27SSNEM01 SOW.pdf
PDF 227 KB Posted
- Solicitation number
- N0017327SSNEM01
About this file
This is a Statement of Work (SOW) for the Advanced Processing and Algorithm Development (APAD) program supporting the Naval Research Laboratory (NRL) in Washington, DC.
The contractor shall provide scientific, engineering, and analytical support in remote sensing data exploitation, algorithm development, artificial intelligence and machine learning framework integration, high-performance scientific software engineering, database architecture, commercial imagery and COTS sensor tool integration, and comprehensive system test and evaluation. Work will be performed at contractor facilities, SCIF spaces, NRL-DC, designated DoD and Intelligence Community sponsor sites, and operational user training facilities. The contractor must analyze and process data across all classification levels up to Top Secret/SCI spanning SI/TK/G/HCS. Five primary tasks are required: (1) Algorithm and Software Development; (2) Technical Documentation; (3) Data Processing, Analysis, and Assessment Tools Support; (4) Unclassified Imagery and Analysis Support; and (5) Training and Technical Presentations. Technical requirements include multi-modal and SAR algorithm design for maritime domain awareness and vessel detection, radar phenomenology exploitation, interactive data visualization, software implementation in MATLAB with Python/C++ interoperability, verification and validation campaigns, ground truth data collection and labeling, high-throughput optimization for GPU acceleration, commercial SAR imagery vendor liaison, and overhead SAR collection efficiency studies.
Deliverables include monthly labor and financial status reports (CDRL A001), monthly technical reports (CDRL A002), algorithm and software development documents (CDRL A003), technical reports and presentation materials (CDRL A004), and patents reporting of subject inventions via DD Form 882 (CDRL A005). Special requirements mandate that all contractor personnel possess a DoD Tier 3 investigation for base access, with Secret clearance required for Secret material access and Top Secret/Tier 5 investigation required for Top Secret material access. All personnel must complete DCSA OPSEC training. Personnel with interim SECRET clearances may only work on unclassified tasks and are prohibited from accessing COMSEC, SCI, SAP, NATO, CNWDI, RD, NNPI, and FGI information. The contractor must comply with NRL Occupational Safety and Health Manual 5100.13C, NFPA 70E-2021, and NRL Security Manual 5510.40D. The support team must be fully functioning at base contract award or option exercise, with the contractor maintaining a single Program Manager point of contact responsible for cost and schedule performance.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N0017327SSNEM01 SOW
Section C - Description/Specifications/Statement of Work
STATEMENT OF WORK
Advanced Processing and Algorithm Development (APAD)
1.0 INTRODUCTION
This Statement of Work describes the scientific, engineering, and analytical support to be provided to the Naval Research Laboratory (NRL), Washington, DC, under the Advanced Processing and Algorithm Development (APAD) program. NRL seeks contractor technical assistance in the highly specialized areas of remote sensing data exploitation, mathematical and physical algorithm development, artificial intelligence and machine learning (AI/ML) framework integration, high-performance scientific software engineering and code optimization, database architecture and multi-source data management, commercial imagery and COTS sensor tool integration, and comprehensive system test, evaluation, and transition. Tasks will be performed at the contractor’s approved facilities and SCIF spaces, NRL-DC, designated DoD and Intelligence Community sponsor sites, and operational user training facilities.
1.1 Background
The Naval Research Laboratory (NRL) has a continuing interest in developing innovative new technologies and analytic techniques for exploiting and processing classified remotely sensed data. NRL has demonstrated that it is a leader in advancing the state of the art in data processing and exploitation.
1.2 Scope
The Contractor shall provide expertise in advanced processing and algorithm development in support of NRL’s research and development (R&D). The Contractor shall analyze and process data across all classification levels, up to and including Top Secret / SCI spanning SI/TK/G/HCS. The Contractor shall execute the following tasks:
Task I – Algorithm and Software Development
Task II – Technical Documentation
Task III – Data Processing, Analysis, and Assessment Tools Support
Task IV – Unclassified Imagery and Analysis Support
Task V—Training and Technical Presentations
2.0 GENERAL REQUIREMENTS
The Contractor shall have its support team in place and fully functioning at the time of the base contract award or exercise of a contract option.
During this period the Contractor will execute the technical requirements of either the base or option of the contract in a manner that provides for high quality, timely support while incorporating the proper mix and the most effective use of personnel.
2.1 Non-Personal Services
The Government will neither supervise Contractor employees nor control the method by which the Contractor performs the required tasks. The Government will not assign tasks to, or prepare work schedules for, individual Contractor employees.
