N0017422Q0061-AMEND 0001.pdf

PDF 447 KB Posted

Attached to
CXM Packout Boxes Federal contract opportunity
Solicitation number
N0017422Q0061
Issued by
Department of the Navy Naval Sea Systems Command

View the file

Other files for this federal contract opportunity

Other files attached to CXM Packout Boxes, newest first.
File Type Posted
N0017422Q0061.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N0017422SIMACQM20028

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

THE PURPOSE OF THIS MODIFICATION IS TO ADD A REVISED STATEMENTOF WORK TO THE PROCUREMENT. CLINS 0003 AND 0004 IS DELETEDACCORD TO THE SOW. THE CLOSING DATE HAS BEEN CHANGE FROM: 09 JUN 2022 TO: 10 AUG 2022

1. CONTRACT ID CODE PAGE OF PAGES

1 14

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 02-Aug-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N0017422Q0061

X 9B. DATED (SEE ITEM 11)

02-Aug-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

02-Aug-2022

CODE

NSWC IHD

4801 NORTH JACKSON ROAD

BUILDING 841, ROOM 20

INDIAN HEAD MD 20640

N00174 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

francine.keys@navy.milEMAIL:TEL:

FRANCINE L KEYS / CONTRACTS

N0017422Q0061

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 09-Jun-2022 05:00 PM to 10-Aug-2022 05:00 PM.

The solicitation issue date has changed from 25-May-2022 to 02-Aug-2022.

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0003

The pricing detail quantity has decreased by 20,000.00 from 20,000.00 to 0.00.

The option status has changed from Option to No Status.

CLIN 0004

The pricing detail quantity has decreased by 20,000.00 from 20,000.00 to 0.00.

The option status has changed from Option to No Status.

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been added by full text:

REVISED STATEMENT OF WORK

MANUFACTURING OF Explosive Packaging USING Ardec DRAWINGS

PERFORMANCE WORK STATEMENT

1.0 Scope of Work

The requirements in this document contain the information necessary to manufacture fiberboard boxes for packaging of Coated Explosive Material at Naval Surface Warfare Center Indian Head Division (NSWC IHD).

2.0 Applicable Documents

2.1 General Specifications

Department Of Defense Test Method Standard:

MIL-STD-1916 DOD Preferred Methods For Acceptance Of Product

American Society for Testing and Materials Standards:

ASTM D3951 Standard Practice for Commercial Packaging

Code of Federal Regulations (CFR):

49 CFR § 172.407

Label specifications

International Organization for Standardization (ISO)/International Electrotechnical Commission (IEC) Standards:

ISO 9001 Quality Management Systems

Society of Automotive Engineers (SAE) Standards:

SAE AS6174 Counterfeit Material; Assuring Acquisition of Authentic and Conforming Material

2.2 Technical Drawings

Department of Defense Drawings:

7548645 Rev AU BOX, FIBREBOARD, PACKING, REUASBLE, COLAPASABLE, FOR HIGH

EXPLOSIVES

2.3 Conflicting Document Requirements

If there are any conflicts between specifications, drawings, or requirements listed herein, the contractor shall notify the Contracting Officer (KO) and the Technical Point of Contact (TPOC), in writing for interpretation, clarification, and resolution.

3.0 Requirements

3.1 General

The Contractor shall fabricate, inspect, test, and deliver components in accordance with the applicable drawings and specifications. Components shall be packaged by part number and ready for use. The Contractor shall provide, design, and fabricate all necessary tooling to manufacture and dimensionally inspect the components, and provide data as detailed herein.

3.1.1 Marking Instructions

The contractor shall manufacture packaging component 1 as detailed in DWG. 7548645. Contractor shall be responsible for POP certification and marking IAW note M14, Year of manufacture shall be included in POP marking. Contractor shall print Class 1, Division 1, Group “D” labels IAW 49 CFR § 172.407 on Fiberboard Box Top on center of adjacent sides (2) to the panel marked “cover” in DWG. 7548645.

3.1.2 Workmanship.

Workmanship shall be defined as detection of any criteria that would be cause for rejection according to the “INSPECTION CRETIREA FOR REUSE OF BOXES” Section, “S” notes of DWG. 7548645. Any delamination of fiberboard layers shall be cause for rejection.

3.1.3 Subcontractor and Supplier Performance

The Prime Contractor shall bear the ultimate responsibility for all deliveries and performance of all requirements under this contract. The Prime Contractor shall monitor and maintain all subcontractor relationships. At the Government’s sole discretion, the Government may apply quality and/or on-time delivery issues stemming from the work of a subcontractor to the Prime Contractor’s quality performance metrics.

