56-7005-19_IOA.pdf

PDF 136 KB Posted

Attached to
LN2 Plumbing Installation Federal contract opportunity
Solicitation number
N00173-19-Q-0072
Issued by
Department of the Navy Secretary of the Navy Office of Naval Research

About this file

IOA

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BUYER: CARACTER MARIA L FOLDER: 56-7005

VEND NBR

VENDOR

ADDRESS

PHONE

FAX NBR

POC

Tax ID#

CAGE CD

00-000-0000 Bus Size: s Small Business

VENDOR TO BE ASSIGNED PRIOR TO RELEASE

VENDOR TO BE ASSIGNED PRIOR TO RELEASE

WASHINGTON, DC 00000-0000

-UNK

Published Price List Available? [] Yes [] No

*VENDOR NOTE: In order to do business with the Government, all vendors *

* must be registered in the System for Award Management {SAM), *

* http://www.sam.gov. All invoices must be submitted via Wide *

* Area WorkFlow (WAWF) at https://wawf.eb.mil/. Exception to *

* WAWF submission MUST include a statement why electronic invoice*

* submission is an undue burden. Statement MUST be included with*

* quote. *

TERMS DISCOUNT DAYS NET

FOB

EST COST

The Government

[ ] DEST

Prefers Destination

[ ] OTHER

EST SHIPPING COST: $ _

SHIPPING POINT:

GSA/FSS

Principle Place of Performance City/State

[] YES NBR: _ [ ]NO

001 QTY: 1. 00 LO

PART NBR: VJ PIPE - LN2

VACUUM JACKETED LN2 PIPING TO EXTEND OFF

OF EXISTING AND CONNECT TO RELOCATED VBC

PHASE SEPARATOR.

INCLUDES:

(25) FT. OF 1/2" NPS X 2" NPS (304 SST,

SCH. 5) VACUUM JACKETED PIPE IN 1 SPOOL

SECTION WITH: (1) 5/8" CRYOWORKS BAYONET

ASSEMBLY, (1) FLEX SECTION, (25) FT. OF

STANDARD FLEX - 3/ 4 11 ID X 1 1/2" ID, (2)

1/211 ELBOWS

MAWP = 150 PSIG

SERVICE= LN2

http://www.sam.gov/

JACKET= BRUSHED SST

INTERNAL BELLOWS FOR EXPANSION AND

CONTRACTION

OPTIONS:

ADD OR DEDUCT 3/4 11 X 1 1/2 11 VJ FLEX FOR

FEED LINE

ADD OR DEDUCT 1 1/4" X 2 1/211 VJ FLEX

FOR VENT LINE

Unit Price Total Price Est Delivery Date

QTY:

1. 00 LO

PART NBR: INSTALLATION

LABOR TO INSTALL ABOVE LN2 PIPING AND TO

CONNECT RELOCATED PHASE SEPARATOR TO MBE

WITH EXISTING VACUUM INSULATED LINES.

Unit Price Total Price Est Delivery Date

Total$:

File details come from the government source that posted it.