The Contractor shall be responsible for managing its employees and guarding against any actions that are of the nature of personal services, or give the perception of personal services as defined in FAR-Part 37, Service Contracting.
The Contractor shall notify the Contracting Officer (KO) if any Government-requested actions constitute, or are perceived to constitute, personal services.
2.2 Overview
The following subsections specify requirements for contract management and contractor personnel administration.
2.2.1 Contract Management
The Contractor shall establish clear organizational lines of authority and responsibility to ensure effective management of the resources assigned to this contract.
2.2.2 Personnel Administration
The Contractor shall assign a single point of contact, also known as the Program Manager (PM), who must work closely with the Government Contracting Officer and Contracting Officer’s Representative (COR), as applicable.
The Contractor PM must ultimately be responsible for ensuring that the Contractor’s performance meets all government contracting requirements within cost and schedule. The PM must have the requisite authority for full control over all company resources necessary for contract performance. As appropriate, the role of the PM may be a full-time management position, or a collateral duty assigned to a technical team member.
The Contractor shall make necessary travel arrangements for Contractor employees only after the travel has been reviewed and approved by the COR.
2.2.3 Contract Administration
The Contractor shall establish processes and assign appropriate resources to effectively administer this contract.
The Contractor shall respond to Government requests for contractual actions within five (5) working days.
2.2.4 Subcontractor Management
The contractor shall be responsible for any subcontract management necessary to integrate work performed on this contract and shall be responsible and accountable for subcontractor performance on this contract. The prime contractor will manage work distribution to ensure there are no Organizational Conflict of Interest (OCI). Consent to subcontract shall be in accordance with procedures established under FAR clause 52.244-2, Subcontracts.
2.3 Contractor Furnished Equipment, Materials, Subcontracts and Supplies
Equipment and unexpended materials and supplies purchased by the contractor under this contract become the property of the Government at the end of the performance period, including all options.
The contractor shall provide any other equipment, material, and supplies, not furnished by the Government, but required to perform the work detailed herein.
2.4 Contractor Personnel, Disciplines, and Specialties
The required and/or desired minimum education, certifications, clearance, and experience requirements for contractor personnel to perform the support tasks identified in this SOW are defined in the contracts “Personnel Qualifications” attachment.
2.5 Use of Government Property at Government Facilities
If determined to be in the Government’s best interest, the Government will make available the materials, office space, communications capability, and information for use by the contractor in the performance of this contract at Government facilities. Government property used by the contractor at the Government’s facilities will be on a rent-free basis and all such property shall be considered to remain in the possession and control of the NRL for property responsibility and accountability purposes.
2.6 Requirement for On-site Contractors
The contractor shall comply with requirements for On-Site Contractor performance at Government facilities. The full text of the requirements for On-Site contractors is set forth as an attachment to the contract. Pursuant to DFARS 211.106 contractor employees shall identify themselves as contractor personnel by introducing themselves or being introduced as contractor personnel and displaying distinguishing badges or other visible identification for meetings with Government personnel. In addition, contractor personnel shall appropriately identify themselves as contractor employees in telephone conversations and in formal and informal written correspondence.
2.7 Place of Performance
It is anticipated that work will be performed at the following locations:
• NRL - Washington, DC
• NRL Chesapeake Bay Detachment (CBD) – Chesapeake, MD
• NRL Blossom Point Test Facility
• Other Government facilities as needed
• Contractor facilities
The contractor shall perform work at Government facilities within the normal work hours unless differing hours are specified by the COR. The contractor is not required to maintain the same hours as Government employees; however, contractor employees performing working at NRL must work during the normal workweek. Contractor personnel working off-site must remain reachable (e.g. phone, email, Microsoft Teams, etc.) by Government personnel. In the event of severe weather conditions, the contractor should refer to the top banner of the NRL website for the NRL-DC operating status or refer to the Office of Personnel Management website for the operating status of the U.S. Government offices in Washington, D.C. area and for additional information.
2.8 Travel / Temporary Duty (TDY)
Travel may be required to conduct experimental research, and/or attend Government reviews or scientific meetings and seminars. The contractor shall submit all travel requirements (e.g. plans, agenda, itinerary, and dates) in writing for pre-approval to the Government COR. Travel is on a strictly cost-reimbursable basis.
The contractor shall bill costs for travel in accordance with FAR 31.205-46 Travel Costs (subject to local policy & procedures) and DoD’s Joint Travel Regulations.
