This Statement of Work outlines requirements for laboratory renovation project PW6719 at Building 42 of the Naval Research Laboratory (NRL). The project aims to upgrade existing laboratories into showcase facilities demonstrating cutting-edge, flexible, and mobile configurations for future laboratory development.
The contractor must perform specific requirements including: upgrading electrical panels and LED lighting, installing multifunctional utility hubs with quick connects in the ceiling grid, replacing ceiling tiles, installing evaporators and condensers, connecting supply lines for vacuums and N2 for fume hoods, installing new DI water shutoff valves, relocating sinks with concrete floor drilling, providing hot/cold water rough-ins, and installing drywall where needed. All parts and materials are specified in a separate Bill of Materials (BOM). The period of performance is 24 weeks after award, with all work to be performed at Building 42 at NRL.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PR1301208160 Continuation page.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
TITLE: PW6719-Building 42 Laboratory Renovation
I. Background Information
The customer has requested that their current laboratories be upgraded as a showcase lab for future laboratory development.
II. Scope
The laboratories will be cutting edge, highly flexible and mobile, with multiple available configurations. These labs will demonstrate the flexibility of future laboratory functions.
IV. Services to be performed.
“The contractor shall independently perform all work and furnish all labor, materials, supplies, equipment, and services (except as otherwise specified in the contract) to perform the following services”:
A. Specific Requirements –
1. Upgrade Electrical panel/service and access in each designated laboratory
2. Upgrade Electrical lighting fixtures to LED
3. Install and connect multifunctional utility “Hubs”, with quick connects, in the ceiling grid
4. Replace 2x2 ceiling tiles as required
5. Install evaporators and condensers and provide all required connections and power
6. Connect new supply lines and adapters for vacuums and N2 for Fume Hoods, and CA
7. Drain DI water and provide new shut-off valves
8. Relocate existing sinks; core drill concrete floor for new drain location
9. Provide hot and cold water rough-ins and drains where required
10. Provide drywall where wall chase is required in laboratory
B. Reports & Deliverables - NA
C. Provide a parts lists that are to be procure or maintained.
All parts/materials have been indicated on the BOM submitted
V. Period of Performance
Period of Performance will be 24 weeks after award. All work will be performed at building 42 at
NRL.