article samples and/or production deliverables will be determined by Government dimensional inspection and certification verification at Government destination for each deliverable line item. The Government shall complete sample testing within 60 days of receipt of all documentation and deliverables relevant to the relevant line item. Unless otherwise stated, the Government sampling plan shall be in accordance with Table 2. The Government reserves the right to perform additional inspection and testing of hardware to verify acceptability.
This may include testing at other facilities.
ASQ Z1.4 [ANSI/ASQ Z1.4-2003 (R2013) – October 2013]:
Critical: 100% Major: Level II Minor: Level I
Table 2: ACSI Sampling Plan
3.3.4 Government-Identified Nonconformity Reporting Procedures The Government shall alert the Contractor to any nonconforming deliverables within one (1) working day of identifying the nonconformity. The Contractor shall respond with their recommended disposition on the deliverables within one (1) working day.
3.4 Export Control
The Contractor shall comply with either one, or both, of the export control options below.
3.4.1 International Trafficking in Arms Regulations (ITAR) Compliance The Contractor shall maintain ITAR compliance through registration in accordance with 22 CFR 122 to export Category III and IV munitions components, as defined by 22 CFR 121.
3.4.2 Joint Certification Program (JCP) Registration
The Contractor shall maintain JCP registration and a DD Form 2345 to comply with DoD Directive 5230.25.
3.5 Pre-Award Technical Documentation Requirements
First time offerors shall supply documentation outlining core capabilities, manufacturing equipment on hand (inspection equipment included), and quality management system. Examples of acceptable documentation include, but are not limited to capabilities statements, equipment lists, line cards, and quality management system documentation adhering to the minimum requirements of ISO 9001:2015.
3.6 Preservation
The Contractor shall be responsible for packing and packaging of deliverables to prevent any potential damage during transport. The Contractor shall label completed parts packaging to include component name, quantity, contract number, drawing number, revision, and manufacturer name and date. Packaging quantities and methods shall be in accordance with applicable Form 43.
4.0 Deliverables
The Technical Point of Contact and Contracting Officer (KO) for this contract will approve all deliverables as specified. The following Certificates shall include the signature of the Contractor’s representative authorized to make such certification.
CDRL Spec Section Title A001 DI-NDTI-80809 3.2.2 Final Dimensional Inspection Report A002 DI-QCIC-81356 3.2.3 Certificate of Compliance A003 DI-MISC-82386 3.2.3 Certificate of Analysis
4.1 Hardware Delivery
The Contractor shall notify the Contracting Officer 30 days in advance if the Contractor cannot meet the contract delivery schedule. The Contractor shall be responsible for coordinating and shipping all the units below to the required destination.
Item Year Drawing Rev Nomenclature Qty UOI 1 Base 8594744 J Pin, Firing (FAT) 5 EA 2 Base 8594744 J Pin, Firing 132 EA 3 Base 8594857 J Chamber, Initiator (FAT) 5 EA 4 Base 8594857 J Chamber, Initiator 132 EA 5 Base 8594858 H Housing, Firing Pin (FAT) 5 EA 6 Base 8594858 H Housing, Firing Pin 362 EA 7 Base 8594860 H Retainer, Cartridge (FAT) 5 EA 8 Base 8594860 H Retainer, Cartridge 132 EA 9 Base 8595254 E Cap (FAT) 5 EA 10 Base 8595254 E Cap 132 EA
Delivery address provided below:
Naval Surface Warfare Center Indian Head Division ATTN: Luccien Fitzpatrick/Axel Maldonado 4522 McMahon Road Bldg. 116, Suite 100 Indian Head, MD 20640
The following have been deleted:
STATEMENT OF WORK