3.2 Test and Inspection

The Contractor shall maintain and control processes to inspect and test components as described in this PWS. These processes should cover all phases from the ordering of the material to the Government acceptance of the finished product.

3.2.1 First Article Testing

The Contractor shall submit First Article Test (FAT) samples to the Government if the Contractor has not provided contract deliverables for the same drawing numbers within the last 3 years.

The Contractor shall submit an Inspection Test Plan in accordance with DI-QCIC-81110 per CDRL A001 to the Government for review and approval prior to first article manufacture and delivery. The Contractor shall submit a first article sample of 10EA complete units prior to the first delivery of any production hardware. The first article units shall be fully representative of those proposed for production, and demonstrate the adequacy and suitability of the Contractor's processes and procedures in complying with the requirements set forth by the drawings and specifications.

Any production by the Contractor before formal acceptance of the First Article sample shall be at the Contractor’s cost risk.

3.2.2 Performance Oriented Packaging Report

The contractor shall test fiberboard boxes in accordance with UN 4G/Y33/S. Contractor shall provide report in accordance with DI-PACK-81059 per CDRL A002.

3.2.3 Product Certification

The Contractor shall submit a Certificate of Compliance in accordance with DI-QCIC-81356 per CDRL A003 to accompany the shipment of each first article and production lot, as required by Table 1. The certificate shall state compliance of the material with its respective drawing or specification, and contract/order requirements. The certificate shall as a minimum state the company name, contract/order number, drawing or specification number, and date.

Certificates of Compliance shall state, above the signature of a legally authorized representative of the company, the following:

“This certification concerns a matter within the jurisdiction of an agency of the United States and making a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code 1001.”

Test Requirement

Certificate Dwg Location

Fiberboard Material 7548645-1 Packaging Components -1

Compliance

Adhesive Material 7548645-4 Packaging Components -1, Note 2

Compliance

Joint Failure 7548645 Note 2 Compliance Table 1: Certification Requirements

3.3 Quality Control

3.3.1 Quality System and Quality Control Processes

The Contractor shall maintain a quality system which adheres, at minimum, to the requirements of ISO 9001:2015 standards.

The Contractor quality management system shall ensure products are in compliance with the applicable drawings, specifications, and contract. The quality management system shall outline processes to identify, record, and disposition nonconforming material or other characteristic discrepancies for the entire duration of this contract.

Procedures, planning, and all other relevant documentation and data which comprise the quality management system, if requested, shall be made available to the Government for review.

3.3.2 Acceptance of Product

Final acceptance of first article samples and production deliverables will be determined by Government label and certification verification at Government destination for each deliverable line item. The Government shall complete sample testing within 15 days of receipt of all documentation and deliverables relevant to the relevant line item.

Unless otherwise stated, the Government sampling plan shall be in accordance with Table 2. The Government reserves the right to perform additional inspection and testing of hardware to verify acceptability. This may include testing at other facilities.

MIL-STD-1916 – 1 April 1996 Critical: 100% Major: Level IV Minor: Level II

Table 2: Sampling Plan

Features designated as “Majors” and “Criticals” may be subject to high-precision measurement techniques as part of the sampling plan identified above. The Government shall inspect sampled product in accordance with Table 3.

Requirement/Inspection Inspection Level

Method

CoC that indicates that the fiberboard box complies with all requirements that pertain to the box as described in drawing 7548645

Major Visual

Box Dimensions, Interior Minor

Measurement Tool, Tape measure or equivalent

Box Dimensions, Exterior Minor Measurement Tool, Tape measure or equivalent

Absence of Metal stitching/staples Minor Visual Box is capable of collapsing along scored lines to a completely flat position.

Minor Visual

Length of box flaps at body and cover joints are approximately equal to the depth of the box

Minor Visual

Drawing Number, UN Marking, and 1.1D Placards are printed on box in proper place according to drawing and SW

Minor Visual

Box Tops and Bottoms fit together properly Minor Fit Check Workmanship Minor Visual

Table 3: Inspection Criteria

3.3.3 Government-Identified Nonconformity Reporting Procedures The Government shall alert the Contractor to any nonconforming deliverables within one (1) working day of identifying the nonconformity. The Contractor shall respond with their recommended disposition on the deliverables within one (1) working day.

3.4 Counterfeit Material

The Contractor shall maintain a counterfeit material prevention program in accordance with SAE AS6174, or comparable. The Contractor shall notify the Contracting Officer (KO) if material cannot be obtained from an authorized supplier.

