Attachment (A) - Draft Statement of Work.pdf
PDF 305 KB Posted
- Attached to
- 8800 Harshaw TLD Reader System Maintenance Services Federal contract opportunity
- Solicitation number
- N00167-24-SIMACQ-CD-63-0006
About this file
This document is a statement of work for maintenance services for Model 8800 Harshaw thermoluminescent dosimeter readers located at Naval Dosimetry Center and Naval Nuclear Propulsion Program sites. The contractor shall provide preventative and repair maintenance services, including two annual on-site visits to NDC locations and one annual visit to NNPP locations. Emergency repair response is required within 24 hours of failure notification for CONUS locations and within four days for OCONUS locations. The contractor must maintain configuration management and provide spare parts, software licenses and support, and radioactive material shipping in accordance with requirements. Appendix A lists NDC reader systems by location and serial number, and Appendix B does the same for NNPP reader systems. Appendix C is a maintenance and repair check sheet template.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
1. TITLE
Model 8800 Harshaw TLD Readers Maintenance Contract
2. OBJECTIVE/BACKGROUND
This Statement of Work (SOW) defines the maintenance (preventative and repair) service and support requirements for Model 8800 Harshaw thermo-luminescent dosimeter (TLD) Reader
Systems located at the Naval Dosimetry Center (NDC) and Naval Nuclear Propulsion Program
(NNPP) sites. The 8800 readers used by the NDC are identified in Appendix A and at the 8800 readers used by the NNPP are identified in Appendix B.
The reader systems include Model 8800 TLD reader, with Sr-90 irradiator, hardware, firmware, associated software, including WinREMS and Model 8800 reader process controller, and auxiliary equipment, such as technical manual and automated TLD holder opener, 10:1 PMT neutral density lens drawer and basic spare parts kit or enhanced spare parts kit.
3 . APPLICABLE DOCUMENTS
Maintenance services shall be in accordance with:
Publ. No. 8800-P-S-0200-00l Model 8800 Automatic TLD Card Reader Technical
Service Manual–Bicron/Thermo Fisher Scientific RMP
Publ. No. 8800PLUS-P-S-0307-001 Model 8800PLUS Technical Service Manual
4. SCOPE OF WORK
4.1 SERVICES FOR NNPP AND NDC
4.1.1 The Contractor shall furnish all materials, supplies, parts/components/assemblies, test equipment, tools, labor, travel, transportation, shipping, telephone technical support and any other items required to perform the maintenance services outlined in this Statement of Work (SOW). All visitors to the NDC and to NNPP facilities must be U.S. Citizens.
4.1.2 The Contractor shall provide two regularly scheduled on-site maintenance visits per year to the NDC locations identified in Appendix A. The two regularly scheduled visits shall be equally spaced throughout the year and be scheduled with the Government point of contact (POC) identified in Appendix D. The Contractor shall provide a maintenance service report in accordance with CDRL A001, and accompanied with Appendix C, to the location POC for each visit and for each piece of equipment serviced.
4.1.3 The Contractor shall provide one regularly scheduled on-site maintenance visit per year to NNPP locations identified in Appendix B. The Contractor shall schedule the visit with the Government POC in Appendix D. The Contractor shall provide a maintenance service report in accordance with CDRL A001, and accompanied with Appendix C, to the location POC for each visit and for each piece of equipment serviced.
4.1.4 The Contractor shall perform the preventive maintenance, including those services listed below, to maintain the system in optimum performance and working condition, in accordance with manufacturer’s specifications and user-selected operating parameters.
Preventive Maintenance services required are the following:
Routine and preventive maintenance as described in Model 8800 Automatic TLD
Card Reader Technical Service Manual 8800-P-S-0200-001 and Technical Service
Manual 8800PLUS-P-S-0307-001.
Cleaning, inspection, and testing of mechanical, electrical/electronics, optical and photronics subsystems and components.
Adjustment, as necessary, of system parameters (mechanical, electrical/electronic, optical and photronics) to within factory specifications.
Replacement of worn or broken parts and components.
Repair of any broken or malfunctioning components and equipment.
Calibration of instrument, circuit boards and components.
Installation of available firmware and software upgrades.
Inspections of all radioactive source assemblies to ensure all are safe and working properly. This inspection shall include checks/tests of the irradiator assembly to identify any component (e.g. shutter mechanism, spring, etc.) fatigue or performance degradation warranting service to improve performance and/or prevent failure.*
The Contractor shall replace, at a minimum, every three (3) years all internal reader fans. During each service visit the Contractor shall clean all reader fan guards (two in the Data Acquisition Module (DAM): one in heater power module and one in host computer), verify airflow on each fan and replace fans as needed.
