Solicitation_N00174-19-R-0144.pdf
PDF 595 KB Posted
- Attached to
- Storage Cabinets and Associated Components Federal contract opportunity
- Solicitation number
- N0017419R0144
About this file
Solicitation N00174-19-R-0144
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation_N00174-19-R-0144-0001.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
N0017419R0144 20-Jun-2019
b. TELEPHONE NUMBER
301-744-6633
8. OFFER DUE DATE/LOCAL TIME
02:00 PM 22 Jul 2019
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
N001749. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
PLESHETTE T BROWN
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
NSWC INDIAN HEAD EOD TECHNOLOGY DIVISION
ATTN: PLESHETTE BROWN
4072 NORTH JACKSON ROAD
INDIAN HEAD MD 20640
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE N00174 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
ARMAG CORPORATION
CARY WILLIAMS
300 ARMAG AVE
BARDSTOWN KY 40004-2041
TEL: 812-320-3780 FAX:
301-744-6670FAX:
TEL: 301-744-6633 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
NAICS:
337215
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
x 100
X
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF95
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
N0017419R0144
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 Each Heavy-Duty Storage Cabinets 36"x24"x72"
FFP
See Item Description and Pricing Matrix below.
FOB: Destination
PSC CD: 7125
NET AMT
0002 Each Heavy-Duty Storage Cabinets 36"x24"x84"
FFP
See Item Description and Pricing Matrix below.
0003 Each Counter-Height Cabinets Gray 36"x20"x42"
FFP
See Item Description and Pricing Matrix below.
0004 Each Workbenches w/ Bolt-Adjust. legs 30"x60"
FFP
See Item Description and Pricing Matrix below.
0005 Each Workbenches w/ Bolt-Adjust. legs 30"x72"
FFP
See Item Description and Pricing Matrix below.
0006 Each Steel Drawers for 60" or 72" workbench
FFP
with hasp for above workbenches Gray fits both a 60" and 72" workbench (mounting hardware included). See Item Description and Pricing Matrix below.
0007 Each Steel Shelves 60" workbench
FFP
60⠀ shelf for a 60†workbench (mounting hardware included) See Item Description and Pricing Matrix below.
0008 Each Steel Shelves 72" workbench
FFP
72" shelf for a 72" workbench (mounting hardware included).
See Item Description and Pricing Matrix below.
0009 Each Economy Pedestal Workbenches
FFP
has two 4-Drawer Pedestals.
See Item Description and Pricing Matrix below.
0010 Each Economy Pedestal Workbenches
FFP
has 4-Drawer Pedestal and Door Pedestal.
See Item Description and Pricing Matrix below.
0011 Each Economy Pedestal Workbenches
FFP
has two Door Pedestals.
See Item Description and Pricing Matrix below.
0012 Each Chrome-Plated Shelving Units 60"x24"x75"
FFP
See Item Description and Pricing Matrix below.
0013 Each Chrome-Plated Shelving 72"x24"x74 5/8"
FFP
See Item Description and Pricing Matrix below.
0014 Each Assembled book case 34 1/2"x13 1/2"x 78"
FFP
60"x30"x29". See Item Description and Pricing Matrix below.
0015 Each Desk-Gray Finish w/Gray Base
FFP
60"x30"x29". See Item Description and Pricing Matrix below.
PRICING MATRIX
CLIN 0001
Heavy-Duty Storage Cabinets 36”x24”x72” These cabinets are strong enough to hold small dies. They feature 14-ga. reinforced shelves and bottom; 16-ga. top;
12-ga. sides; 18-ga. back; and 18-ga. doors with 18-ga. reinforcing channels. Cabinets have one center fixed shelf plus another three shelves that adjust up and down on 4” centers. Welded and shipped assembled. Gray enamel finish.
CLIN 0001 Year 1 Year 2 Year 3 Year 4 Year 5
1-5 units
6-10 units
11-20 units
21-39 units
40-59 units
60-80 units
80-1,000+ units
CLIN 0002
Heavy-Duty Storage Cabinets 36”x24”x84” These cabinets are strong enough to hold small dies. They feature 14-ga. reinforced shelves and bottom; 16-ga. top;
12-ga. sides; 18-ga. back; and 18-ga. doors with 18-ga. reinforcing channels. Cabinets have one center fixed shelf plus another three shelves that adjust up and down on 4” centers. Welded and shipped assembled. Gray enamel finish.
CLIN 0003 Year 1 Year 2 Year 3 Year 4 Year 5 1-5 units
6-10 units
11-20 units
21-39 units
40-59 units
CLIN 0003
Counter-Height Cabinets Gray 36”x20”x42” Extra-heavy-duty cabinets are super-strong, 12-ga. steel with 14-ga. shelves. Shelves are adjustable on 2” centers. 3-point latch has a 5/8” dia. hole for padlock shackle.
