Attachment_E_-_SOW_for_Moser_Chiller_Rev8.docx
DOCX document 32 KB Posted
- Attached to
- Chiller Maintenance Federal contract opportunity
- Solicitation number
- N0017418R0037
About this file
Statement of Work. If you are unable to open the statement of work, please email Jodi.fields@navy.mil to get a copy. Thanks
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATE: 6/8/2018 (REV 8)
1. INTRODUCTION
This Statement of Work (SOW) outlines the requirements, deliverables and schedule associated with the procurement, services, installation and ongoing preventive maintenance of the refrigeration system in support of the Moser Plant production to the Naval Surface Warfare Center, Indian Head Explosive Ordinance Disposal Technology Division (NSWC IHEODTD), Indian Head MD 20640-5035.
Building 670 houses the Moser nitration plant refrigeration system (York chiller skid number/serial number: 81-201-058, refrigerant type R-22) that is designed to meet the cooling requirement of the nitration process for the production of the Otto Fuel II. The nitration process produces a large amount of heat that could detonate the material in the reactor at Bldg. 1543. The refrigeration unit is in place to control and maintain the temperature of the nitration process in order to prevent a catastrophic event.
2. SCOPE
The scope of this contract includes the following.
2.1. EQUIPMENT PROCURMENT
New Compressor Motor (100 HP) The contractor shall supply a new motor that is compatible with the existing York Refrigeration Unit (York chiller skid number/serial number: 81-201-058, refrigerant type R-22). See reference 1.1 for additional information.
Spare Compressor Refurbishment The contractor shall refurbish the existing spare compressor and supply all necessary components and parts to render the York RS84A-22 model compressor operational. See reference 1.1 for additional information. The spare compressor is currently stored at Bldg. 670.
The contractors may request a site visit to determine what equipment and/or parts will be needed to complete the job. It is expected that materials such as but not limited to bearings, valves, springs, piston rings, shaft seals, oil filters, oil, gaskets, sheaves, and other consumables will be required to complete the scope of work, and render the chiller operational. Contact the contract specialist representative for details. The contractor shall include an allotment for adding refrigerant to completely charge the existing system.
Compressor Rebuild Kit (for currently installed compressor) The contractor shall provide a rebuild kit for the existing compressor that is currently installed. The rebuild kit will contain the parts required to rebuild the existing, installed compressor. The contractor shall package parts for long term storage and include spare belts for the compressor/motor.
2.1.1. DELIVERY OF EQUIPMENT
Upon the completion of the spare compressor refurbishment, the contractor shall deliver the rebuilt compressor as well as the new motor including any supporting peripheral equipment to Bldg. 670 for storage pending installation. The installation of the rebuilt compressor and new motor will be scheduled with plant operations.
The contractor shall deliver the rebuild kit for the existing installed compressor within 60 days of award.
2.2. EQUIPMENT INSTALLATION
The following are requirements for installation of the equipment:
The contractor shall install the refurbished compressor and the new motor at Bldg. 670 refrigeration room within the Moser Nitration Facility. The unit shall be completely installed within a designated 2-week period (start to finish) as determined by NSWC IHEODTD.
NSWC IHEODTD will provide the contractor at least a 14 calendar day notice as to when the Moser Nitration Facility will be placed in downtime status. The contractor shall be available to provide the service at the time specified.
It is the contractor’s responsibility to ensure that all tools, documentation, equipment, necessary, to complete the job, are available at time of installation. Rigging support will be provided by NSWC IHEODTD.
The existing compressor and motor unit that are replaced shall be appropriately drained and/or sealed and stored within Bldg. 670. Any other associated tools/materials/trash shall be removed from the building and disposed of at the contractor’s expense.
The contractor shall recover and re-use existing R-22 refrigerant charge and check the system for leaks.
2.3. REFRIGERATION UNIT SERVICE
Unit services include the following. Additional information for each task is detailed in the following sections.
Task One: Bimonthly inspections and preventive maintenance of York R-22 Chiller System.
The Contractor shall perform six bimonthly and one annual inspection and service of the York Chiller system at Building 670. The Contractor must be an authorized York service representative and the technicians must be qualified to work on industrial chiller systems and its associated equipment and controls. Technicians must have applicable Environmental Protection Agency/Ozone Depleting Source training for the proper handling of refrigerant and provide records to the Navy of all refrigerants recovered/added. Service and inspection to be based on manufacturer’s recommendation and at a minimum include the following:
Refrigerant
| Bi-monthly Inspections |
| Annual Inspections |
| Inspect the system, check for refrigerant leaks. |
| Inspect the system, check for refrigerant leaks. |
York Model RS84A-22 Compressor
| Bi-monthly Inspections |
| Annual Inspections |
1. Run compressor to ensure operation and to maintain gaskets to prevent refrigerant leakage (Note: NSWC IHEODTD to provide heat load as necessary to support compressor operation).