* Any handling or repairs of radioactive source assemblies must be authorized by, and performed under the control and supervision of, the local Radiological Controls personnel and/or Radiation Safety Officer.
4.1.5 Technical Support: The Contractor shall provide a toll-free telephone/hotline service for technical assistance for operation, user-level maintenance, and troubleshooting of the system. Telephone support shall be available Monday through Friday, excluding Federal holidays, from 8:00 A.M. to 5:00 P.M. Eastern and Pacific Time, as a minimum.
Technical support, correspondence and information exchange via email is encouraged;
however, email service does not relieve the telephone support availability requirement.
4.1.6 Special Shipping Instructions for Radioactive Material (RAM):
4.1.6.1 Prior to shipment of radioactive material (RAM), including exempt quantities of RAM, the Contractor shall notify the receiving activity’s RAM receipt personnel by telephone and confirm receipt of such notification. Approval to ship will be provided by receiving activity. NNPP and NDC points of contact are provided in Appendix D. The Contractor will receive the instructions from the receiving organization’s RAM receipt personnel on how, when and what documentation is needed when delivering radioactive sources needed to maintain the readers. Radioactive sources include the transport rack with four
Carbon-14 sources and the Strontium-90 irradiator assembly. This requirement does not apply to complete 8800 readers containing these components.
4.1.6.2 The Contractor shall provide carrier information, tracking number and anticipated delivery date. Shipments shall not be made by the United States Postal Service.
Shipping documents shall include the following:
The statement “Radiological controls required for unpacking.” if the shipment contains US Department of transportation (DOT) radioactive class 7 material.
The statement “This package contains a small amount of radioactivity in a quantity not regulated under the US DOT Hazardous Materials Regulations. Radiological controls may be required when unpacking to comply with local requirements.” if the shipment contains only non-DOT radioactive material.
Identification number of each package
Security seal number, if applicable
Actual weights (gross, tare and net)
Isotope(s) and actual activity
The results of radiological survey and dose rate levels on the surface of each package and the external surface of each container in the package, if applicable
4.1.6.3 The bill of lading, including applicable DOT certification and conformance statements, shall be provided by the driver to the receiving facility.
4.1.6.4 Shipments shall be made under protective service, such as Protective Signature Service, to provide point-to-point custody transfer from origin to destination.
4.1.6.5 Shipments shall be made under the Contractor’s license, where applicable, and conform to all DOT regulations.
4.1.6.6 The Contractor shall not deliver material on a Federal Holiday or outside normal hours of operation (8:00 AM-2:30 PM local time), Monday through Friday.
4.1.7 Emergency Repair: In the event of a fatal reader error (reader becomes inoperable) between preventative maintenance visits, the Government location (NNPP or NDC) possessing the reader will attempt to repair the unit. In the case that the Government cannot repair the reader, and a backup reader is not available to maintain mission operations, then the Contractor shall make an accelerated emergency visit to the location to repair the disabled reader. Initial service response shall be within 24 hours, and the disabled reader shall be returned to service within three business days of failure notification for NDC and Continental United States (CONUS) NNPP locations. For
Outside Continental United States (OCONUS) NNPP locations, the disabled reader shall be returned to service within four business days of failure notification.
4.1.8 Emergency Distribution: In the case of a catastrophic event in which all processing capability of the NDC is eliminated, the Contractor shall provide two emergency 8800 readers, two emergency extremity (DXTRAD) readers, 20,000 whole body dosimeters and DXTRAD dosimetry. The dosimeters shall be in the form of 200 quality control cards (black substrates), 800 calibration cards (violet substrates), 19,000 field cards (red substrates), 1,000 DXTRAD elements, 400 rings, 400 caps and 150 substrates. The
Contractor shall provide readers within 48 hours of Government notification. The
Contractor shall provide quality control cards, calibration cards, 2000 field cards and all
DXTRAD dosimetry within seven calendar days of Government notification. The balance of dosimeters shall be provided at a rate of 1000 cards per week. The dosimeters and readers shall remain the property of the Contractor.
4.1.9 Maintenance Completion: Upon completion of maintenance services, the Contractor shall demonstrate for the on-site Dosimetry Technical or Quality Manager, satisfactory operation of the TLD reader system. Demonstration of proper dosimetry processing operations shall be accomplished with reader connected to the Navy’s dose processing and management system/network. Dosimeters shall not be processed in stand-alone mode when the network is available.