CLIN 0003 Year 1 Year 2 Year 3 Year 4 Year 5
6-10 units
11-20 units
21-39 units
CLIN 0004
Workbenches with Bolt-Adjustable legs 30”x60” These workbenches have 16-ga. legs. Workbench height adjusts from 29” to 33” in 1” increments (leg bolts included). They have a laminated hard maple 1-3/4”H X 30” D X 60”W or 72”W nonconductive, impact resistant top. Legs and workbench shipped unassembled (hardware is included).
CLIN 0004 Year 1 Year 2 Year 3 Year 4 Year 5
6-10 units
11-20 units
21-39 units
40-59 units
80-200+ units
CLIN 0005
Workbenches with Bolt-Adjustable legs 30”x72” These workbenches have 16-ga. legs. Workbench height adjusts from 29” to 33” in 1” increments (leg bolts included). They have a laminated hard maple 1-3/4”H X 30” D X 60”W or 72”W nonconductive, impact resistant top. Legs and workbench shipped unassembled (hardware is included).
CLIN 0005 Year 1 Year 2 Year 3 Year 4 Year 5
6-10 units
11-20 units
21-39 units
CLIN 0006
Steel Drawers with hasp for above workbenches Gray fits both a 60” and 72” workbench (mounting hardware included)
CLIN 0006 Year 1 Year 2 Year 3 Year 4 Year 5
1-5 units
6-10 units
11-20 units
21-39 units
40-59 units
CLIN 0007
Steel Shelves for above workbenches Gray 60” shelf for a 60” workbench (mounting hardware included)
CLIN 0007 Year 1 Year 2 Year 3 Year 4 Year 5
6-10 units
11-20 units
21-39 units
40-59 units
CLIN 0008
Steel Shelves for above workbenches Gray 72” shelf for a 72” workbench (mounting hardware included)
CLIN 0008 Year 1 Year 2 Year 3 Year 4 Year 5
6-10 units
11-20 units
21-39 units
CLIN 0009
Economy Pedestal Workbenches has two 4-Drawer Pedestals These workbenches are offered in three different pedestal combinations with a 1 ¾” thick laminated hard maple top that is non-conductive, impact resistant, and NSF approved. All have gray enamel finish. There are two types of pedestals: door-style and drawer-style. Both have flush fronts and recessed handles. The sides of the pedestals are 22-ga. steel with a 16-ga. top and bottom; base and back are 15- ga. steel. Size is 15 ¾” Wd. X 20” Dp. X 27” H.
There is one knockout per drawer of the drawer pedestal and one knockout in the door of the door pedestal for adding the optional cylinder lock. The door pedestal has a 20-ga. steel shelf, and can open right or left by just turning the pedestal over- no need to remove the door. The drawer pedestal has four 15 ¾” Wd. X 20” Dp. X 6 ¾” Ht. drawers.
Two 5” high bases are included to give you proper workbench height. If desired, you can remove the bases to lower the workbench to desk height.
CLIN 0009 Year 1 Year 2 Year 3 Year 4 Year 5
6-10 units
11-20 units
21-39 units
40-59 units
60-80 units
CLIN 0010
Economy Pedestal Workbenches has 4-Drawer Pedestal and Door Pedestal These workbenches are offered in three different pedestal combinations with a 1 ¾” thick laminated hard maple top that is non-conductive, impact resistant, and NSF approved. All have gray enamel finish. There are two types of pedestals: door-style and drawer-style. Both have flush fronts and recessed handles. The sides of the pedestals are 22-ga. steel with a 16-ga. top and bottom; base and back are 15- ga. steel. Size is 15 ¾” Wd. X 20” Dp. X 27” H.
There is one knockout per drawer of the drawer pedestal and one knockout in the door of the door pedestal for adding the optional cylinder lock. The door pedestal has a 20-ga. steel shelf, and can open right or left by just turning the pedestal over- no need to remove the door. The drawer pedestal has four 15 ¾” Wd. X 20” Dp. X 6 ¾” Ht. drawers.
Two 5” high bases are included to give you proper workbench height. If desired, you can remove the bases to lower the workbench to desk height.
CLIN 0010 Year 1 Year 2 Year 3 Year 4 Year 5 1-5 units
6-10 units
11-20 units
21-39 units
40-59 units
60-80 units
CLIN 0011
Economy Pedestal Workbenches has two Door Pedestals These workbenches are offered in three different pedestal combinations with a 1 ¾” thick laminated hard maple top that is non-conductive, impact resistant, and NSF approved. All have gray enamel finish. There are two types of pedestals: door-style and drawer-style. Both have flush fronts and recessed handles. The sides of the pedestals are 22-ga. steel with a 16-ga. top and bottom; base and back are 15- ga. steel. Size is 15 ¾” Wd. X 20” Dp. X 27” H.
