Attachment 1 - SOW_03.08.2022 - Amendment 0001.docx

DOCX document 22 KB Posted

Attached to
5-Year Corrosion Inspection for DHC-6 Twin Otter Aircraft
Solicitation number
N00173-22-Q-CM01
Issued by

About this file

This statement of work outlines the requirements for a 5-year corrosion inspection and maintenance of a DHC-6-300 Twin Otter aircraft for the Naval Research Laboratory. The contractor will perform corrosion inspection, complete EMMA maintenance cards, replace primary control cables, conduct oxygen bottle hydrostatic testing and regulator overhaul, install an HF 230 or equivalent radio system, and optionally install an electrical preheat system or replace the weather radar transmitter. The inspection and maintenance must be done between April 15th and June 11th, 2022 at the contractor's FAA-approved facility. The contractor will provide all required tools, equipment, and certified staff to complete the tasks and any necessary subcontractor work must be pre-approved by NRL. The contractor will also report discrepancies found during inspection on a weekly basis and any overhaul, repair, or replacement work requires prior approval from NRL.

View the file

Other files

File Type Posted
VXS-1 Twin Otter Maintenance Data.pdf PDF
Questions and Answers - N00173-22-Q-CM01.docx DOCX document
Attachment 1 - SOW_2.15.2022.docx DOCX document
Attachment 2 - GFP.xlsx XLSX spreadsheet
Combined Synopsis-Solicitation - N00173-22-Q-CM01.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

COMPLETE CORROSION INSPECTION AND OVERLAPPING ADs FOR DHC-6-300 TWIN OTTER AIRCRAFT

1.0 Introduction

Scientific Development Squadron ONE (VXS-1), a subordinate command of the Naval Research Laboratory (NRL), conducts Science & Technology (S&T) experimentation and advanced technology development. This requirement is to provide a complete 5 Year corrosion inspection with overlapping Airworthiness Directives (ADs) as well as all required Equalized Maintenance for Maximum Availability (EMMA) maintenance items for the DHC-6-300 Twin Otter Aircraft 7933255 as prescribed by Viking Air Ltd., the Original Equipment Manufacturer (OEM). The aircraft will be available for work between 15 April 2022 and 11 June 2022.

2.0 Requirements

TASK 1: Perform Corrosion Inspection in accordance with (IAW) current requirements listed in the DHC-6 Twin Otter Inspections Requirements Manual PSM 1-6-7(IC), Years 1 through 5 Reference 2008-13-11, and applicable ADs.

TASK 2: Perform EMMA CARDS 1-47, Function Card Items, Calendar Card Items IAW PSM 1-6-7(IC), and all required items in EMMA CARDS SP 1 and SP 2.

TASK 3: Replace primary control cables IAW Service Bulletin (S/B) 6/523.

TASK 4: Conduct 5 Year Hydrostatic Testing of Crew Oxygen Bottle and overhaul regulator per Supplemental Type Certificate (STC) SA03275NY.

TASK 5: Install HF 230 System or equally capable system.

TASK 6: (OPTIONAL LINE ITEM): Replace weather radar receiver/transmitter

· Remove current weather radar receiver/transmitter

· Install Garmin GWX75 with 12” antenna and interface with existing Garmin GTN 750 and GTN 650 cockpit avionics system

TASK 7: (OPTIONAL LINE ITEM): Install aircraft electrical preheat system capable of heating engines, avionics, battery, and project equipment (if able).

TASK 8: (OPTIONAL LINE ITEM): Perform any required unscheduled maintenance required to return the aircraft to fully operational service.

The contractor shall comply with applicable Federal Aviation Regulation and all aircraft manufacture's requirements. The Contractor will provide all special tools, facilities, equipment, and certified technical staffing to perform tasks. Maintenance Contractors must be an FAA approved repair station or equivalent AMO if Canadian for the Twin Otter. The Government reserves the right to exercise or cancel any part of this agreement. Once the aircraft arrives at the Contractors facility, no maintenance/repair work shall begin until NRL has given the approval for such work to begin. Only the work that is being requested shall be done. Any additional work or discrepancies must have prior approval from NRL. The Contractor shall provide a list of discrepancies/tear down inspection to NRL VXS-1 (See para. 5). The report shall include the extent of the inspection, condition found on all major components, outstanding service bulletins and airworthiness directives that must be complied with, and any recommendations for maintenance that would prevent future failures if applicable.

The Contractor may need to subcontract out inspection, maintenance, overhaul, and repair work. The Government reserves the right to approve or disapprove any subcontractor.

The Contractor will be responsible for all FAA and other required documentation to include but not limited to approval for return to service.

3.0 Place of Performance

Contractor’s Facility. Naval Research Laboratory will assume all costs/personnel of transiting the aircraft to and from the contractor’s facility. A Government flight crew will fly the aircraft to the Contractor’s facility in April 2022.

4.0 Period of Performance

It is estimated that work will be completed within 60 days of the arrival of the aircraft at the Contractor’ facility.

5.0 Over and Above Overhaul, Repairs and Replacements

Any necessary over and above overhaul, repairs, and replacements must be coordinated and approved by NRL prior to proceeding with the work. The Contractor is responsible for documenting and reporting, at intervals acceptable to the NRL VXS-1 Contact Point, all discrepancies found during the inspection. Discrepancies that are not a part of the inspection will be known as "over and above." Corrective actions as a result of the inspection are considered "over and above" items. Any part or component that has not reached its recommended service life, but fails inspection and needs to be replaced, is considered an "over and above" item.

The "Over and above" discrepancy report must include as a minimum:

· Description of each discrepancy found, to include extent of the inspection, condition found on all major components, outstanding service bulletins and airworthiness directives that must be complied with, and any recommendations for maintenance that would prevent future failures if applicable;

· Number of person-hours per discipline required to complete each discrepancy;

· Hourly rate for personnel performing the work;

· Parts cost per schedule of prices;

· Total dollar amount for the complete list of discrepancies.

Funding for any “over and above” items will be provided via contract modification as a separate line item.

6.0 Deliverables

Prior to the initiation of work, the Contractor will conduct an aircraft logbook and maintenance history review with NRL VXS-1. Additionally, the Contractor shall provide NRL VXS-1 the following documentation.

Upon completion of maintenance tasks and prior to aircraft delivery to NRL VXS-1:

· Over and Above Discrepancies Report (per paragraph 5.0)

· Parts and material Certifications

· Weight and Balance changes (as required)

· Logbook Entry IAW FAR 43.11 or equivalent

The Contractor shall provide Weekly Progress Reports that include at a minimum:

· Task statuses

· Potential schedule changes

· Potential issues and mitigation strategies

· Over and above discrepancies