4.2 CONFIGURATION MANAGEMENT
4.2.1 If any changes are needed to the Model 8800 TLD Reader Systems hardware, firmware or software, the Contractor must submit an Engineering Change Proposal (ECP) in accordance with CDRL A002.
4.2.2 Hardware and firmware changes will be approved by the NNPP Corporate Dosimetry
Technical Manager (for NNPP) or the Naval Dosimetry Center Officer in Charge (OIC, for NDC). Software changes will be approved by the NDC or the Information
Technology (IT) Division of the NNPP DT-702/PD Dosimetry Program, Portsmouth
Naval Shipyard.
4.2.3 If the Government deems testing is required to verify that modifications or upgrades are acceptable, then the Contractor shall provide samples of the modified or upgraded components (in the configuration planned to be installed/implemented) for Government testing and approval prior to installation/implementation. In addition, the Contractor shall provide to the Government test results from any testing performed by the
Contractor.
4.2.4 The Contractor shall provide Technical/Service and Operator/User manual changes and revisions to NDC and to the NNPP DT-702/PD Dosimetry Program Technical Division, Norfolk Naval Shipyard, in accordance with CDRL A003.
4.3 SPARE PARTS
4.3.1 The spare parts kit staged at each NDC and NNPP location is considered part of the TLD
Reader System configuration. As such, each spare parts kit is required to have a full complement of operational parts, as listed in Appendix C page four. The Contractor shall ensure that any part removed from a spare parts kit for installation into a reader system under maintenance is replaced within 20 business days.
4.3.2 Any parts requiring replacement, in reader systems or spare parts kits, shall be replaced with identical operational and fully functional parts (all design functions of multi-purpose/function parts included), to the extent those parts/designs are still supported or available, in order to maintain unaltered physical and functional configuration of hardware, firmware and software. Otherwise, the Contractor shall submit an ECP to propose the design change.
4.3.3 All parts installed or provided as spares shall include appropriate markings, labels or other documentation to indicate all required performance inspections and/or acceptance tests have been passed for all design functions of the part.
4.4 SOFTWARE
4.4.1 The Contractor shall provide technical support for the Windows-based WinREMS, WinREMS SQL, WinCardID, 8800 Host software to include the host operating system, or other Thermo Fisher Scientific software. The service is to include the following:
Unlimited timely technical support for all above-named software maintained by Thermo
Fisher Scientific and support for the file types used for input or export from the above software.
Technical support relating to solutions of technical questions and/or problems conducted by telephone or via email.
Provision of updated software user and installation instruction manuals and provision of design overview documents with process flowcharts, as any of these documents become available.
Provision of software upgrades or software corrections, submitted and approved through the ECP process. The Contractor shall perform any necessary service visits to implement the changes.
4.4.2 Software Licenses: The Contractor shall provide the NDC and the NNPP DT-702/PD
Dosimetry Program IT Division system software (reader/dosimeter control, programming, etc.) license(s) to allow full distribution and use of software to/at the NDC and all Navy sites that use the Model 8800 TLD reader systems. These licenses shall apply to original software, as well as any version changes or upgrades submitted by the
Contractor and approved by the NDC or the NNPP DT-702/PD Dosimetry Program IT
Division.
4.5 GENERAL SECURITY REQUIREMENTS
4.5.1 These security requirements apply to contractor employees who require any of the following: physical access to any area of a federally controlled installation, facility or activity; access to CUI; access to a DON computer/network/system; and those who, as determined by DON, are assigned to a national security position or perform sensitive duties.
4.5.2 Access to Federal Facilities:
4.5.2.1 Contractors are considered visitors. Access to Government facilities/installations is at the discretion of the Government. The Government reserves the right to rescind access at any time. The Contractor, while on the installation, shall comply with all policies and requirements involving installation entry control and security.
4.5.2.2 Contractor employees shall complete all command specific in-processing requirements with the GCA Security Division upon arrival and out-process prior to departure at the completion of the individual’s performance under the contract.
4.5.2.3 The Contractor shall provide a personnel roster of all prime and subcontract personnel and submit to the COR and the CAC Trusted Agent via e-mail no later than 30 business days following award of the contract. This shall be updated monthly and when changes occur.
4.5.3 Common Access Card Issuance:
4.5.3.1 The CAC will be used as the identification credential for on-site contractors. A contractor must possess a valid need for physical access to government facilities or logical access to
DON IS. The COR is the competent authority in determining whether contractor support requires CAC issuance.