There is one knockout per drawer of the drawer pedestal and one knockout in the door of the door pedestal for adding the optional cylinder lock. The door pedestal has a 20-ga. steel shelf, and can open right or left by just turning the pedestal over- no need to remove the door. The drawer pedestal has four 15 ¾” Wd. X 20” Dp. X 6 ¾” Ht. drawers.
Two 5” high bases are included to give you proper workbench height. If desired, you can remove the bases to lower the workbench to desk height.
CLIN 0011 Year 1 Year 2 Year 3 Year 4 Year 5
6-10 units
CLIN 0012
Chrome-Plated Shelving Units 60”x24”x75” Widely used in electronics manufacturing and assembly, as well as in fixture, display, and clean rooms. Shelving comes furnished with 1” OD, 16-ga. steel uprights that have circular grooves every 1” for easy shelf adjustment. The uprights also feature bottom bolt levelers that help compensate for uneven floors. Shelving also comes furnished with four shelves (including top and bottom) that are made of 10-ga. wire with ¼” OD frame wire. A truss-like, ½” wire around the shelves adds support. Shelves attach to the uprights without the use of special tools, a tapered opening on each shelf corner slides over tapered split sleeves (included), which together snap onto the uprights to form a positive lock.
CLIN 0012 Year 1 Year 2 Year 3 Year 4 Year 5
6-10 units
11-20 units
21-39 units
40-59 units
60-80 units
CLIN 0013
Chrome-Plated Shelving Units 72”x24”x74 5/8” Widely used in electronics manufacturing and assembly, as well as in fixture, display, and clean rooms. Shelving comes furnished with 1” OD, 16-ga. steel uprights that have circular grooves every 1” for easy shelf adjustment. The uprights also feature bottom bolt levelers that help compensate for uneven floors. Shelving also comes furnished with four shelves (including top and bottom) that are made of 10-ga. wire with ¼” OD frame wire. A truss-like, ½” wire around the shelves adds support. Shelves attach to the uprights without the use of special tools, a tapered opening on each shelf corner slides over tapered split sleeves (included), which together snap onto the uprights to form a positive lock.
CLIN 0013 Year 1 Year 2 Year 3 Year 4 Year 5
6-10 units
11-20 units
21-39 units
40-59 units
60-80 units
CLIN 0014
Assembled book case Gray 34 ½”x 13 ½” x78” These bookcases are constructed of 22-gauge steel, shelves adjust on 2” centers.
CLIN 0014 Year 1 Year 2 Year 3 Year 4 Year 5
6-10 units
60-80 units
CLIN 0015
Desk-Gray Finish w/Gray Base- 60” x 30” x 29” The tops measure 1 1/8th inch. Legs are 1” sq., tubular steel with a chrome-plated finish. The drawers open and close smoothly and quietly on ball-bearing rollers, except for the center drawer which has nylon glides. Locking the center drawer locks all drawers (lock and keys included). The file drawers are full suspension to accommodate both letter and legal-size files. Each drawer has an ABS plastic drawer pull with shiny chrome finish. Shipped assembled, except for legs and handles. Includes one (1) center drawer (27 ¾”X17”X1 5/8”), four (4) box drawers (12½“X22 ½”X5 1/8”), and one (1) file drawer (12¼”X23”X10 ¾”).
CLIN 0015 Year 1 Year 2 Year 3 Year 4 Year 5
6-10 units
11-20 units
21-39 units
Section C - Descriptions and Specifications
CLAUSES INCORPORATED BY FULL TEXT
C-202-H001 ADDITIONAL DEFINITIONS–BASIC (NAVSEA) (OCT 2018)
(a) Department - means the Department of the Navy.
(b) Commander, Naval Sea Systems Command - means the Commander of the Naval Sea Systems Command of the Department of the Navy or his duly appointed successor.
(c) References to The Federal Acquisition Regulation (FAR) - All references to the FAR in this contract shall be deemed to also reference the appropriate sections of the Defense FAR Supplement (DFARS), unless clearly indicated otherwise.
(d) National Stock Numbers - Whenever the term Federal Item Identification Number and its acronym FIIN or the term Federal Stock Number and its acronym FSN appear in the contract, order or their cited specifications and standards, the terms and acronyms shall be interpreted as National Item Identification Number (NIIN) and National Stock Number (NSN) respectively which shall be defined as follows:
(1) National Item Identification Number (NIIN). The number assigned to each approved Item Identification under the Federal Cataloging Program. It consists of nine numeric characters, the first two of which are the National Codification Bureau (NCB) Code. The remaining positions consist of a seven digit non-significant number.
(2) National Stock Number (NSN). The National Stock Number (NSN) for an item of supply consists of the applicable four-position Federal Supply Class (FSC) plus the applicable nine-position NIIN assigned to the item of supply.
