Questions And Answers.docx
DOCX document 15 KB Posted
- Attached to
- Propulsor Device Machining
- Solicitation number
- N0016727Q1004
About this file
This is a Questions and Answers document providing clarifications to bidders on solicitation N0016727Q1004 for propulsor device machining.
The document addresses six key technical and contractual inquiries submitted by potential quoters. Regarding ultrasonic testing (UT) of the GFM component, the Government will provide it already completed with supporting certifications, eliminating this cost from contractor quotations. The R4 top cap configuration required is R4L-MOD. For R4 shim rings, the quantity of 160 refers to 160 complete sets of all shim items shown on the drawing, not individual rings. The solicitation will result in a single award rather than separate awards by CLIN. CMMC (Cybersecurity Maturity Model Certification) level requirements must match between prime contractor and subcontractor prior to award. The Naval Surface Warfare Center Carderock Division is issuing this small business set-aside solicitation for part machining services with a deadline for questions by November 4, 2026 at 12:00 PM Noon and quote packages due by November 12, 2026 at 12:00 PM Noon. All inquiries and submissions should be directed to Michael Bonaiuto at michael.j.bonaiuto.civ@us.navy.mil.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| GPE Post - Amendment.docx | DOCX document | |
| N0016727Q10040001.pdf | ||
| GPE Post - Adjusted NAICS.docx | DOCX document | |
| GPE Post.docx | DOCX document | |
| N0016727Q1004.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers
Will the GFM be supplied with ultrasonic testing (UT) completed and supporting certifications provided, or should the contractor include the cost of UT inspection in its quotation?
It will be provided with the UT Testing already completed.
For the R4 top cap, is the required configuration R4L or R4L-MOD?
R4L-MOD
For the R4 shim rings, does the quantity of 160 mean 160 complete sets of the shim items shown on the drawing, or 160 individual rings? Please confirm the item numbers and quantities required.
It would mean 160 completed sets.
Will this solicitation be awarded as a single award, or will individual CLINs be considered for separate awards?
This will be a single award.
Is the CMMC level required for both the prime contractor and subcontractor prior to award?
The CMMC level for the prime and subcontractor must match.