Q and A N00173-24-Q-TL09 Amendment 0001.pdf
PDF 158 KB Posted
- Attached to
- MOTION CAPTURE SYSTEM
- Solicitation number
- N00173-24-Q-TL09
About this file
This solicitation requests quotes for a motion capture system to record and analyze three-dimensional movements at the Naval Research Laboratory. The system must provide complete camera coverage of a 75' x 150' x 30' high bay, with Ethernet connectivity between cameras and computers. Quotes should include all hardware, software, installation, training, and a two-year warranty. The government will evaluate quotes based on technical capability and past performance. Delivery is required within 60 days of award, with installation within 15 days of delivery. The contract will have a one-year base period and one optional one-year extension.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTIONS & ANSWERS FOR MOTION CAPTURE SYSTEM
Q&A: N00173-24-Q-TL09 AMENDMENT 0001
1. What is the existing power infrastructure?
Response: PHB has existing voltage of 120/277/480 VAC
a. Is the power supply stable?
Response: Yes
b. Will UPS(s) be required?
Response: No
i. If so, what is the power requirement?
ii. How many UPS?
2. Are there existing fiber optic access points?
Response: No
a. Will new fiber optic cables be required?
Response: No
i. If so, what type?
b. What are the lengths of the fiber optic cables from point of origin to end destination?
c. How many fiber optic runs?
d. What termination types will be required?
3. Will trenching be required?
Response: No
a. If so, are the utility locations marked on the ground and/or properly documented?
b. Will dig permits be required?
c. Who will be required to obtain the digging permits?
4. Will lead and asbestos abatement be required?
Response: No
a. Have the buildings been tested for lead and asbestos?
Response: There is no known lead or asbestos in PHB.
i. If so, will the government provide the results of the testing?
Response: N/A
b. Are there any other health hazards associated with the applicable installation and maintenance?
Response: No
5. Are any of the buildings listed as historic buildings?
Response: No
a. If so, who will determine the locations approved for possible drilling and camera placement?
Response: N/A
6. Is the existing camera system analog or IP?
Response: Any existing Camera system is not applicable to current solicitation.
a. Are the cameras connected by ethernet or coax cable?
Response N/A
7. Is Cat6 plenum indoor and outdoor cable required?
Response: System cabling must be provided in adherence to specification VI.U. The system must provide a minimum Gigabit Ethernet connection, or faster connection between the cameras and computer for real-time data flow.
a. Are there existing cable raceways or paths to route the new ethernet through?
Response: Yes
b. Will conduit be required?
Response: No
i. If so, what type and how many feet?
8. Will existing equipment need to be tested?
Response: No existing equipment will be part of the system specifications, and therefore no existing equipment shall be tested.
a. If so, what type of equipment?
b. Number of each?
9. Will existing cameras need to be replaced?
Response: No existing cameras will be part of the system per the specifications, and therefore no existing cameras shall be replaced.
a. If so, how many cameras need to be replaced?
Response: N/A
b. What type and/or brand of cameras are they to be replaced with?
Response: N/A
10. Camera locations:
Response: Specification VI.C. The system must provide an appropriate number of cameras for complete coverage of a 75' wide x 150' long x 30' High Bay. In meeting the specifications the vendors system shall determine the accurate number and location of cameras.
How many cameras are/will be mounted above 12' on the buildings/poles?
a. How many cameras are/will be roof top mounted?
b. How many cameras are/will require a lift?
11. Do the buildings have drop ceilings, or are they solid ceilings between floors?
Response: No
12. Are “To Scale” drawings available for publication?
Response: Elevation drawings provided
a. If not, what is the length, width, and height of the building(s).
Response: L-150’ x W-75’ x H-30’
13. What are the “testing requirements” for the new or upgraded system(s)?
Response: Testing requirements listed in specification line item VI.AA. The manufacturer must provide system installation, commissioning, system verification and operator training in order to verify a fully operational system in accordance with the written specifications. . This must be conducted by a factory trained Field Service
Technician and/or a Field Service Engineer. Operational training raining must be provided independently for the indoor fixed system as well as for the mobile offsite system. The training must include testing and verification of system features specification
VI.I in order to prove four operators can track four sets of targets independently in four separate quadrants simultaneously. .
14. Is the government able to extend the solicitation’s due date?
Response: Please see response date in Amendment 0001
Section VI.I. The Prototyping High Bay will be used by many NRL researchers and shall be divided into as many as four different quadrants. The system must include 2 separate computer systems that shall allow a minimum of four users to share equipment and track their own set of targets at the same time.
Questions
15. Is the intent here to have a minimum of four individual users each able to use their own single different quadrant of the Prototyping High Bay simultaneously to track their own set of targets at the same time?
Response: Yes.
16. Are four or more users supposed to be able to share a single computer operating one, two, three, or all quadrants to track their own set of targets at the same time?
Response: No, Two sets of users shall be able to share a two computers; maximum one user per quadrant.
17. Should both computer systems be suitable for and able to run a single quadrant, multiple quadrants, or all quadrants at the same time?
Response: Each computers should be able to run multiple quadrants at the same time.
18. Do we need to provide tripods for the 8 cameras with a wider Field of View and shorter range, and if so, should we provide them with small (extend up to 5.6’ high without 3-way heads), medium (extend up to 7.45’ high without 3-way heads), or large (extend up to 8.75’ high without 3-way heads) tripods?
Response: No, additional tripods are not required outside of the written specification VI.Z
The Prototyping High Bay is 75' x 150' x 30' high and appx. 3,700 sq. ft. Cameras will be mounted to the walls and ceiling, which can frequently be affected by expansion and contraction, which is caused by both interior and exterior temperature fluctuations. Wall and ceiling vibration, based upon exterior weather conditions, often occurs as well.
19. In order to calculate the correct number of cameras to be quoted, is it possible to have a layout from you of the lab with confirmation of what will give the volume/area of actual work?
Response : The volume in which tracking is required is the entirety of the Prototyping High Bay at the dimensions of 75 x 150” x 30’ high, with an approximation of 3,700 sq. ft.
20. It would be perfect to also receive the correct layout of the beams where the cameras can be installed.
Response : A PowerPoint presentation will be provided indicating the requested location of mounting points. (See LASR Facility PHB Drawings Camera Mounting attachment in Amendment 0001).
21. This is for both the indoor and outdoor laboratory.
Response : The outdoor Mobile setup has no such structure and therefor no layout of beams can be provided.
22. Should system 0002 be separate and independent from system 0001, or can the cameras in system 0001 also be used for system 0002?
Response : System 0002 must be separate and independent from system 0001. See revised specifications for clarification
23. When is the laboratory to be installed?
Is it possible to know the installation date when it will be scheduled?
Response : The NRL would like for the system to be installed in the 2024 calendar year. In accordance with solicitation instructions, Offerors are to proposal a delivery schedule for all contract line items, installation and training schedule.