(End of text)
C-204-H001 USE OF NAVY SUPPORT CONTRACTORS FOR OFFICIAL CONTRACT FILES (NAVSEA)
(OCT 2018)
(a) NAVSEA may use a file room management support contractor, hereinafter referred to as "the support contractor", to manage its file room, in which all official contract files, including the official file supporting this procurement, are retained. These official files may contain information that is considered a trade secret, proprietary, business sensitive or otherwise protected pursuant to law or regulation, hereinafter referred to as “protected information”. File room management services consist of any of the following: secretarial or clerical support; data entry; document reproduction, scanning, imaging, or destruction; operation, management, or maintenance of paper-based or electronic mail rooms, file rooms, or libraries; and supervision in connection with functions listed herein.
(b) The cognizant Contracting Officer will ensure that any NAVSEA contract under which these file room management services are acquired will contain a requirement that:
(1) The support contractor not disclose any information;
(2) Individual employees are to be instructed by the support contractor regarding the sensitivity of the official contract files;
(3) The support contractor performing these services be barred from providing any other supplies and/or services, or competing to do so, to NAVSEA for the period of performance of its contract and for an additional three years thereafter unless otherwise provided by law or regulation; and,
(4) In addition to any other rights the contractor may have, it is a third party beneficiary who has the right of direct action against the support contractor, or any person to whom the support contractor has released or disclosed protected information, for the unauthorized duplication, release, or disclosure of such protected information.
(c) Execution of this contract by the contractor is considered consent to NAVSEA's permitting access to any information, irrespective of restrictive markings or the nature of the information submitted, by its file room management support contractor for the limited purpose of executing its file room support contract responsibilities.
(d) NAVSEA may, without further notice, enter into contracts with other contractors for these services. Contractors should enter into separate non-disclosure agreements with the file room contractor. Contact the Procuring Contracting Officer for contractor specifics. However, any such agreement will not be considered a prerequisite before information submitted is stored in the file room or otherwise encumber the government.
C-215-H002 CONTRACTOR PROPOSAL (NAVSEA) (OCT 2018)
(a) Performance of this contract by the Contractor shall be conducted and performed in accordance with the detailed obligations to which the Contractor committed itself in Proposal dated in response to Solicitation No.
(b) The technical volume(s) of the Contractor's proposal is(are) hereby incorporated by reference and made subject to the "Order of Precedence" (FAR 52.215-8) clause of this contract. Under the "Order of Precedence" clause, the technical volume(s) of the Contractor's proposal referenced herein is (are) hereby designated as item (f) of the clause, following "the specifications" in the order of precedence.
C-242-H001 EXPEDITING CONTRACT CLOSEOUT (NAVSEA) (OCT 2018)
(a) As part of the negotiated fixed price or total estimated amount of this contract, both the Government and the Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $1,000 or less at the time of final contract closeout. The term "residual dollar amount" shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party may be considered to the extent permitted by law.
(b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered.
C-246-H001 EXTENSION OF COMMERCIAL WARRANTY (NAVSEA) (OCT 2018)
The Contractor shall extend to the Government the full coverage of any standard commercial warranty normally offered in a similar commercial sale, provided that such warranty is available at no additional cost to the Government. The Contractor shall provide a copy of the standard commercial warranty with the item. The standard commercial warranty period shall begin upon the final acceptance of the applicable material or software.
Acceptance of the standard commercial warranty does not waive the Government's rights under the "Inspection" clause, nor does it limit the Government's rights with regard to other terms and conditions of the contract. In the event of a conflict, the terms and conditions of the contract shall take precedence over the standard commercial warranty.
Section D - Packaging and Marking
D-246-H002 WARRANTY NOTIFICATION FOR ITEM(S) 0001-0015—BASIC (NAVSEA) (OCT 2018)
The Contractor shall apply a permanent warranty notification stamping or marking on each warranted deliverable end item and its container. The notification shall be placed in close proximity to other required stamping or markings so as to be easily readable by personnel. The warranty notification shall read:
THIS ITEM WARRANTED UNDER CONTRACT ________ TO CONFORM TO DESIGN,
MANUFACTURING, AND PERFORMANCE REQUIREMENTS AND BE FREE FROM DEFECTS IN
MATERIAL AND WORKMANSHIP FOR ________________ FROM DATE OF ACCEPTANCE. IF
ITEM IS DEFECTIVE NOTIFY _______________________ AND PCO.
(End of Text)
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 0005 Destination Government Destination Government 0006 Destination Government Destination Government 0007 Destination Government Destination Government 0008 Destination Government Destination Government 0009 Destination Government Destination Government 0010 Destination Government Destination Government 0011 Destination Government Destination Government 0012 Destination Government Destination Government 0013 Destination Government Destination Government 0014 Destination Government Destination Government 0015 Destination Government Destination Government
CLAUSES INCORPORATED BY REFERENCE
52.246-2 Inspection Of Supplies--Fixed Price AUG 1996 52.246-16 Responsibility For Supplies APR 1984
E-246-H016 INSPECTION AND ACCEPTANCE OF F.O.B. DESTINATION DELIVERIES (NAVSEA) (OCT 2018)
Item(s) 0001-0015 - Inspection and acceptance shall be made at destination by a representative of the Government.