4.5.3.2 Contractor employees who have been issued CACs and/or badges, shall display the CAC at all times on outer garments, above the waist, when in DON spaces and removed from view when not in DON spaces. CACs or badges shall not be worn outside the installation nor used as personal identification, unless in the performance of the contract.
4.5.4 Controlled Unclassified Information:
4.5.4.1 The Contractor may require access to CUI. CUI is official information that requires the application of controls and protective measures for a variety of reasons and has not been approved for public release, to include technical information, proprietary data, information requiring protection under the Privacy Act of 1974, and Government-developed privileged information involving the award of contracts. CUI is a categorical designation that refers to unclassified information that does not meet the standards for
National Security Classification under Executive Order 13526, but is (a) pertinent to the national interest of the United States or to the important interests of entities outside the
Federal Government, and (b) under law or policy requires protection from unauthorized disclosure, special handling safeguards, or prescribed limits on exchange or dissemination.
4.5.4.2 The contractor shall comply with Information Security Directive (d), or successor publication.
4.5.4.3 Contractor personnel requiring access to CUI or user level access to DoD networks and information systems, system security and network defense systems, or to system resources providing visual access and/or ability to input, delete, or otherwise manipulate sensitive information without controls to identify and deny sensitive information, shall have security clearance eligibility.
5 POINT OF CONTACT
5.1 The Contracting Officer Representative (COR) for this contract is TBD.
5.2 The Technical Point of Contact (TPOC) for this contract is TBD.
5.3 The Alternate Technical Point of Contact (ATPOC) for this contract is TBD.
Appendix A
Table 1: NDC 8800 TLD Reader Systems
Location Model 8800 ID Number Serial Number
West Bethesda, MD NDC11 0805147
NDC12 0806148
NDC13 0807149
NDC14 0808150
NDC16 0809152
NDC17 1311180
NDC18 1311182
NDC19 1401186
NDC20 1401187
NDC21 1311184
NDC22 1311183
NDC23 1312185
NDC24 1311179
NDC8 0003091
NDC10 710143
NDC6-6600 9401084
NDC7-6600 9906181
NDC Number 6610 9403007
NDC Shipping reader1 DT648 107001
NDC Shipping reader2 DT648 206002
NDC Shipping reader3 8800ID 9909003
NDC Shipping reader6 1401015
NDC Shipping reader7 1401016
NDC Shipping reader8 1401014
NDC17-3500 810712
NDC4500 9911108
Appendix B
Table 2: NNPP 8800 TLD Reader Systems and Sites
Location Model 8800 ID Number Serial Number
West Bethesda, MD NSWCCD2 710005
NSWCCD3500 9510167
NSWCCD4500 0101127
8800 Shipping reader1 9909004
8800 Shipping reader2 107001
8800 Shipping reader3 1110013
Groton, CT NLON2 0310108
NLON3 0312109
NLON1 0410120
8800CARDID 0904007
Yokosuka, Japan Japan1 0803145
Japan2 0804146
West Mifflin, PA BAPL1 7036
Niskayuna, NY KSO1 0511128
KSO2 1402190
KAPL1 4032
KAPL2 5035
KAPL3 5034
KAPL4 1402188
KAPL8810 1012001
San Diego, CA NASNI1 0404114
NASNI2 0609137
LOMA1 0404115
Idaho Falls, ID NRF1 0403112
NRF2 0512130
Norfolk, VA NNSY1 0206097
NNSY2 0206100
NNSY4 0605133
NRMD3 0512131
NNSY5 0610138
NNSY6 0903159
NNSY7 001030
8800CARDID 0903005
Newport News, VA NGNN1 0309107
NGNN2 101045
NGNN3 101046
NGNN4 0909163
Charleston, SC NPTUCH1 0410122
NPTUCH2 0904161
Appendix B (continued)
Table 2: NNPP 8800 TLD Reader Systems and Sites (continued)
Pearl Harbor, HI PHNSY3 0707142
PHNSY1 0402110
PHNSY2 0402111
8800CARDID 0906009
Kittery, ME PNSY1 0206101
PNSY2 0206102
PNSY3 0810153
Bremerton, WA PSNS1 0406116
PSNS2 0608136
PSNS3 0206099
PSNS4 0206098
PSNS5 0304106
BANG1 0406117
8800CARDID 0905008
Kings Bay, GA TRFKB1 0410121
TRFKB2 0606134
TRFKB3 0903160
Santa Rita, Guam KAPL5 1402189
NSWCCD2 702002
8800 Shipping reader4 0903006
Appendix C
8800/Plus Navy Maintenance and Repair Check Sheet
Annual Procedures Based on 9 Year Cycle
If only repairs are performed, use the fourth page of Appendix C
Field Service Engineer (print name):
Signature: _______________________________________________________Date:
Navy Site: ____________________ Reader SN: _________________ Site’s Reader Name:
Service Event No: __________________________________
Procedure performed annually with listed steps at specified intervals:
AT 36 MONTHS, PERFORM ALL OF THE 12 MONTH ITEMS, PLUS:
___2F. Remove, clean and inspect Gas Heater Station
___6D. Replace all internal fans
AT 72 MONTHS, PERFORM ALL OF THE 12 AND 36 MONTH ITEMS, PLUS:
___3A. Replace carrousel belts.
AT 108 MONTHS, PERFORM ALL OF THE 12 AND 36 MONTH ITEMS, PLUS:
__8A. Remove, clean with dry air or nitrogen, and reseat all circuit boards (except Host
Computer boards)
__13. Calibrate Photronics boards, or exchange boards with calibrated boards
12 Month Maintenance Checklist
1. INITIAL ASSESSMENT
__A. Run the system to verify operation or demonstrate faults
__B. Review customer error log
__C. Perform actions in steps 2-4 without removing the internal irradiator (unless requested by the site representative)
2. TRANSPORT MECHANISM
__A. Remove Card Cartridges-check roller operation and feet
__B. Remove PMT Assembly-check heat sink/all connector tightness
__Check/clean Lens Drawer and PMT Assembly infrared lenses
Distribution:
A. One copy each of this completed form per reader and the Service Report shall be left with the site POC.
B. One copy of each form to the Field Service Dispatcher.
SERVICE CYCLE MONTH: 12 24 36 48 60 72 84 96 108
__Clean Star Shutter grooves
__Check Drawer Retention Pin operation
__C. Remove Carrousels (Carrousel Maintenance in step 3)
__D. Remove rack, clean and inspect all rack/card track areas, reference light glass and gear teeth
__E. Remove and Clean PZRD LED boards and PZRD sensor holes
3. CARROUSEL ASSEMBLIES
__A. Check Carrousel Belt tension, alignment, and shaft adjustment
__B. Lubricate Carrousel Geneva mechanism with bearing grease
Appendix C (continued)
4. RACK DRIVE ASSEMBLY
__A. Check rack drive gear
__B. Check/adjust backlash
5. REASSEMBLE TRANSPORT MECHANISM
6. FANS/FILTERS
__A. Remove back panel of the reader. Inspect components in the back of the reader and clean as needed. Caution: Fan power cords limit movement until disconnected.
__B. Remove/clean rear panel fan filters and verify fan operation. Replace filters/fans if damaged or worn.
__C. Clean other fan guards (Two in D.A.M., one in Heater Power Module, one in host computer). Verify airflow of each.
7. INTERNAL/EXTERNAL CABLING, HOSES, GAS SYSTEM, GENERAL CIRCUIT
BOARDS
__A. Check/repair any damaged cabling, hoses or loose harnesses
__B. Clean all circuit boards not previously cleaned, while they are in place in machine, with dry air or nitrogen
__C. Suggest improvements in external cable/hoses/peripheral connections (PC, Printer, Nitrogen, etc.) for easier use and serviceability.
8. SOFTWARE/FIRMWARE/HARDWARE UPDATES
Complete the table below and review the information with the designated site contact.
SOFTWARE REVISION LEVELS: WinRems___________________________
HOST_____________________ TRANSPORT____________________
PHOTRONICS_________________
NOTE TO MAINTENANCE TECHNICIAN: Do not perform hardware or software updates without authorization from site POC.