3.5 Preservation

The Contractor shall be responsible for packing, packaging, and marking of deliverables in accordance with ASTM D3951 to prevent any potential damage during transport.

The Contractor shall label completed parts packaging to include component name, quantity, contract number, drawing number, revision, manufacturer name, and date.

4.0 Deliverables

The Technical Point of Contact and Contracting Officer (KO) for this contract will approve all deliverables as specified. The following Certificates shall include the signature of the Contractor’s representative authorized to make such certification.

CDRL Spec Section Title A001 DI-QCIC-81110 7.2.1 Inspection Test Plan A002 DI-NDTI-80809 3.2.2 POP Report A003 DI-NDTI-80809 3.2.3 Final Dimensional Inspection Report A004 DI-QCIC-81356 3.2.4 Certificate of Compliance

4.1 Hardware Delivery

The Contractor shall notify the Contracting Officer 30 days in advance if the Contractor cannot meet the contract delivery schedule.

The Contractor shall be responsible for coordinating and shipping all the units below to the required destination.

Item Year Drawing Rev Nomenclature Qty UOI Lead [wks]

1 FAT 7548645 AU BOX, FIBREBOARD,

PACKING, REUASBLE,

COLAPASABLE, FOR HIGH

EXPLOSIVES

10 Sets 4 ARO

2 Base 7548645 AU BOX, FIBREBOARD, PACKING, REUASBLE, COLAPASABLE, FOR HIGH

EXPLOSIVES

21,0

Sets 8 AFA*

*ARO if FAT is waived

Delivery address provided below:

Naval Surface Warfare Center Indian Head Division 4522 McMahon Road Bldg. 116, Suite 100 Indian Head, MD 2064

The following have been modified:

STATEMENT OF WORK

MANUFACTURING OF EXPLOSIVE PACKAGING USING ARDEC DRAWINGS

PERFORMANCE WORK STATEMENT

5.0 Scope of Work

The requirements in this document contain the information necessary to manufacture fiberboard boxes for packaging of Coated Explosive Material at Naval Surface Warfare Center Indian Head Division (NSWC IHD).

6.0 Applicable Documents

6.1 General Specifications

Department Of Defense Test Method Standard:

MIL-STD-1916 DOD Preferred Methods For Acceptance Of Product

American Society for Testing and Materials Standards:

ASTM D3951 Standard Practice for Commercial Packaging

Code of Federal Regulations (CFR):

49 CFR § 172.407

Label specifications

International Organization for Standardization (ISO)/International Electrotechnical Commission (IEC) Standards:

ISO 9001 Quality Management Systems

Society of Automotive Engineers (SAE) Standards:

SAE AS6174 Counterfeit Material; Assuring Acquisition of Authentic and

Conforming Material

6.2 Technical Drawings

Department of Defense Drawings:

7548645 Rev AU BOX, FIBREBOARD, PACKING, REUASBLE, COLAPASABLE, FOR HIGH EXPLOSIVES

6.3 Conflicting Document Requirements

If there are any conflicts between specifications, drawings, or requirements listed herein, the contractor shall notify the Contracting Officer (KO) and the Technical Point of Contact (TPOC), in writing for interpretation, clarification, and resolution.

7.0 Requirements

7.1 General

The Contractor shall fabricate, inspect, test, and deliver components in accordance with the applicable drawings and specifications. Components shall be packaged by part number and ready for use. The Contractor shall provide, design, and fabricate all necessary tooling to manufacture and dimensionally inspect the components, and provide data as detailed herein.

7.1.1 Marking Instructions

The contractor shall manufacture packaging component 1 as detailed in DWG. 7548645.

Contractor shall be responsible for POP certification and marking IAW note M14, Year of manufacture shall be included in POP marking. Contractor shall print Class 1, Division 1, Group “D” labels IAW 49 CFR § 172.407 on Fiberboard Box Top on center of adjacent sides (2) to the panel marked “cover” in DWG. 7548645.

7.1.2 Workmanship.

Workmanship shall be defined as detection of any criteria that would be cause for rejection according to the “INSPECTION CRETIREA FOR REUSE OF BOXES” Section, “S” notes of DWG. 7548645. Any delamination of fiberboard layers shall be cause for rejection.

7.1.3 Subcontractor and Supplier Performance

The Prime Contractor shall bear the ultimate responsibility for all deliveries and performance of all requirements under this contract. The Prime Contractor shall monitor and maintain all subcontractor relationships. At the Government’s sole discretion, the Government may apply quality and/or on-time delivery issues stemming from the work of a subcontractor to the Prime Contractor’s quality performance metrics.