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 45 dys. ADC 1,000 ARMAG CORPORATION
CARY WILLIAMS
300 ARMAG AVE
BARDSTOWN KY 40004-2041
812-320-3780
N00174
0002 45 dys. ADC 80 (SAME AS PREVIOUS LOCATION)
0003 45 dys. ADC 80 (SAME AS PREVIOUS LOCATION)
0004 45 dys. ADC 200 (SAME AS PREVIOUS LOCATION)
0005 45 dys. ADC 80 (SAME AS PREVIOUS LOCATION)
0006 45 dys. ADC 200 (SAME AS PREVIOUS LOCATION)
0007 45 dys. ADC 200 (SAME AS PREVIOUS LOCATION)
0008 45 dys. ADC 80 (SAME AS PREVIOUS LOCATION)
0009 45 dys. ADC 80 (SAME AS PREVIOUS LOCATION)
0010 45 dys. ADC 80 (SAME AS PREVIOUS LOCATION)
0011 45 dys. ADC 80 (SAME AS PREVIOUS LOCATION)
0012 45 dys. ADC 80 (SAME AS PREVIOUS LOCATION)
0013 45 dys. ADC 80 (SAME AS PREVIOUS LOCATION)
0014 45 dys. ADC 20 (SAME AS PREVIOUS LOCATION)
0015 45 dys. ADC 80 (SAME AS PREVIOUS LOCATION)
52.211-17 Delivery of Excess Quantities SEP 1989 52.242-15 Stop-Work Order AUG 1989 52.242-17 Government Delay Of Work APR 1984 52.247-34 F.O.B. Destination NOV 1991
Section G - Contract Administration Data
252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
DEC 2018
252.204-7006 BILLING INSTRUCTIONS (OCT 2005)
When submitting a request for payment, the Contractor shall--
(a) Identify the contract line item(s) on the payment request that reasonably reflect contract work performance; and
(b) Separately identify a payment amount for each contract line item included in the payment request.
(End of clause)
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)
(a) Definitions. As used in this clause—
“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.
“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.
“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232- 7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall—
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items—
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
Combo
(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
(Contracting Officer: Insert either “Invoice 2in1” or the applicable invoice and receiving report document type(s) for fixed price line items for services.)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial item financing, submit a commercial item financing request.
(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC TBD
Issue By DoDAAC N00174
Admin DoDAAC** TBD
Inspect By DoDAAC N00174
Ship To Code N00174
Ship From Code ____
Mark For Code ____
Service Approver (DoDAAC) N00174
Service Acceptor (DoDAAC) N00174
Accept at Other DoDAAC ____
LPO DoDAAC ____
DCAA Auditor DoDAAC ____
Other DoDAAC(s) ____
(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert “See Schedule” or “Not applicable.”)
(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.
TBD
(Contracting Officer: Insert applicable information or “Not applicable.”)
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
252.242-7005 CONTRACTOR BUSINESS SYSTEMS (FEB 2012)
(a) This clause only applies to covered contracts that are subject to the Cost Accounting Standards under 41 U.S.C.
chapter 15, as implemented in regulations found at 48 CFR 9903.201-1 (see the FAR Appendix).
(b) Definitions. As used in this clause--
Acceptable contractor business systems means contractor business systems thatcomply with the terms and conditions of the applicable business system clauses listed in the definition of ``contractor business systems'' in this clause.
Contractor business systems means--
(1) Accounting system, if this contract includes the clause at 252.242-7006, Accounting System Administration;
(2) Earned value management system, if this contract includes the clause at 252.234-7002, Earned Value Management System;
(3) Estimating system, if this contract includes the clause at 252.215-7002, Cost Estimating System Requirements;
(4) Material management and accounting system, if this contract includes the clause at 252.242-7004, Material Management and Accounting System;
(5) Property management system, if this contract includes the clause at 252.245-7003, Contractor Property Management System Administration; and
(6) Purchasing system, if this contract includes the clause at 252.244-7001, Contractor Purchasing System Administration.
Significant deficiency, in the case of a contractor business system, means a shortcoming in the system that materially affects the ability of officials of the Department of Defense to rely upon information produced by the system that is needed for management purposes.
(c) General. The Contractor shall establish and maintain acceptable business systems in accordance with the terms and conditions of this contract.
(d) Significant deficiencies.
(1) The Contractor shall respond, in writing, within 30 days to an initial determination that there are one or more significant deficiencies in one or more of the Contractor's business systems.