9. VERIFY MACHINE PARAMETERS AS LISTED: (All temperatures Celsius)
Display Thermocooler temperature: ________ (10 ± 2°C)
Gas Manifold Pressure Regulator Gas Pressure: A) All Valves Closed (30±2 PSI):
B) All Valves Open (> 25 PSI):
Gas Manifold Gas Flow Rates – AS FOUND:
Flow Meter Scale (Choose one):
A. 0 to 100 (40 ±2) Flow Rates: A_____ B_____ C_____ D_____
B. 0 to 65 (27 ±2) Flow Rates: A_____ B_____ C_____ D_____
C. 5 to 60 (27 ±2) Flow Rates: A_____ B_____ C_____ D_____
Gas Manifold Gas Flow Rates – CORRECTED (if necessary): Flow Rates: A_____ B_____
C_____ D_____
Heater Controller Board - EB #_____________________________ Rev ________
AS FOUND Heater temperatures at maximum (260°C) and preheat (165°C) temperatures:
Digital Thermometer Reading Host Display Reading
(260.0 ± 0.5°C) i _____ ii_____ iii_____ iv_____ (260±3°C) ) i _____ ii_____ iii_____ iv_____
(165.0 ± 0.5°C) i _____ ii_____ iii_____ iv_____ (165±2°C) ) i _____ ii_____ iii_____ iv_____
CORRECTED (if necessary) Heater temperatures at maximum (260°C) ) and preheat (165°C) temperatures:
Digital Thermometer Reading Host Display Reading
(260.0 ± 0.5°C) i _____ ii_____ iii_____ iv_____ (260±3°C) ) i _____ ii_____ iii_____ iv_____
(165.0 ± 0.5°C) i _____ ii_____ iii_____ iv_____ (165±2°C) ) i _____ ii_____ iii_____ iv_____
Verification of reader nozzle measurement:
-Remove PMT Assembly from Main Plate.
-Position the Shuttle until the caution note on the Shuttle is to the left of the nozzles.
-NOTE: DO NOT TOUCH THE THERMOCOUPLE! Touching the thermocouple on top of the nozzle could and probably will result in a catastrophic failure of the thermocouple, requiring disassembly and repair of the Gas Heater Assembly. DO NOT TOUCH THE THERMOCOUPLE.
-Using a calibrated vernier or depth gauge, measure the depth from the top of the nozzle to the ledge surrounding the nozzle. NOTE: The measuring device must be perpendicular to the top surface of the ledge.
-The resulting dimension will be taken for all four nozzles.
-The resulting dimension shall be 0.040 ± 0.010”
MEASURED DIMENSIONS:
AS FOUND: CORRECTED:
i _______ i _______ ii _______ ii _______ iii _______ iii _______ iv _______ iv _______
__10. Perform an Electronics QC check, Adjust Photcal as required and Reconfirm step 9 if any adjustments were required
NOTE TO MAINTENANCE TECHNICIAN: Sites may request the use of extender boards for the check of heater temperatures. The individual site will determine the need for these boards.
___11. Review Spare Parts Kits.
___12. Operational Checks
Allow the machine to run 25 cycles and other calibration checks as requested by customer
COMMENTS:
ADDITIONAL ITEMS FOR NEXT TRIP:
End Routine Maintenance, Complete the next page for non-routine (repair) part replacement
Repair Parts Used and Non-Routine Repair Detail
Item Detail
I. Common Parts/Assemblies
PMT
PMT Stop Pin (P/N 161793)
PMT Fan Assy. (P/N 26410)
Motors/Fans
Carrousel Motor (P/N 21675)
Rack Motor (P/N 24232)
Rear Panel Fan (P/N 151217)
D.A.M. Fan (P/N 151649)
Fan Bracket (P/N 29004)
Lower Front Fan (P/N 151035)
EMT Filter (P/N 162054)
Fan Guard (P/N 151652)
Carrousel
Cam follower Bearing
Cartridge Sensor (P/N 241417)
Position Sensor (P/N 241361)
Carrousel Belts (P/N 161528)
Circuit Boards D.A.M
Digital/Analog Bd. (P/N 26768)
Digital/Analog Cable (P/N 27227-2)
Heater control Bd. (P/N 26802)
Transport Control Cage
Motor control Bd. (P/N 26422)
Solenoid Sensor Bd. (P/N 26262)
Transport controller Bd. (P/N 26547)
Transport Mechanism
PZRD Sensor BD (P/N 23801)
Bar Code System
Bar Code Scanner Module Rev B. (P/N 500701)
Bar Code Decoder BD. (P/N 500765)
II. Additional Parts Used
Appendix D
Navy’s NNPP and NDC TLD Reader System POCs
Technical and IT Division POCs: The NNPP TLD Reader Systems are managed by the NNPP
DT-702/PD Dosimetry Program and Information Technology (IT) Divisions.
Corporate Dosimetry Technical Manager:
Provided at time of award.
Corporate IT Division Manager:
Corporate Quality Manager:
Naval Dosimetry Center Technical POC:
File details come from the government source that posted it. Updated .