7.2 Test and Inspection

The Contractor shall maintain and control processes to inspect and test components as described in this PWS. These processes should cover all phases from the ordering of the material to the Government acceptance of the finished product.

7.2.1 First Article Testing

The Contractor shall submit First Article Test (FAT) samples to the Government if the Contractor has not provided contract deliverables for the same drawing numbers within the last 3 years.

The Contractor shall submit an Inspection Test Plan in accordance with DI-QCIC-81110 per CDRL A001 to the Government for review and approval prior to first article manufacture and delivery. The Contractor shall submit a first article sample of 10EA complete units prior to the first delivery of any production hardware. The first article units shall be fully representative of those proposed for production, and demonstrate the adequacy and suitability of the Contractor's processes and procedures in complying with the requirements set forth by the drawings and specifications.

Any production by the Contractor before formal acceptance of the First Article sample shall be at the Contractor’s cost risk.

7.2.2 Performance Oriented Packaging Report

The contractor shall test fiberboard boxes in accordance with UN 4G/Y33/S. Contractor shall provide report in accordance with DI-PACK-81059 per CDRL A002.

7.2.3 Product Certification

The Contractor shall submit a Certificate of Compliance in accordance with DI-QCIC-81356 per CDRL A003 to accompany the shipment of each first article and production lot, as required by Table 1. The certificate shall state compliance of the material with its respective drawing or specification, and contract/order requirements. The certificate shall as a minimum state the company name, contract/order number, drawing or specification number, and date.

Certificates of Compliance shall state, above the signature of a legally authorized representative of the company, the following:

“This certification concerns a matter within the jurisdiction of an agency of the United States and making a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code 1001.”

Test Requirement

Certificate Dwg Location

Fiberboard Material

7548645-1 Packaging Components -1

Compliance

Adhesive Material

7548645-4 Packaging Components -1, Note 2

Compliance

Joint Failure 7548645 Note 2 Compliance Table 1: Certification Requirements

7.3 Quality Control

7.3.1 Quality System and Quality Control Processes

The Contractor shall maintain a quality system which adheres, at minimum, to the requirements of ISO 9001:2015 standards.

The Contractor quality management system shall ensure products are in compliance with the applicable drawings, specifications, and contract. The quality management system shall outline processes to identify, record, and disposition nonconforming material or other characteristic discrepancies for the entire duration of this contract. Procedures, planning, and all other relevant documentation and data which comprise the quality management system, if requested, shall be made available to the Government for review.

7.3.2 Acceptance of Product

Final acceptance of first article samples and production deliverables will be determined by Government label and certification verification at Government destination for each deliverable line item. The Government shall complete sample testing within 15 days of receipt of all documentation and deliverables relevant to the relevant line item. Unless otherwise stated, the Government sampling plan shall be in accordance with Table 2. The Government reserves the right to perform additional inspection and testing of hardware to verify acceptability. This may include testing at other facilities.

MIL-STD-1916 – 1 April 1996 Critical: 100% Major: Level IV Minor: Level II

Table 2: Sampling Plan

Features designated as “Majors” and “Criticals” may be subject to high-precision measurement techniques as part of the sampling plan identified above. The Government shall inspect sampled product in accordance with Table 3.

Requirement/Inspection Inspection

Level Method

CoC that indicates that the fiberboard box complies with all requirements that pertain to the box as described in drawing 7548645

Major Visual

Box Dimensions, Interior Minor

Measurement Tool, Tape measure or equivalent

Box Dimensions, Exterior Minor Measurement Tool, Tape measure or equivalent

Absence of Metal stitching/staples Minor Visual Box is capable of collapsing along scored lines to a completely flat position.

Minor Visual

Length of box flaps at body and cover joints are approximately equal to the depth of the box

Minor Visual

Drawing Number, UN Marking, and 1.1D Placards are printed on box in proper place according to drawing and

SW

Minor Visual

Box Tops and Bottoms fit together properly

Minor Fit Check

Workmanship Minor Visual Table 3: Inspection Criteria

7.3.3 Government-Identified Nonconformity Reporting Procedures

The Government shall alert the Contractor to any nonconforming deliverables within one (1) working day of identifying the nonconformity. The Contractor shall respond with their recommended disposition on the deliverables within one (1) working day.

7.4 Counterfeit Material

The Contractor shall maintain a counterfeit material prevention program in accordance with SAE AS6174, or comparable. The Contractor shall notify the Contracting Officer (KO) if material cannot be obtained from an authorized supplier.