(2) The Contracting Officer will evaluate the Contractor's response and notify the Contractor, in writing, of the final determination as to whether the Contractor's business system contains significant deficiencies. If the Contracting Officer determines that the Contractor's business system contains significant deficiencies, the final determination will include a notice to withhold payments.
(e) Withholding payments.
(1) If the Contracting Officer issues the final determination with a notice to withhold payments for significant deficiencies in a contractor business system required under this contract, the Contracting Officer will withhold five percent of amounts due from progress payments and performance-based payments, and direct the Contractor, in writing, to withhold five percent from its billings on interim cost vouchers on cost-reimbursement, labor-hour, and time-and-materials contractsuntil the Contracting Officer has determined that the Contractor has corrected all significant deficiencies as directed by the Contracting Officer's final determination. The Contractor shall, within 45 days of receipt of the notice, either correct the deficiencies or submit an acceptable corrective action plan showing milestones and actions to eliminate the deficiencies.
(2) If the Contractor submits an acceptable corrective action plan within 45 days of receipt of a notice of the Contracting Officer's intent to withhold payments, and the Contracting Officer, in consultation with the auditor or functional specialist, determines that the Contractor is effectively implementing such plan, the Contracting Officer will reduce withholding directly related to the significant deficiencies covered under the corrective action plan, to two percent from progress payments and performance-based payments, and direct the Contractor, in writing, to reduce the percentage withheld on interim cost vouchers to two percent until the Contracting Officer determines the Contractor has corrected all significant deficiencies as directed by the Contracting Officer's final determination.
However, if at any time, the Contracting Officer determines that the Contractor has failed to follow the accepted corrective action plan, the Contracting Officer will increase withholding from progress payments and performance-based payments, and direct the Contractor, in writing, to increase the percentage withheld on interim cost vouchers to the percentage initially withheld, until the Contracting Officer determines that the Contractor has corrected all significant deficiencies as directed by the Contracting Officer's final determination.
(3) Payment withhold percentage limits.
(i) The total percentage of payments withheld on amounts due under each progress payment, performance-based payment, or interim cost voucher, on this contract shall not exceed--
(A) Five percent for one or more significant deficiencies in any single contractor business system; and
(B) Ten percent for significant deficiencies in multiple contractor business systems.
(ii) If this contract contains pre-existing withholds, and the application of any subsequent payment withholds will cause withholding under this clause to exceed the payment withhold percentage limits in paragraph (e)(3)(i) of this clause, the Contracting Officer will reduce the payment withhold percentage in the final determination to an amount that will not exceed the payment withhold percentage limits.
(4) For the purpose of this clause, payment means any of the following payments authorized under this contract:
(i) Interim payments under--
(A) Cost-reimbursement contracts;
(B) Incentive type contracts;
(C) Time-and-materials contracts;
(D) Labor-hour contracts.
(ii) Progress payments.
(iii) Performance-based payments.
(5) Payment withholding shall not apply to payments on fixed-price line items where performance is complete and the items were accepted by the Government.
(6) The withholding of any amount or subsequent payment to the Contractor shall not be construed as a waiver of any rights or remedies the Government has under this contract.
(7) Notwithstanding the provisions of any clause in this contract providing for interim, partial, or other payment withholding on any basis, the Contracting Officer may withhold payment in accordance with the provisions of this clause.
(8) The payment withholding authorized in this clause is not subject to the interest-penalty provisions of the Prompt Payment Act.
(f) Correction of deficiencies.
(1) The Contractor shall notify the Contracting Officer, in writing, when the Contractor has corrected the business system's deficiencies.
(2) Once the Contractor has notified the Contracting Officer that all deficiencies have been corrected, the Contracting Officer will take one of the following actions:
(i) If the Contracting Officer determines that the Contractor has corrected all significant deficiencies as directed by the Contracting Officer's final determination, the Contracting Officer will, as appropriate, discontinue the withholding of progress payments and performance-based payments, and direct the Contractor, in writing, to discontinue the payment withholding from billings on interim cost vouchers under this contract associated with the Contracting Officer's final determination, and authorize the Contractor to bill for any monies previously withheld that are not also being withheld due to other significant deficiencies. Any payment withholding under this contract due to other significant deficiencies, will remain in effect until the Contracting Officer determines that those significant deficiencies are corrected.
(ii) If the Contracting Officer determines that the Contractor still has significant deficiencies, the Contracting Officer will continue the withholding of progress payments and performance-based payments, and the Contractor shall continue withholding amounts from its billings on interim cost vouchers in accordance with paragraph (e) of this clause, and not bill for any monies previously withheld.