The contractor shall be able to provide two persons within one day of travel notification for deployment to support work described in this SOW at any location within the United States. The persons are to deploy with tooling for mechanical or electrical work necessary to maintain or repair EMWRF related equipment.
2.9 Patents – Reporting of Subject Inventions
All subject inventions must be properly reported through the iEdison system at https://www.nist.gov/iedison. Additionally, the contractor shall provide interim reports and a final report in accordance with DFARS 252.227-7039 Patents - Reporting of Subject Inventions, utilizing DD Form 882. If there are no subject inventions to report, the contractor is still required to submit the DD Form 882. Reports shall be delivered via email to the points of contact identified in Block 14 of CDRL A0005.
3.0 TECHNICAL REQUIREMENTS
The following section specifies the base technical requirements of the contract. The Government will assign specific projects during the contract performance via Technical Instructions tasked by the Contracting Officer’s Representative (COR) in accordance with the clause in Section H of the solicitation and resultant contract entitled “Technical Instructions”.
3.1 Algorithm, Phenomenology & Software Development
3.1.1 Multi-Modal & SAR Algorithm Design: Design, develop, refine, and benchmark innovative signal and image processing algorithms operating across unclassified up to TS/SCI security levels. Specifically, develop overhead Synthetic Aperture Radar (SAR) processing algorithms supporting wide-area, open-ocean maritime domain awareness, automated vessel detection, wake analysis, and target classification for Navy missions. Partner with government scientists and external contractor teams to refine data processing concepts and share exploitation approaches across the defense community.
3.1.2 Radar Phenomenology & Hybrid Modeling: Exploit radar phenomenology derived from both raw SAR phase history data and complex valued image data (e.g., Single Look Complex (SLC), polarimetric, and interferometric data). Leverage a combination of advanced Digital Signal Processing (DSP), physics-based electromagnetic scattering/hydrodynamic models, and Artificial Neural Networks (ANNs) / Machine Learning (ML) to maximize detection sensitivity and classification accuracy in high-clutter maritime environments.
3.1.3 Interactive Data Visualization: Design and implement advanced, interactive data visualization algorithms and graphical user interfaces (GUIs) to allow analysts and researchers to dynamically inspect complex SAR imagery, phase history domains, spectral signatures, and multi-dimensional algorithmic outputs.
3.1.4 Community Collaboration: Partner with NRL government scientists, Navy operational stakeholders, and external contractor teams to refine SAR data processing concepts, standardize maritime exploitation methodologies, and aid in the transition of algorithmic approaches across the broader defense and intelligence community.
3.1.5 Software Implementation & Integration: Implement prototype and production algorithms primarily within the MATLAB environment (as well as interoperable languages such as Python or C/C++ where required) as modular, functional software components. Integrate these components into NRL’s core exploitation toolkits and baseline operational architectures.
3.1.6 Verification, Validation (V&V) & Characterization: Conduct rigorous software verification, validation, and mathematical performance characterization (including Receiver Operating Characteristic (ROC) curves, confusion matrices, and false alarm rate analyses across varying sea states and SAR collection geometries and modes) to ensure operational utility, stability, and robustness prior to baseline transition.
3.2 Technical & Source Code Documentation
3.2.1 Formal Deliverables & Specifications: Author and deliver comprehensive algorithmic theoretical descriptions (ATDs), software architecture descriptions, Application Programming Interface (API) references, mathematical derivations, and end-user guides prior to NRL sponsor reviews and software transitions.
3.2.2 In-Line Source Code Documentation: Maintain rigorous software engineering standards by embedding detailed, standardized documentation directly within the MATLAB source code (e.g., function headers, input/output parameter definitions, unit assumptions, algorithm lineage, and inline comments) to support maintainability, peer review, and automated help-file generation.
3.2.3 Reports & Briefing Decks: Prepare recurring and milestone deliverables primarily as executive and technical briefing decks, test evaluation summaries, and formal NRL technical reports/manuals regarding algorithm efficacy and V&V campaign results per Government direction.
3.3 Data Processing, Ground Truth Campaigns & Assessment Support
3.3.1 Ad-Hoc Exploitation Support: Respond dynamically to ad-hoc NRL and Navy stakeholder exploitation requests, providing rapid processing of overhead SAR collections, anomaly investigation, and custom wide-area maritime search analyses.
3.3.2 Ground Truth Campaign Planning & Execution: Coordinate, plan, and execute comprehensive maritime ground truth collection campaigns to support algorithm development and V&V. Coordinate overhead sensor tasking synchronized with cooperative target vessels, AIS (Automatic Identification System) feeds, and environmental/oceanographic truth data.
