SOW.doc
DOC document 32 KB Posted
- Attached to
- Plating of Motor Tubes CKU-5 W/O 9004
- Solicitation number
- N0017420Q0019
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ - N0017420Q0019.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (STRIP AND REPLATE)
1. Unless otherwise specified, parts are to be cadmium plated to the requirements of AMS-QQ-P-416, Revision E, or anodized to MIL-A-8625 Revision F Amendment 1.
2. Cleaning: Prior to stripping and re-plating, all surfaces shall be cleaned, regardless of Configuration contour. Cleaning must be sufficient to completely remove all traces of foreign materials and substances from the base metal; however, cleaning shall not be injurious to the base metal. Examples of the materials and substances include, but are no limited to:
Cadmium/chromate plating
DC 33, DC-111, DC-11 Grease
FS-1292 Grease
Varnish
DC 1200 Primer
RTV-732. 1200, 159, 162, 167
Loctite - Grade 242
Ethyl Cellulose Tape
Elbe Solvent
404 Double Faced Tape
Pliobond 20
Eccobond 45/Catalyst 15
VC-3 #205 Thread Sealant
Epon 828/EC1622 Accelerator
Glyptal
Scotchweld Adhesive Cement, 1357, Primer Coating Epoxy
Scotchweld 1838 A/B
Red Primer Coat 1200
Scotch Electrical Tape 54, 56
Acrylic Lacquer
Rust and Corrosion
3. Coverage: There shall be no rack marks, air bubbles, pin holes nor any other bare areas, except those specifically denoted as such by the contract/purchase order/or bankcard order.
All internal and external threads shall have at least a presence of plating (verifiable by visual examination) and a maximum coverage thickness of .00040 inches. All surfaces not controlled for plating thickness by the contract/purchase order/or bankcard order shall have presence of plating (verifiable by visual inspection) and a maximum coverage thickness of .00080 inches. These requirements shall be met regardless of part configuration, contour, part size, and any in-process controls needed to perform the plating. (This includes all internal and external surfaces.)
4. Adhesion: Plating shall show no indication of separation from the base metal when tested in accordance with ASTM D3359-95A, and shall meet adhesion requirements of the governing plating specification.
5. Embrittlement Relief: All cadmium-plated parts, regardless of hardness, must be baked, after plating, but prior to chromate finish, as specified below. Any parts exceeding R/C 36 (160 ksi) in hardness, shall also be subject to the following baking requirements between stripping and replating.
Time between Plating and Baking: shall not exceed 4 hours Temperature for Baking: 375 F +/- 25 F
Time for Baking: 23 hours minimum
6. Corrosion and Hydrogen Embrittlement Tests: Although the vendor is not required to perform this test, the government reserves the right to perform the test at any time, at government expense.
Rev A 11/13/2018
File details come from the government source that posted it. Updated .