(iii) If the Contracting Officer determines, based on the evidence submitted by the Contractor, that there is a reasonable expectation that the corrective actions have been implemented and are expected to correct the significant deficiencies, the Contracting Officer will discontinue withholding payments, and release any payments previously withheld directly related to the significant deficiencies identified in the Contractor notification, and direct the Contractor, in writing, to discontinue the payment withholding from billings on interim cost vouchers associated with the Contracting Officer's final determination, and authorize the Contractor to bill for any monies previously withheld.
(iv) If, within 90 days of receipt of the Contractor notification that the Contractor has corrected the significant deficiencies, the Contracting Officer has not made a determination in accordance with paragraphs (f)(2)(i), (ii), or
(iii) of this clause, the Contracting Officer will reduce withholding directly related to the significant deficiencies identified in the Contractor notification by at least 50 percent of the amount being withheld from progress payments and performance-based payments, and direct the Contractor, in writing, to reduce the payment withholding from billings on interim cost vouchers directly related to the significant deficiencies identified in the Contractor notification by a specified percentage that is at least 50 percent, but not authorize the Contractor to bill for any monies previously withheld until the Contracting Officer makes a determination in accordance with paragraphs (f)(2)(i), (ii), or (iii) of this clause.
(v) At any time after the Contracting Officer reduces or discontinues the withholding of progress payments and performance-based payments, or directs the Contractor to reduce or discontinue the payment withholding from billings oninterim cost vouchers under this contract, if the Contracting Officer determines that the Contractor has failed to correct the significant deficiencies identified in the Contractor's notification, the Contracting Officer will reinstate or increase withholding from progress payments and performance-based payments, and direct the Contractor, in writing, to reinstate or increase the percentage withheld on interim cost vouchers to the percentage initially withheld, until the Contracting Officer determines that the Contractor has corrected all significant deficiencies as directed by the Contracting Officer's final determination.
G-216-H002 ORDERS (NAVSEA) (MAR 2019)
(a) General. Orders for supplies or services specified in Section B of the Schedule may be issued by the Contracting Officer at any time during the effective period of this agreement. Except as otherwise provided in paragraph (d) below, the Contractor agrees to accept and perform orders issued by the Contracting Officer within the scope of this agreement.
It is understood and agreed that the Government has no obligation under the terms of this agreement to issue any orders.
Except as otherwise provided in any order, the Contractor shall furnish all materials and services necessary to accomplish the work specified in each order issued hereunder; provided, however, that this agreement shall not be used for the furnishing of supplies or services which are covered by any "guaranty" or "warranty" clause(s) of the contract(s) under which the supplies were manufactured. In the event of any inconsistency between any order and this agreement, this agreement shall take precedence. All requirements of this agreement shall be applicable to all orders issued hereunder. Wherever the word "contract" appears in this agreement, it shall be deemed to include within its meaning the word "order", and each order shall be considered a separate binding contract as of its effective date. The Contractor shall segregate the costs incurred in the performance of any order issued hereunder from the costs of all other orders issued under this agreement.
(b) Ordering. Orders and revisions thereto shall be made in writing and be signed by any authorized Contracting Officer for activities cited in paragraph (i). Each order shall:
(1) set forth detailed specifications or requirements for the supplies or services being ordered, (or reference applicable specifications or requirements in Section C of this agreement), and, shall refer to the appropriate item under Section B of this agreement;
(2) set forth quantities being ordered;
(3) set forth preservation, packaging and packing instructions, if any;
(4) set forth delivery or performance dates;
(5) designate the place(s) where inspection and acceptance will be made by the Government;
(6) set forth either the amount or, in the case of an undefinitized order, the definitization schedule and both the monetary limitation on Government liability for the undefinitized order and the maximum ceiling amount at which the order may be definitized;
(7) set forth appropriation and accounting data for the work being ordered;
(8) set forth any discount offered for prompt payment;
(9) be dated;
(10) be identified by number in accordance with DFARS 204.7004;
(11) set forth the property, if any, to be furnished by the Government and the date(s) such property is to be delivered to the Contractor;
(12) set forth the disbursing office where payment is to be made and other applicable contract administration data;
(13) cite the applicable circumstance or exception and the justification control number. Orders for items not identified in the class justification, or an individual justification, and the basic ordering agreement are unauthorized (applies to BOA orders only);
(14) be issued on an SF 26 or a DD Form 1155; and
(15) set forth any other pertinent information.
(c) Orders. Orders may be issued on a fixed price or cost reimbursable basis at the discretion of the Contracting Officer to the extent permitted by the CLIN structure. Except as otherwise provided in paragraph (e) below, the Contractor shall not begin any work on an order until a firm priced order or an estimated cost and fixed fee order is issued by the Contracting Officer. Upon receipt of a proposed order, the Contractor shall promptly submit to the Contracting Officer a proposal for the work specified in the order. The Contractor agrees that it will submit such cost or pricing data as the Contracting Officer may require. Promptly after receipt of the Contractor's proposal and supporting cost or pricing data, if required, the Contractor and the Contracting Officer shall negotiate and agree upon a price and delivery schedule for the work being ordered. The price and delivery schedule, as agreed upon, shall be set forth in the priced order and the order shall be signed by both the Contracting Officer and the Contractor. Upon receipt of the order, the Contractor shall promptly commence work and shall diligently complete it.
