03 --- Cost Proposal.xlsx
XLSX spreadsheet 32 KB Posted
- Attached to
- TECHNICAL SERVICES for NRL 8100 DIV
- Solicitation number
- N0017327Q0002
About this file
This is a Cost Proposal template for a federal contract opportunity in support of specialized aerospace systems research and development. The template is designed for the RFP N00173-21-R-LM01 issued by the Naval Research Laboratory (NRL) Code 8124 for technical services at the Pomonkey Facility in La Plata, Maryland, and an associated Outside Continental United States (OCONUS) facility. The cost proposal spreadsheet accommodates a five-year performance period (FY-23 through FY-27) and includes sections for indirect rates, labor rate build-ups for both prime contractors and subcontractors, and a comprehensive cost summary.
The template structure includes indirect rates for fringe benefits, on-site overhead (government facility), off-site overhead (contractor facility), materials and handling (M&H), general and administrative (G&A), and fee calculations across all fiscal years. The labor build-up sections allow contractors to input base rates, apply indirect cost factors, calculate burdened rates, incorporate annual escalation percentages, and compute rates with fee for multiple labor categories. The cost summary template breaks down total labor costs by year, distinguishing between prime contractor direct labor, indirect labor costs (fringe, overhead, G&A), subcontractor labor costs with associated pass-through charges, other direct costs (ODCs), and fixed fee amounts. The spreadsheet is configured for cost-plus-fixed-fee (CPFF) pricing with separately identified cost-no-fee line items for materials and travel, reflecting the firm-fixed-price labor CLINs and cost-no-fee material/travel CLINs anticipated by the Government for this 12-month base period with four 12-month option periods.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDIRECT RATES TEMPLATE
INDIRECT RATES
OFFEROR:
| FY-23 | FY-24 | FY-25 | FY-26 | FY-27 | |
| FRINGE KTR-SITE | |||||
| FRINGE GOV-SITE | |||||
| KTR-SITE OH | |||||
| GOV-SITE OH | |||||
| M&H | |||||
| G&A | |||||
| FEE | |||||
| COM |
Only fill-in applicable FY information
LABOR BUILD-UP TEMPLATE
PRIME LABOR BUILD-UP
CHARTS BELOW MAY BE EDITED IF NEEDED.
ADD ADDITIONAL CHARTS TO REFLECT CHANGES IN APPLIED INDIRECTS FOR OUT YEARS IF APPLICABLE.
| 1. DIRECT LABOR RATE BUILD-UP | ||||||||||||||
| INPUT "0" for the non-applicable OH | ||||||||||||||
| Fringe | Overhead (Gov-Site) | Overhead (Ktr-Site) | M&H | G&A | Burdened Rate | Fee | Burdened | Escalation FY-24 | Escalation FY-25 | Escalation FY-26 | Escalation FY-27 | |||
| Labor Category | Employee | Base Rate | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | Rate w/ Fee | 0.00% | 0.00% | 0.00% | 0.00% | ||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| 2. SUBCONTRACTOR LABOR RATE BUILD-UP | |||||||||||
| Labor Category | Employee | Base Rate | M&H | G&A | Burdened Rate | Fee | Burdened | Escalation FY-24 | Escalation FY-25 | Escalation FY-26 | Escalation FY-27 |
| 0.00% | 0.00% | 0.00% | Rate w/ Fee | 0.00% | 0.00% | 0.00% | 0.00% | ||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
&"Times New Roman,Regular"&9R&D Support for Specialized Aerospace System &"Times New Roman,Regular"&9RFP: N00173-21-R-LM01 Attachment 04 - Cost-Price Summary Spreadsheet
SUMMARY TEMPLATE
CHART BELOW MAY BE EDITED IF NEEDED.
COST SUMMARY FORMAT
| Total | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | |||||||||||||
| Cost Elements | Labor Category (LCAT) | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount |
| Prime Contractor Direct Labor | ||||||||||||||||||
| Name | LCAT | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Name | LCAT | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Name | LCAT | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Name | LCAT | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Name | LCAT | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Name | LCAT | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Name | LCAT | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Name | LCAT | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Name | LCAT | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Name | LCAT | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Name | LCAT | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Name | LCAT | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Name | LCAT | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Name | LCAT | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
Total Direct Labor Cost - 0 $0.00 - 0 $0.00 - 0 $0.00 - 0 $0.00 - 0 $0.00 - 0 $0.00
| Prime Contractor Indirect Labor Cost | Amount | Rate | Amount | Rate | Amount | Rate | Amount | Rate | Amount | Rate | Amount |
| Fringe Benefits | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 |
| On-Site Overhead (Gov't Facility) | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 |
| Off-Site Overhead (KTR Facility) | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 |
| G&A | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 |
| Total Indirect Labor Cost | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Total Direct and Indirect Labor Cost | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| COM | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Total Prime Contractor Labor Cost | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Subcontractor Labor Cost | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | |
| Name/Company | LCAT | - 0 | $0.00 | $0.00 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | |
| Name/Company | LCAT | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Name/Company | LCAT | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Name/Company | LCAT | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Name/Company | LCAT | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
| Name/Company | LCAT | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | - 0 | $0.00 |
Total Proposed Subcontractor Labor Cost - 0 $0.00 - 0 $0.00 $0.00 $0.00 $0.00 $0.00
| Prime contractor pass through (not including fee) | Rate | Amount | Rate | Amount | Rate | Amount | Rate | Amount | Rate | Amount | |
| Material & Handling | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 |
| G&A | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 |
Total M&H and G&A on Subcontractor Labore $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Labor Cost (Prime and Subcontractor Labor) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
| Fee | Rate | Amount | Amount | Amount | Amount | Amount | |||||
| Fixed Fee - Prime Labor Costs Only | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 |
| Fixed Fee - Subcontract Labor Costs Only | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 |
| Total Fee (for Prime and Subcontractor Labor Costs) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
Total Labor Cost Plus Fixed Fee (CPFF) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
| Other Direct Costs | Rate | Amount | Rate | Amount | Rate | Amount | Rate | Amount | Rate | Amount | |
| ODC - Gov't Plug | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| M&H | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 |
| G&A | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 | 0.00% | $0.00 |
| Total ODC | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
Total Task Order CPFF $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
&"Times New Roman,Regular"&9R&D Support for Specialized Aerospace System &"Times New Roman,Regular"&9RFP: N00173-21-R-LM01 Attachment 04 - Cost-Price Summary Spreadsheet
File details come from the government source that posted it. Updated .