7.5 Preservation

The Contractor shall be responsible for packing, packaging, and marking of deliverables in accordance with ASTM D3951 to prevent any potential damage during transport.

The Contractor shall label completed parts packaging to include component name, quantity, contract number, drawing number, revision, manufacturer name, and date.

8.0 Deliverables

The Technical Point of Contact and Contracting Officer (KO) for this contract will approve all deliverables as specified. The following Certificates shall include the signature of the Contractor’s representative authorized to make such certification.

CDRL Spec Section Title A001 DI-QCIC-81110 7.2.1 Inspection Test Plan A002 DI-NDTI-80809 3.2.2 POP Report A003 DI-NDTI-80809 3.2.3 Final Dimensional Inspection Report A004 DI-QCIC-81356 3.2.4 Certificate of Compliance

8.1 Hardware Delivery

The Contractor shall notify the Contracting Officer 30 days in advance if the Contractor cannot meet the contract delivery schedule.

The Contractor shall be responsible for coordinating and shipping all the units below to the required destination.

Item Year Drawing Rev Nomenclature Qty UOI Lead [wks]

1 FAT 7548645 AU BOX, FIBREBOARD,

PACKING, REUASBLE,

COLAPASABLE, FOR

HIGH EXPLOSIVES

10 Sets 4 ARO

2 Base 7548645 AU BOX, FIBREBOARD, PACKING, REUASBLE, 21, Sets 8 AFA*

COLAPASABLE, FOR

HIGH EXPLOSIVES

3 Option 1 7548645 AU BOX, FIBREBOARD, PACKING, REUASBLE, COLAPASABLE, FOR

HIGH EXPLOSIVES

20, Sets 8 Weeks

AFA

4 Option 2 7548645 AU BOX, FIBREBOARD, PACKING, REUASBLE, COLAPASABLE, FOR

HIGH EXPLOSIVES

20, Sets 8 Weeks

AFA

*ARO if FAT is waived

Delivery address provided below:

Naval Surface Warfare Center Indian Head Division 4522 McMahon Road Bldg. 116, Suite 100 Indian Head, MD 2064

SECTION F - DELIVERIES OR PERFORMANCE

The following Delivery Schedule item for CLIN 0001 has been changed from:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

05-AUG-2022 10 NAVSEA INDIAN HEAD

SHIPPING AND RECEIVING 4522

MCMAHON ROAD, SUI

DG 116

INDIAN HEAD MD 20640-5125

301-744-4221 FOB: Destination

N00174

To:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

09-SEP-2022 10 NAVSEA INDIAN HEAD

SHIPPING AND RECEIVING 4522

MCMAHON ROAD, SUI

DG 116

INDIAN HEAD MD 20640-5125

301-744-4221

The following Delivery Schedule item for CLIN 0002 has been changed from:

CAGE

22-SEP-2022 21,000 NAVSEA INDIAN HEAD

SHIPPING AND RECEIVING 4522

MCMAHON ROAD, SUI

DG 116

INDIAN HEAD MD 20640-5125

301-744-4221

CAGE

31-OCT-2022 21,000 NAVSEA INDIAN HEAD

SHIPPING AND RECEIVING 4522

MCMAHON ROAD, SUI

DG 116

INDIAN HEAD MD 20640-5125

301-744-4221

The following Delivery Schedule item for CLIN 0003 has been changed from:

CAGE

04-AUG-2023 20,000 NAVSEA INDIAN HEAD

SHIPPING AND RECEIVING 4522

MCMAHON ROAD, SUI

DG 116

INDIAN HEAD MD 20640-5125

301-744-4221

CAGE

04-AUG-2023 0 NAVSEA INDIAN HEAD

SHIPPING AND RECEIVING 4522

MCMAHON ROAD, SUI

DG 116

INDIAN HEAD MD 20640-5125

301-744-4221

The following Delivery Schedule item for CLIN 0004 has been changed from:

CAGE

21-SEP-2023 20,000 NAVSEA INDIAN HEAD

SHIPPING AND RECEIVING 4522

MCMAHON ROAD, SUI

DG 116

INDIAN HEAD MD 20640-5125

301-744-4221

CAGE

21-SEP-2023 0 NAVSEA INDIAN HEAD

SHIPPING AND RECEIVING 4522

MCMAHON ROAD, SUI

DG 116

INDIAN HEAD MD 20640-5125

301-744-4221

(End of Summary of Changes)

File details come from the government source that posted it. Updated .