(d) Rejection of Unilateral Orders. The Contractor may reject any unilateral order if the Contractor determines it cannot feasibly perform the order, or if it does not concur with the maximum ceiling amount. However, each unilateral order shall be deemed to have been accepted by the Contractor unless within fifteen (15) days of issuance of the order the Contractor notifies the Contracting Officer in writing of its rejection of the order.
(e) Undefinitized Orders. Whenever the Contracting Officer determines that urgent demands or requirements prevent the issuance of a definitized order, the Contracting Officer may issue an unpriced order. Such order may be unilateral or bilateral and shall establish a limitation on Government liability, a maximum ceiling amount and a schedule for definitization, as described in subparagraph (f)(2) below. Upon request, the Contractor shall submit a maximum ceiling amount proposal before the undefinitized order is issued. The maximum ceiling amount is the maximum price at which the order may be definitized. Except as provided in paragraph (d) above, the Contractor shall commence performance of the order upon receipt. The clause entitled "Contract Definitization" (DFARS 252.217-7027) shall be included in any undefinitized order.
(f) Definitization of Undefinitized Orders.
(l) The Contractor agrees that following the issuance of an undefinitized order, it will promptly begin negotiating with the Contracting Officer the price and terms of a definitive order that will include: (A) all clauses required by regulation on the date of the order; (B) all clauses required by law on the date of execution of the definitive order; and,
(C) other mutually agreeable clauses, terms and/or conditions. No later than sixty (60) days after the undefinitized order is issued, the Contractor shall submit a cost proposal with sufficient data to support the accuracy and derivation of its price; and, when required by FAR or the Contracting Officer, cost or pricing data. If additional cost information is available prior to the conclusion of negotiations, the Contractor shall provide that information to the Contracting Officer.
The amount agreed upon shall be set forth in a bilateral modification to the order. In no event shall the amount exceed the maximum ceiling amount specified in the undefinitized order.
(2) Each undefinitized order shall contain a schedule for definitization which shall include a target date for definitization and dates for submission of a qualifying proposal, beginning of negotiations and, if appropriate, submission of make-or-buy and subcontracting plans and cost or pricing data. Submission of a qualifying proposal in accordance with the definitization schedule is a material element of the order. The schedule shall provide for definitization of the order by the earlier of:
(i) specified target date which is not more than 180 days after the issuance of the undefinitized order.
However, that target date may be extended by the Contracting Officer for up to l80 days after the Contractor submits a qualifying proposal as defined in DFARS 2l7.740l; or
(ii) the date on which the amount of funds obligated by the Government under the undefinitized order exceeds fifty percent (50%) of the order's maximum ceiling amount.
(3) If agreement on a definitive order is not reached within the time provided pursuant to subparagraph (f)(2) above, the Contracting Officer may, with the approval of the Head of the Contracting Activity, determine a reasonable amount in accordance with Subpart l5.4 and Part 3l of the FAR, and issue a unilateral order subject to Contractor appeal as provided in the "Disputes" clause (FAR 52.233-1). In any event, the Contractor shall proceed with completion of the order, subject to the "Limitation of Government Liability" clause (FAR 52.216-24).
(g) Limitation of Government Liability.
(l) Each undefinitized order shall set forth the limitation of Government liability, which shall be the maximum amount that the Government will be obligated to pay the Contractor for performance of the order until the order is definitized. The Contractor is not authorized to make expenditures or incur obligations exceeding the limitation of Government liability set forth in the order. If such expenditures are made, or if such obligations are incurred, those expenditures and obligations will be at the Contractor's sole risk and expense. Further, the limitation of liability shall be the maximum Government liability if the order is terminated. The clause at FAR 52.216-24 shall be included in any undefinitized order.
(2) Except for undefinitized orders for Foreign Military Sales; purchases at or below the simplified acquisition threshold; special access programs; and Congressionally-mandated long lead procurements; and except as otherwise provided in subparagraph (g)(3) below, the limitation of Government liability shall not exceed fifty percent (50%) of the maximum ceiling amount of an undefinitized order. In the case of orders within these excepted categories, however, the procedures set forth herein shall be followed to the maximum extent practical.
(3) If the Contractor submits a qualifying proposal, as defined in DFARS 217.7401, to definitize an order before the Government obligated fifty percent (50%) of the maximum ceiling amount, the Contracting Officer may increase the limitation of Government liability up to no more than seventy-five percent (75%) of the maximum ceiling amount or up to seventy-five percent (75%) of the amount proposed by the Contractor, whichever is…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.