3.3.3 Data Curation, Labeling & Statistical Analysis: Structure, manage, and ingest large-scale SAR phase history and complex imagery repositories.
Perform systematic data truthing, bounding-box/pixel-level annotation, and metadata labeling (correlating radar signatures with vessel class, orientation, speed, and sea state) to build curated training and evaluation datasets. Conduct formal statistical analyses on campaign data to quantify algorithm performance boundaries.
3.3.4 High-Throughput Optimization & AI/ML Scaling: Perform MATLAB and associated source code optimization (including parallelization, GPU acceleration, and memory management) for high-throughput computing environments to support wide-area, low-latency open-ocean processing.
Design, train, and validate deep learning and neural network architectures tailored to complex-valued radar data.
3.3.5 Exercises & Operational Assessments: Support government maritime exercises, fleet experimentation, operational assessments, and live/simulated capability demonstrations by providing real-time or near-real-time SAR exploitation and visualization support.
3.4 Unclassified Imagery & Commercial Data Support
3.4.1 Commercial Vendor Liaison: Act as the primary technical point of contact (POC) for commercial SAR imagery vendors, maritime data providers (e.g., commercial RF/AIS aggregators), and Commercial Off-The-Shelf (COTS) software providers (including MathWorks/MATLAB toolboxes).
3.4.2 Data & License Management: Manage, track, and account for commercial SAR imagery tasking orders, archive purchases, software licenses, and associated data rights/materials.
3.4.3 Standards & Ingestion Pipelines: Lead technical coordination meetings defining commercial SAR data formats (e.g., CRSD, CPHD, SICD, SIDD and STANAG 4607), complex phase history ingestion pipelines, metadata harmonization, and overall toolchain utility.
3.5 Overhead SAR Collection Efficiency & Sensor Performance Assessment
3.5.1 Quantitative Efficiency Studies & Novel Metrics Development: Design and execute rigorous quantitative studies to evaluate overhead SAR collection efficiency and end-to-end system performance. Develop novel mathematical and operational metrics that benchmark achieved operational collection efficiency against theoretical maximum sensor and orbital/kinematic performance baselines.
3.5.2 Experimental Data Collection & Trade-Space Campaigns: Plan and execute dedicated experimental SAR data collection campaigns designed to probe sensor operational boundaries. Collect empirical data across varied radar modes, grazing angles, pulse repetition frequencies (PRFs), and bandwidths to support quantitative performance characterization.
3.5.3 Tasking, Scheduling & Payload Characterization: Conduct in-depth data and systems analysis to characterize the performance of mission tasking software, collection scheduling algorithms, and radar payload hardware/firmware against system requirements. Isolate and quantify timeline bottlenecks, slewing/settling overheads, and resource allocation inefficiencies across the tasking-to-collection chain.
3.6 Training & Technical Presentations
3.6.1 End-User & Analyst Training: Develop training curricula and deliver hands-on instruction to Government scientists, analysts, and operators on NRL SAR exploitation toolkits, interactive visualization tools, and integrated MATLAB software modules at NRL and stakeholder facilities.
3.6.2 Technical Symposia & Demonstrations: Present technical findings, radar phenomenology studies, V&V statistical assessments, architecture overviews, and interactive capability demonstrations to NRL leadership, resource sponsors, and defense symposia.
4.0 DELIVERABLES
4.1 Monthly Labor and Financial Status Report (CDRL A001)
The Contractor shall prepare and deliver a Contractor On-Site Labor and Financial Status Report in accordance with DI-FNCL-81537. The report should include the following:
4.1.1 Funding history, showing when and how much money was added to each ACRN for each person on the task, amounts allocated to labor, travel, and material, along with cumulative task funding for labor, travel, and materials;
4.1.2 Funding balance for labor, travel, and materials in each ACRN and by person at the beginning of the monthly reporting period;
4.1.3 Labor hours and amounts expended for labor, travel, and materials in each ACRN and by person during the monthly reporting period;
4.1.4 Funding balance for labor, travel, and materials in each ACRN and by person at the end of the monthly reporting period;
4.1.5 All other information specified in A001.
4.2 Monthly Technical Report (CDRL A002)
The Contractor shall provide a monthly summary report of progress on each task of the contract, in accordance with DI-MGMT-81928, that includes the following information:
4.2.1 Description of the work accomplished;
4.2.2 Summary of meetings attended;
4.2.3 Plans for next reporting period;
4.2.4 Summary of issues or concerns, if any.
4.3 Algorithm, Software Development, and Data Processing Documents (CDRL A003)
The contractor shall address all relevant topic areas included in DI-IPSC-82284, CDRL A003, and shall deliver: all technical data, computer programs, computer software documentation, and all physical items developed under the SOW.
