Attachment_1_-_Specifications.pdf

PDF 55 KB Posted

Attached to
Radome Federal contract opportunity
Solicitation number
N00173-17-Q-SE01
Issued by
Department of the Navy Secretary of the Navy Office of Naval Research

About this file

Specifications

View the file

Other files for this federal contract opportunity

Other files attached to Radome, newest first.
File Type Posted
Attachment_3_-_Ring_Wall_Aerial_View.pdf PDF
Attachment_2_-_Ring_Wall_Design_Drawings.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ: N00173-17-Q-SE01

Attachment -1

SPECIFICATIONS FOR RADOME

The Naval Research Laboratory is procuring a Radome to cover an existing antenna on an existing infrastructure. The Radome shall meet the following minimum specifications:

1. The radome shall meet the following requirements:

a) 68-ft diameter radome, 81% truncation

b) 200 mph wind operational load

c) Optimized electromagnetic transmission performance:

a. Threshold: 12-16 GHz, <= 1dB total transmission loss

b. Objective: 1.5-16 GHz, <= 1dB total transmission loss

d) White colored radome panels

e) Hydrophobic coating on radome panels

f) Anchor Bolt Template per Ringwall Interface Drawing (Attachment 2)

g) Anchor Foundation Base Hardware Kit to ensure proper and secure installation to ringwall

h) Aircraft Warning Lights to include Pulley Assembly, Maintenance Rope, Wiring Kit, LED bulbs

i) Lightning Protection rod, down-conductors and grounding kit

j) Interior Lighting Kit, 6 station with single LED floodlight and outlets

k) Full Vertical FRP Double Door (72”W x 84”H) and Vestibule, single door width 36”

l) Zenith Hatch w/ Electric Vent and wiring kit

m) Ventilation Blower with Base Vent(s) for air stratification

n) Base Vents and Panel Access Kit to include vents, panel hardware, exhaust and intake hoses, for connecting to government provided interior generator.

2. The vendor shall ship the radome and associated material to the installation location FOB Destination.

3. The vendor shall perform on-site installation onto existing ringwall and configuration support.

4. The vendor shall provide the following documents:

a. Operation and Maintenance Manual

b. Technical Manual

5. The vendor shall cost the following items separately:

a. Spare Panel Kit (1- lot is comprised of one each unique panel type)

b. Membrane Repair Kit

File details come from the government source that posted it. Updated .