N00174-17-R-0006_-_Amendment_0002.pdf

PDF 150 KB Posted

Attached to
Disposal and Demil of Explosive Materials
Solicitation number
N00174-17-R-0006
Issued by

About this file

Amendment to Solicitation

View the file

Other files

File Type Posted
pdp6388.pdf PDF
DimilDisposal_-_DD254.pdf PDF
Solicitation_N00174-17-R-0006.pdf PDF
Disposal_and_Demil_-_QASP_6june2016.pdf PDF
Disposal_and_Demil_-_Special_Shipping_6june2016.doc DOC document
CostSummaryFormat.xlsx XLSX spreadsheet
PastPerformanceQuestionnaire(Demil).doc DOC document
PastPerformanceMatrix.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to provide answ ers to questions received.

1. CONTRACT ID CODE PAGE OF PAGES

S 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 14-Jul-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N00174-17-R-0006

X 9B. DATED (SEE ITEM 11)

07-Jun-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

14-Jul-2017

CODE

NSWC IHEODTD N

4081 N. JACKSON RD

BLDG 841

INDIAN HEAD MD 20640-5116

N00174 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N00174-17-R-0006

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

The purpose of this amendment is to provide answers to questions received.

1. The following are the provided answers:

Question 1: Please explain the Cost Summary Format for it is not clear. The Cost Summary spreadsheet only specifies labor costs per hour; however the Scope Of Work states that the Government requires hazardous waste treatment, hazardous waste transportation and hazardous waste expertise. Furthermore, paragraph 4.1 requires a price-per pound for the treated material under each task order. Where are we to price the hazardous waste treatment, transportation and other supplies? Can we provide a separate rate sheet that will meet the service needs requested.

Answer 1: "The price-per-pound figure required by paragraph 4.1 should include any labor, material, and fees needed to process the material for treatment. The format for the cost proposal should also include any labor, material and fees needed to process the material for treatment but in the cost proposal there is more detail than the simple price-per-pound figure. A separate rate worksheet is not requested as the cost proposal format is, we believe, clearly stated.

Also, the price-per-pound figure is a performance/compliance criteria required by the

Government and the figure is not part of the cost proposal, though its derivation should be evident from the cost proposal."

Question 2: Paragraph 1.1 of the General Introduction, states, that "Closed demil technologies are preferred." Will the government allow open pit burning?

Answer 2: PERFORMANCED BASED STATEMENT OF WORK FOR RCRA

TREATMENT OF D003 ENERGETIC MATERIALS

Paragraph 1.1 is changed as follows: "Closed demil technologies are preferred" language is hereby deleted in its entirety and is replaced with the following: “The technical evaluation will not consider a preferred demil technologies but will only evaluate the proposed technology by the other criteria provided in the PWS.”

Question 3: Is a SECRET clearance required?

Answer 3: Page 42 and 47 states that a SECRET clearance is required. No security restriction is needed. Demil work will be unclassified.

2. All other terms and conditions remain unchanged.

3. Direct any questions or concerns to Waylin Duhon at waylin.duhon@navy.mil or (301) 744-6746.

mailto:waylin.duhon@navy.mil

File details come from the government source that posted it. Updated .