4.4 Technical Reports & Presentation Materials (CDRL A004)
The Contractor shall provide technical reports and presentations in accordance with DI-MISC-80711A. The reports shall document the results of activities performed in completing the tasks outlined in the Statement of Work (SOW) during the reporting period. The report must include, at a minimum, a summary of the current technology, including pertinent observations, nature of technical problems, positive as well as negative results and design criteria established to this point.
4.5 Patents – Reporting of Subject Inventions (CDRL A005)
The Contractor shall provide interim reports and a final report in accordance with DFARS 252.227-7039 Patents - Reporting of Subject Inventions, utilizing DD Form 882. If there are no subject inventions to report, the contractor is still required to submit the DD Form 882.
5.0 SPECIAL REQUIREMENTS
5.1 Security
The following are required at the time of award:
All Contractor personnel who require NRL base access or access to NRL unclassified material and/or unclassified systems shall possess a favorably completed DoD Tier 3 investigation.
Contractors who require access to Secret material must have, at a minimum, a favorably completed DoD Tier 3 investigation and final DoD-granted Secret security clearance.
Contractors who require access to Top Secret material must have, at a minimum, a favorably completed DoD Tier 5 investigation and final DoD-granted Secret security clearance.
The Contractor shall ensure that all classified material is handled in accordance with the issued DD 254, the National Security Program Operating Manual (NISPOM) (DoD 5220.22M) and all NRL and applicable Security Program Guides/Directives.
All Contractors (including subcontractors) identified in the Statement of Work shall supplement their current security practices by requiring any personnel involved in executing the contract to complete Government-sponsored and administered Operations Security (OPSEC) training via DCSA through their CDSE site: https://securityawareness.usalearning.gov/opsec/index.htm; and follow any OPSEC guidance that may pertain to the project.
All Contractors (including subcontractors) issued a DoD interim SECRET security clearance may ONLY work on unclassified tasks in accordance with this contract SOW. No classified access will be authorized. Unclassified IA or IT positions are NOT authorized with a DoD issued interim SECRET clearance.
Contractors with an Interim SECRET clearance must be escorted at all times in classified spaces. Contractors with an Interim SECRET clearance are prohibited from having any access to the following types of classified information:
• Communications Security (COMSEC)
• Special Compartmented Information (SCI)
• Special Access Program (SAP) Information
• North Atlantic Treaty Organization (NATO) Information
• Critical Nuclear Weapons Design Information (CNWDI)
• Restricted Data (RD) (and Formerly Restricted Data)
• Naval-Nuclear Propulsion Information (NNPI)
• Foreign Government Information (FGI)
5.2 Safety
The contractor shall comply with the NRL Occupational Safety and Health Manual 5100.13C, the Safety Related Work Practices NFPA 70E-2021 and the NRL Security Manual, 5510.40D with respect to all contractor employees working at NRL.
5.3 Government Furnished Property
The Government may provide Government property to the contractor for use in the performance of this contract, which may include materials, equipment, laboratory spaces, and facilities as needed for contractor personnel working off-site of NRL.
Inventories of GFP shall be reported and maintained in the GFP Module located in the Procurement Integrated Enterprise Environment (PIEE). No other material, labor, or facilities will be furnished by the Government unless approved by the COR or Contracting Officer. If GFP/GFE/GFI is required for the performance of this effort, the contract shall clearly identify what is required and the time it is necessary for uninterrupted performance of the effort.
5.4 Travel
The contractor shall be required to travel periodically in support of the efforts described in this SOW. Travel requirements include day trips to other Government locations within the local Washington, D.C. commuting area and other CONUS travel.
(End of SOW)
| 2.2.4 Subcontractor Management |
| 2.3 Contractor Furnished Equipment, Materials, Subcontracts and Supplies |
| 2.4 Contractor Personnel, Disciplines, and Specialties |
| 2.5 Use of Government Property at Government Facilities |
| 2.6 Requirement for On-site Contractors |
| 2.7 Place of Performance |
| 2.8 Travel / Temporary Duty (TDY) |
| 2.9 Patents – Reporting of Subject Inventions |
| 5.2 Safety |
| 5.3 Government Furnished Property |
| 5.4 Travel |
File details come from the government source that posted it. Updated .