2. Inspection of compressor units drive systems.
3. Visual inspection of the compressor, motor and associated piping and valves.
4. Grease bearings.
1. Verification of compressor end play is within manufacturer’s specifications
2. Test of all compressor safeties
3. Calibration check of all compressor pressure and temperature sensors
4. Verification of compressor control panel and starter operation.
York Chiller
| Bi-monthly Inspections |
| Annual Inspections |
1. Verification of brine chiller operation
2. Visual inspection of York chiller and associated piping and valves
3. Grease bearings
Evaporative Condenser (EVAPCO Model: LSCE-41, SERIAL # 11-414911)
| Bi-monthly Inspections |
| Annual Inspections |
1. Run condenser with compressor test runs.
2. Lubricate fan shaft bearings.
3. Lubricate fan shaft sleeve bearings.
4. Lubricate pump and fan motor bearings.
5. Clean pan strainer
6. Check operating level in pan and adjust float valve if necessary
7. Check belts & tension.
1. Inspection of condenser spray pump, water sump operations, fill, and spray nozzles.
2. Check sheaves and bushings for corrosion. Scrape and coat with ZRC
3. Heater Controller – Inspect controller and clean probe ends
4. Electronic Water Level Controller – Clean probe ends of scale build-up
General Inspections
| Bi-monthly Inspections |
| Annual Inspections |
| 1. None |
| 1. Annual visual inspection of all exposed piping and vessel conditions |
2. Annual visual inspection of all insulation conditions for deficiencies
3. Annual visual inspection of all valves for rust or leak potential
4. Annual visual inspection of pipe supports
The contractor shall Include provisions for adding up to 60 pounds of new R-22 refrigerant to complete the required charge on the system.
If during a maintenance inspection, it is determined that parts and repairs are needed the contractor shall notify the Government of the cost involved prior to completion of repair(s). The contractor shall provide an estimate noting what is needed to complete the repair(s) to include all parts and labor costs. The Government will review the estimate and breakdown to determine the acceptability of these repairs and consult with the Contracts Department for the purpose of order mediation if required. No additional repair costs will be accepted without the approval of the Contracting Officer.
2.4 Incidental Parts and Labor
Spare parts and repairs as needed during bi-monthly and annual maintenance shall not exceed $12,000 per year. This is for labor/parts beyond performing the maintenance tasks listed in this scope of work.
2.5 Enterprise-Wide Contractor Manpower Reporting Application (ECMRA) The Contractor shall report Contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for chiller maintenance services via a secure data collection site. Contracted services excluded from reporting are based on Product Service Codes (PSCs). The excluded PSCs are:
1) W, Lease/Rental of Equipment;
2) X, Lease/Rental of Facilities;
3) Y, Construction of Structures and Facilities;
4) D, Automatic Data Processing and Telecommunications, IT and Telecom-Telecommunications Transmission (D304) and Internet (D322) ONLY;
5) S, Utilities ONLY;
6) V, Freight and Shipping ONLY.
The Contractor is required to completely fill in all required data fields using the following web address www.ecmra.mil
Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk, at DoD.ECRMA.Support.Desk@mail.mil
3.
POINTS OF CONTACT
The NSWC IHEODTD technical point of contact information is as follows:
NSWC IHEODTD
Attention: Paul Desear 3655 Nitramine Way, Building 765 Indian Head, MD 20640-5132 Email: paul.desear@navy.mil Phone: (301) 744-2436
4. SECURITY AND BASE ACCESS REQUIREMENTS
All contractors entering NSWC IHEODTD must be U.S. citizens and must obtain a temporary identification badge from the Pass and Identification Office upon arrival. Two forms of identification, proof of insurance, and registration documents are required to obtain a temporary identification badge. ALL BASE ACCESS AND ARRANGEMENTS MUST BE DONE BY THE CONTRACTOR PRIOR TO PROVIDING SERVICES. Contact NSWC IHEODTD pass office at 301-744-4379 for further information.
5. PERIOD OF PERFORMANCE:
The period of performance shall be a base year (365 days) from the date of contract award with four one-year options to follow.
REFERENCE 1.1
COMPRESSOR
SCOPE OF WORK
SERVICE CONTRACT FOR REFURBISHMENT OF COMPRESSOR, NEW MOTOR, AND PREVENTIVE MAINTENANCE – MOSER PLANT BRINE CHILLER
Manufacture: York Model No: RS84A-22 No. Cylinder: 8 Stoke: 4-1/2 Bore: 3-3/4 Drive Type: Belt
RPM: 1040
CFM: 238
HP: At least 69.5 Steps, Cylinders loaded (%): 100, 75, 50, 25 Oil Type: York “C” Oil Charge (Gallons Each): 4
REFRIGERATION MOTOR
Manufacture: Reliance Power: 100 HP Voltage: 230/460 V Phase: 3 Frequency: 60 Hz Frame size: 404T Frame
RPM: 1770
FLA: 240/120
Open Drip Proof (ODP) enclosure motor
EVAPORATIVE CONDENSER
Manufacture: EVAPCO
MODEL: LSCE-41
SERIAL #: 11-414911
BELTS: B-75